HomeMy WebLinkAboutMiscellaneous~i Q Vto~- ~'(~~i~a
y,~,~ ~hi~ ~y;~„~ da„ Vz1 C~.;k,~
~~ ~ ~ 13 5. ~~-
~~ _c
use ~ ,~ ~ ~,~.~., - w1,~ l ~'~~~ w~ ,
`~
~!
~~
C.~,tr..l ~~ Wt:
~~ ~ f
~ ~°"
Name of Subdivision
P&Z Case No. s`~a~~
Date Received ~
MINIMUM REQUIREMENTS FOR FILING RESUBDIVISION, REPEAT OR
AMENDING APPLICATIONS
l . Film positive plus 16 folded copies of the plat.
2. Attached application completed in full.
3. $200.00 handling/filing fee.
4. Acknowledged signatures of all owners of subject land.
Paid Tax Certificates from:
a_ City of College Station
b. Brazos County
c. College Station Independent School District
6. All replats require a public hearing.'
ADDITIONAL REQUIREMENTS if subject land is zoned R-l, R-lA or R-2:
1. Notice in newspaper 15 days prior to public hearing.
a. Applicant pays $50.00 to cover cost.
b. City prepares and places ad in newspaper.
2. Notice to landowners within 500 feet of subject lot(s) if there are more than 100 lots in the
subdivision, or notice to all landowners in subdivision if there are 100 or fewer lots in the subdivision..
a. Planning Division prepares list of owners from approved Tax Rolls.
b. Applicant pays $4.00 for each person on above list (handling fee).
c. Applicant furnishes reduced copy of replat with a location map (8 1/2 x 11).
d. City prepares and mails notification with copy of replat to above owners.
* EXCEPTIONS TO PUBLIC HEARINGS. & NOTIFICATION:
L If replat corrects errors on previous plats.
2, If number of lots is not increased.
3. If replat only involves relocation of lot line(s) to eliminate inadvertent encroachment.
~~*
PLEASE NOTE THAT THE PLAT CANNOT BE SCHEDULED FOR PLANNING AND ZONING
COMMISSION MEETING UNTIL ALL OF THE ABOVE REQUIREMENTS HAVE BEEN ]NIET.
***
DEADLINE: Received in the Planning Division by noon 22 days prior to a Planning & Zoning
Commission meeting. Regular meetings held first and third Thursdays of each month. Notify Planning
Division at least 3 working days prior to deadline date to allow time for preparation of list of
landowners to receive notification.
MIN(ALL CITY ORDINAN ES MUST BE META)TS
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers)
C~``- 1. Drawn on 24" x 36" sheet to scale of 100' per inch.
r,,.
f~ 2. Name R: address of subdivider, recorded owner, planner, engineer and surveyor.
3: Name & address of all lenders on the property.
0" 4. Name & address of all easement holders.
[ 5. Proposed name of subdivision (not spelled or pronounced similarly to any other subdivision
in Brazos County, Texas).
6. Date of preparation, scale in feet and north arrow.
~. a. key map (vicinity map) not necessarily to scale.
~°`'~' 7. Application fee.
lJ 8. Approved construction documents on 24" x 36" sheets.
^ 9. Paid tax certificates from City of College Station, Brazos County and the C.S.LS.D.
10. Total area intended to be developed.
v~..-
1 1. Subdivision boundary lines indicated by heavy lines.
12. Certificate of Ownership & Dedication;
Certificate of Surveyorship and/or Engineer;
Certificate of City Engineer;
Approval of Commission;
Approval of City Council;
Certificate of the County Clerk.
(Owner(s)' signature(s) must be in place before taking plat to P&Z for consideration).
,.. ,
f~°`'~~ 13. Number of lots.
^ a. number of lots by Zoning District.
^ b. average acreage of each residential lot by Zoning District.
14. Approximate area of street right-of--way.
1 S. Proposed parkland dedication information.
~; 16. Requested oversize participation items, if any.
,,, 4., 17. Location of the One Hundred Yr. Floodplain according to the most recent available date.
l~ 18. If more than 1 sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch.
~~" 19. Exact location, dimensions, name and legal description of all existing or recorded streets,
alleys, reservations, easements or other R.O.W. within the subdivision, intersecting or
contiguous with boundary or forming boundary with accurate dimensions, bearings or
deflection angles and radii, area, center angle, degree of curvature, tangent distance and
length of all curves.
20. Same information for proposed streets, alleys, etc. as preliminary plats.
21, Lot corner markers and survey monuments (by symbol) and tied to basic survey data.
22. Street, alley, and sidewalk plans, profiles and sections, with specifications and detail cost
estimates.
>, 23. .Sanitary sewer plat with 2 foot contours, plan and profile lines, showing depth and grades,
` with cost estimates.
24. Water line plat showing fire h--ydrants, valves, etc. with specifications and a detailed cost
estimate.
25. Storm drainage system plat with 2 foot contours, street lines, inlets, storm sewer and
drainage channels, with profiles and sections, and showing drainage and runoff areas, and
runoff based om 5, 10, and 25 year rain intensity. Detail drainage structure design and
channel lining design if used, with specification and detail cost estimate.
