HomeMy WebLinkAboutMinutesMINUTES
Planning & Zoning Commission
CITY OF COLLEGE STATION, TEXAS
September 21, 1995
7:00 P.M.
COMMISSIONERS PRESENT: Acting Chairman Hall and Commissioners Lane, Gribou, Garner
and Lightfoot.
COMMISSIONERS ABSENT: Chairman Hawthorne and Commissioner Smith..
STAFF PRESENT: City Planner Kee, Assistant City Engineer Morgan,
Transportation Planner Hard, Senior Planner Kuenzel, Assistant
City Engineer McCully, Planning Technician Thomas, Graduate
Civil Engineer Homeyer and .Development Coordinator Volk.
(Council Liaison Crouch was in the audience.)
AGENDA ITEM NO. 1: Approval of minutes from the meeting of September 7, 1995.
Commissioner Gribou moved to approve the minutes from the meeting of September 7, 1995 as written.
Commissioner Lightfoot seconded the motion which passed unopposed (5 - 0).
AGENDA ITEM NO. 2: Public hearing to consider a final plat request for lot 9R of the
Sandstone Subdivision located at the intersection of Sandstone and Oakwood Drives. (95-233
Assistant City Engineer Morgan presented the staff report and recommended approval of the final plat
with the comments outlined m the Presubmission Conference report. The applicant is requesting a
replat of lot 9R; a 3.93 acre lot in the Sandstone Addition. The original lot is being subdivided into two
lots with one being 1.97 acres and the other being 1.96 acres. As a part of the replat, the applicant will
be removing the overhead power lines, placing them underground and dedicating an easement for such.
Sewer will also be extended to lot 9RA and to Oakwood Trail. There has been opposition expressed to
this replat by the surrounding property owners. The concerns that have been expressed are related to
deed restrictions that exist in the Sandstone Addition. Despite the concerns that the residents have, this
plat is in conformance with the City's development policies and standards and subdivision regulations.
The City's control of subdivisions is limited to these ordinances and not deed restrictions.
Commissioner Hall opened the public hearing.
Applicant Hubbard Kennady of 8900 Sandstone approached the Commission to answer any questions
pertaining to the proposed plat. He stated that what is proposed is in line with the overall scheme of the
neighborhood and the lots created are larger than other lots within the subdivision. Mr. Kennady stated
that there have been numerous violations of the deed restrictions including violations by individuals that
oppose this request.
The following surrounding property owners spoke in opposition to the final replat:
Tony Jones 710 Canterbury, Original Developer of the Subdivision
Mary Eikenhorst 2000 Oakwood Trail
Raymond Lowe 8707 Sandstone Drive
Leona Lowe 8707 Sandstone Drive
Comments concerning their opposition to the final replat:
(1) The deed restrictions have been in effect since the original development of the
subdivision in 1977. At that time, all owners purchased lots and built their homes with
the understanding that no new lots would be created. At that time, the smallest lot was
1.97 acres.
(2) The Architectural Control Committee informed Mr. Kennady of his violation of the deed
restrictions as well as the previous denial to subdivide the subject property.
(3) If this subdivision is allowed to occur, it could create a domino effect.
(4) The value of a new lot will be borne by the existing homeowners. Subdividing the lot
will damage the aesthetic quality of the neighborhood and will block the view of the
existing lake.
(5} When Mr. Kennady purchased the property a year ago, he knew the history behind
subdividing the lot and the strict deed restrictions prohibrtmg him to do so.
(6) Even though the lot is 1.96 acres, the majority of the lot includes the existing lake so
there is a small, limited area in which a house can be built.
Commissioner Hall closed the public hearing.
Commissioner Lane moved to recommend approval of the final-plat request for lot 9R of the Sandstone
Subdivision located at the intersection of Sandstone and Oakwood Drive. Commissioner Lightfoot
seconded the motion.
Commissioner Hall stated that he understands the concerns of the surrounding homeowners; however,
the City cannot enforce deed restrictions. The applicant has complied with all zoning and subdivision
regulations.
The motion to recommend approval of the final plat passed (4 - 1 - 0); Commissioner Gribou abstained.
AGENDA ITEM NO. 3: Public hearing to consider a conditional use permit request to allow
the use only of a fire station on lot 2 of the Holleman Place Subdivision. (95-709)
Senior Planner Kuenzel presented the staff report and recommended approval of the use permit request
including the driveway variance request. If the use only is approved,- the City will continue with
preparation of the site plan, which will return to the Commission for final approval. The property was
recently rezoned from C-1 General Commercial to R-5 Medium Density Apartments. The request for
R-5 was approved due to the fact that R-5 is considered more compatible with the R-1 to the south than
the C-1 would have been. The City has submitted a conceptual site plan for the purposes of receiving
input from the Commission. The proposed layout shows a building located around the center of the
property with emergency vehicles entering and exiting using two access drives off of Holleman. The
plan shows a third access point onto Richards Street for secondary employee access. The subdivision
plat shows a 15' visual screening buffer that is planned to be maintained and increased to protect most
of the existing wooded area within the first 60' of the lot on the residential side.
P & Z Minutes September 21, 1885 Page 2 of 7
PRESUBMISSION CONFERENCE REPORT
September 6, 1995
TO: Earl Havel, Garrett Engineering
4444 Carter Creek Parkway Suite 108, Bryan, TX 77802
Emmett Hubbard Kennady III
8900 Sandstone Drive, College Station, TX 77845
FROM: Project Review Committee
Sabine Kuenzel, Senior Planner
Veronica Morgan, Assistant City Engineer
Charles Smith, P&Z Representative
Others Attending
Natalie Thomas, Planning Technician
Shirley Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
SUBJECT: Final Plat -Sandstone Addition Replat; proposed resubdivision of lot 9R of the
Sandstone Addition totaling 3.93 acres divided into two single family lots located
on the corner of Sandstone Drive and Oakwood Trail. (95-233)
A Presubmission Conference meeting. was held Wednesday, September 6, 1995 to discuss the
above mentioned final plat. The following is a list of ordinance requirements and comments
identified by the Presubmission Conference. This list does not relieve the applicant of total
compliance with all current ordinance requirements.
