HomeMy WebLinkAboutMinutesSTAFF PRC REPORT
Shenandoah Phase Three
Case #95-235
Ordinance Requirements:
Provide a revised master preliminary plat showing the revised phase lines.
_ Clarify the drainage easement on the plat and in the general notes section as a
drainage easeme t ~- ~(p - ~ caB- ~ ~ ,
_ Staff is still working with the Shenandoah Homeowners Association concerning park land.
Park land dedication for Phases One, Two and Three will be required with Phase Four of
tl~ venelopment. r
Comments/Concerns.
_ Staff recommends that the developer explore the possibility of installing screening along
Barron Road in compliance with the Street Ordinance. This should help soften the impact
of the back yard fence line along Barron Road. (Since the preliminary plat for this phase
was approved prior to the adoption of the Streetscape Ordinance, screening is not a
requirement but a suggestion.)
SUBMIT 13 COPIES OF THE REVISED FINAL PLAT AND MASTER PRELIMINARY
PLAT BY FRIDAY, SEPTEMBER 29, 1995 FOR P&Z ON OCTOBER 5, 1995 AND CITY
COUNCIL ON OCTOBER 12, 1995.
-~J ~A-
~~aK-"-~
~-
PRESUBMISSION CONFERENCE REPORT
September 21, 1995
TO: Edward Froehling
3887 High Lonesome, College Station, TX 77845
Michael R. McClure, McClure Engineering
1722 Broadmoor, Suite 210, Bryan, TX 77802
FROM: Project Review Committee
Sabine Kuenzel, Senior Planner ,
Veronica Morgan, Assistant City Engi ~
Others Attending f
Natalie Thomas, Planning Technic
Shirley Volk, Development Coordinat r
Tony Michalsky, Electrical Operations Coordinator
Laverne Akin, G.T.E. Representative
George McLean, CSISD Representative
SUBJECT: Final Plat -Shenandoah Phase Three; proposed subdivision totaling 11.013 acres
divided into 41 single. family lots generally located southeast of Barron Road, west
of Shenandoah Phase Two and north of Hunter Creek Drive. (95-235)
A Presubmission Conference meeting was held Wednesday, September 20, 1995 to discuss the
above mentioned final plat. The following is a list of ordinance requirements identified by
the Presubmission Conference. This list does not relieve the applicant of total compliance
with all current ordinance requirements.
Ordinance Requirements:
Provide a revised master preliminary plat showing the revised phase lines.
Clarify the drainage easement between lots 25 and 26 on the plat and in the general notes
section as a "public" drainage easement.
Label Strausburg Circle so that it is clear that the street name extends on both sides to end
at Kernstown Lane.
Staff is still working with the Shenandoah Homeowners Association concerning parkland.
Parkland dedication for Phases One, Two and Three will be required with Phase Four of
this development. If the developer chooses to dedicate money in lieu of land, the
following amounts for all three phases will be added to the parkland dedication required
for Phase Four:
Phase Oy~e 26 lots x $225 per lot = $5,850
Phase Tivo 391ots x $225 per lot = $8,775
Phase Three 41 lots x $225 per lot = $9,225
Total for Phases 1 - 3 = $23,850
PRC Report
Shenandoah Three
Case #95-235
Page 2 of 2
Comments/Concerns:
_ Staff recommended that the developer explore the possibility of installing screening along
Barron Road, to the rear of lots 26 - 35, in compliance with the Streetscape Ordinance.
This should help soften the impact of the back yard fence line along Barron Road. (Since
the preliminary plat for this phase was approved prior to the adoption of the Streetscape
Ordinance, screening is not a requirement but a suggestion.)
_ Off-site public utility easements may be required to service this phase of the development.
Coordinate electrical service details with Electrical Operations Coordinator Tony
Michalsky at (409) 764-3660.
_ Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409)
821-4723.
SUBMIT 13 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, SEPTEMBER 29, 1995
TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR
THE MEETING OF OCTOBER 5, 1995. THE CITY COUNCIL WILL CONSIDER THE
FINAL PLAT ON THURSDAY, OCTOBER 12, 1995. BOTH MEETINGS WILL BE HELD
AT 7:00 P.M. IN THE COUNCIL ROOM OF THE COLLEGE STATION CITY HALL
LOCATED AT 1101 TEXAS AVENUE SOUTH.
x~ Regular Item
Consent Item
Statutory Item
Item Submitted By:
For Council Meeting Of:
Director Approval:
Executive Member Approval:
Veronica J B Morgan Asst. Citv Engineer
October 12 1995
Ends Statements /Strategic Issues: #2 -Parks & Recreation, & #8 -Civic
Pride
Item:Consideration of a Final Plat for Shenandoah Phase Three and a
Revised Master Preliminary Plat for Shenandoah Phases Two -Five, located
southeast of Barron Road. (95-235 & 94-314)
Item Summary: This final plat consists of 11.013 acres and is being
subdivided into 41 single family lots. The property is currently zoned R-1. A
preliminary plat of this property was approved by Council in September of last
year. The preliminary plat had shown differenf phase lines than depicted on
this final plat. The applicant desired to change the phase lines to avoid having
any temporary dead-end streets, where a temporary cul-de-sac may be
necessary. Staff concurred with the new phase lines and requested that the
applicant submit a revised master preliminary plat depicting these new
locations. A Presubmission Conference was held for this plat on September
20, 1995. At this meeting a few comments were raised. Due to the fact that
the preliminary plat was approved before streetscape requirements were
adopted, streetscape compliance is not mandatory for this plat. However, staff
did request that the developer voluntarily comply with streetscape. The
Planning and Zoning Commission will hear this plat at their October 5, 1995
meeting. The Commission vote and minutes of that meeting are not available
as of this writing. Staff will inform the Council of the Commission's vote during
the Council presentation.
y ,,}.
Financial Summary:N/A
Staff Recommendation: Staff recommends approval of the final plat and the
revised preliminary plat.
City Attorney Recommendation:N/A
Council Action Desired:Approve or deny the final plat and the revised
preliminary plat.
Supporting Materials:
1. Location Map
2. Staff Report
3. Application
4. Copy of Plat