26. Street lighting plan showing location of lights, design, and with specifications and detail cost
estimate.
27. Submit a statement addressing an_y differences between the final plat and approved Master
Preliminary Plat & Plan.
~> ._ 28. Indicate an_y variances reduested and reasons for same.
30. Are there impact fees associated with this development?
31. Add a general note that no private sewage facility may be installed on any lot in this
subdivision without the issuance of a license by the Brazos County Health Unit under the
provisions of the private facility regulations adopted by the Commissioners Court of Brazos
County, pursuant to the provisions of Section 21.004 of the Texas Water Code.
r~ms,~~imwipsans-9s
SEPTEMBER 28. 1995
NATALIE THOMAS - CITY OF COLLEGE STATION
SUBJECT: PROJECT REVIE:v COMMITTEE MEETING tti~EDNESDAY,
OCTOBER 4, 1995.
GTE COMMENTS
FINAL PLAT - S LNANDUAH PHASE ONE'; PROPOSED REPEAT OF BLOCK
B, A 1.2 ACRE RESERVE TRACT LOCATED ON THE
SOUTH~:EST CORNER OF STATE HIGHG•:AY' S A^1D SOUTHERr1
PLAItiTTATION DRI~v'E, TO BE DI ~'IDED IItiTTO Tti'O C-N
COMMERCIAL NEIGHBORHOOL_~ TRACTS. ;95-'~30;
GTE COMMENTS: NO PROBLEM
FINAL PLAT - ESTATE AT RIVER RUN
SUBDIVISION LOCATED
THE INTEP~SECTI0~1 OF
RIDGE I:V THE CITY'S
DI.jIDED INTO 57 RES
TRACTS (95-237)
PHASE II; PROPOSED
TO THE NORTH OF PHASE ONE AT
PAI:~TT TRAIL AND THOP~UGHBRED
E.T.J. TOTALING 258.03 ACRES
IDENTIAL LOTS AND TWO RESERVE
GTE COMME"1TS : NO PROBLEM
FIAAL PLAT- HAR.TEY HILLSIDES; PP~OPOSED RESUBDIVISIOhJ OF LOT
21, BLOCK 3 OF THE HARVEY HILLSIDES SUBDIVISION
IN THE CITY'S E.T.J. TOTALI*dG 4.930 ACRES
DIVIDED I:~TTO 2 RESIDENTIAL LOTS. (95-238)
GTE COMMENTS: NO PROBLEM
THANKS,
~~~ ~
LA t7ERNE AKIN
GTE
September 26, 199.5
To Whom It May Concerxi:
The 1994 taxes are still showing due as of this date in the
amount of $936.61 on Account R40950. This property was bought
by Triple B Construction, Inc.. at the December 6, 1994 Tax
Sale. There are excess proceeds for this property in the
Registry of the Court that are enough to cover these 1994 taxes.
It is my understanding that Triple B Construction, Inc. is in
the process of applying for these funds to pay the taxes.
The Tax Office will be able to issue a clear Tax Certificate
once the taxes are paid. Should you have .any questions, please
contact me at 775-1888.
Sincerely,
Megan Ye ger
Area Manager
Calame, Linebarger, Graham & Pena
:.:... .
..;..
...
.:,.:,
~._ 1 ;::: .::.,
._ :. j.. _ ... ....... :.' .._ ...... ... ........_ ...~ ...
.... 49 v -7 ;; t >;......r :::: i::.S 1 ~ .S..r i...: ~. ~ .~.. .: [ 4 1:::~ :, - ',';:' i 'I"I':[ t.:, i
.:
•:-::
...
'-.: F
. .:: :•.p: . ::: `.
~ .,. ':., i .: ...
~ i .j.. .., ~ ... ....... ... ......:. .. ... .... .:. .... ........... ._ .,. ... .... .... .., .. .... ... .... ... ...
' .f. .n ... ''
~ ... ;.
..; ;....
...: t f 1 .. ... .' ,~.. ~.. .
i r
-.. .: I. 4.. ~- :... .4. .... i'i C::: i': :~ :}
•.: .
. r:•'•: Y. y.......
:... :': :..tl i :: 1; ;~;..~:.:
;..:
...:~ 1::~. ~...., .. i.~`s ....... ... .....
i..-9
~1
.. '._.
,;.
i i.. a .... ~ .. ...
: r e : ::.i v j: :t.
: i....._.. ... .:... .: : ~i
- :^ ...: :.... ....r
E: i:" ~ '
....
•:.r... ... :•: ... :. ...: .~~~:•
• ' i' L: {':' I i::
f!. i•i i Ye'i :'Y 1 i•~! i _i'~f'• i:i ~ (•: E'4 t~~ .i !'.~ i ~'I
...... .. ti., .; .,. . .
.F. l...! {... i.:i .~.. i.: i.s. 5;: ~ .r. i...l . i. .i. .. ~ i. i., ~.: .... ... .. ..... ....... .. ........ ... .... ...: f. -...j 1:'-i:::: [. ' ~+:.F .i .. ... ., .. .. ., ",-i