Ordinance Requirements:
Provide a minimum 15' public utility easement to cover the existing overhead power line
on lot 9R. If the owner chooses to relocate the existing line, he is responsible for all costs
associated with the relocation.
_ Provide an additional 5' of public utility easement along the south side of lot 9RA to allow
for the installation of the proposed sanitary sewer extension.
Submit an :additional $113.00 to cover the notification costs associated with the replat.
Comments/Concerns:
_ Staff requested that an additional 5' public utility easement be acquired along the south
side of lot l OR to allow for the maintenance of the sanitary sewer line. This dedication is
NOT a requirement; however, it would help in the future maintenance of the line.
SUBMIT 13 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, SEPTEMBER 15, 1995
TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR
THE MEETING OF THURSDAY, SEPTEMBER 21, 1995. THE CITY COUNCIL WILL
CONSIDER THE FINAL PLAT ON THURSDAY, OCTOBER 12, 1995. BOTH MEETINGS
WILL BE HELD AT 7:00 P.M. IN THE COUNCIL ROOM OF THE COLLEGE STATION
CITY HALL LOCATED AT 1101 TEXAS AVENUE SOUTH.
:::
::::::::::>:::>::<;:<:»:<::>:>:>::::>::::::::::.:::::::::>:;:<:>>....... en d a hte m C ave r~..S.
. .:::.::........::.::::..:..................:.::::::.::::::::::A.......... _ ..:.:::::..::::::::::.:::::::.:::::::.;:::.::::::.:::::::::::.:_:.:.::::::::::::::.:::::::::.~::::::::::::::.
x^ Regular Item
Consent Item
Statutory Item
Item Submitted By: Veronica J.B. Morgan, Asst. City Enaineer
For Council Meeting Of: October 12. 1995
Director Approval:
Executive Member Approval:
Ends Statements /Strategic Issues:
Item: Public Hearing and consideration of a Replat of Lot 9R of the Sandstone
Addition, located at the corner of Sandstone Drive and Oakwood Trail.
Item Summary: The applicant is requesting a replat of Lot 9R, a 3.93 acre lot,
in the Sandstone Addition. The original lot is being subdivided into 2 lots with
one being 1.97 acres and the other being 1.96 acres. As a part of the replat,
the applicant will be removing the overhead power lines, placing them
underground and dedicating an easement for such. Sewer will also be
extended to Lot 9RA and to Oakwood Trail in accordance with the Foxfire
Sanitary Sewer Master Plan.
(95-233).
There has been opposition expressed to this replat by the surrounding
property owners. The concerns that have been expressed are related to deed
restrictions that exist in the Sandstone Addition. Despite the concerns that the
residents have, this plat is in conformance with our development policies and
standards and our subdivision regulations. The City's control of subdivisions
is limited t these ordinances and not deed restrictions. The Planning and
Zoning Commission heard this item at their September 21, 1995 meeting and
recommended approval with staff recommendations.
Financial Summary:N/A
Staff Recommendation: Staff recommends approval of the plat with the PRC
comments.
City Attorney Recommendation: N/A
Council Action Desired:Approve or deny the final plat.
Supporting Materials:
1. Location Map
2. Staff Report
3. Application
4. Copy of Plat
5. P&Z Minutes
6. Letters of Concern
PRESUBMISSION CONFERENCE REPORT
September 6, 1995
TO: Earl Havel, Garrett Engineering
4444 Carter Creek Parkway Suite 108, Bryan, TX 77802
Emmett Hubbard Kennady III
8900 Sandstone Drive, College Station, TX 77845
FROM: Project Review Committee
Sabine Kuenzel, Senior Planner
Veronica Morgan, Assistant City Enginee
Charles Smith, P&Z Representative
Others Attending
Natalie Thomas, Planning Technician
Shirley Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
SUBJECT: Final Plat -Sandstone Addition Replat; proposed resubdivision of lot 9R of the
Sandstone Addition totaling 3.93 acres divided into two single family lots located
on the corner of Sandstone Drive and Oakwood Trail. (95-233)
A Presubmission Conference meeting was held Wednesday, September 6, 1995 to discuss the
above mentioned final plat. The following is a list of ordinance requirements and comments
identified by the Fresubmission Conference. This list does not relieve the applicant of total
compliance with all current ordinance requirements.
Ordinance Reckuirements:
_ Provide a minimum 15' public utility easement to cover the existing overhead power line
on lot 9R. If the owner chooses to relocate the existing line, he is responsible for all costs
associated with the relocation.
_ Provide an additional 5' of public utility easement along the south side of lot 9RA to allow
for the installation of the proposed sanitary sewer extension.
Submit an additional $113.00 to cover the notification costs associated with the replat.
Comments/Concerns:
_ Staff requested that an additional 5' public utility easement be acquired along the south
side of lot l OR to allow for the maintenance of the sanitary sewer line. This dedication is
NOT a requirement; however, it would help in the future maintenance of the line.
SUBMIT 13 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, SEPTEMBER 15, 1995
TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR
THE MEETING OF THURSDAY, SEPTEMBER 21, 1995.. THE CITY COUNCIL WILL
CONSIDER THE FINAL PLAT ON THURSDAY, OCTOBER 12, 1995. BOTH MEETINGS
WILL BE HELD AT 7:00 P.M. IN THE COUNCIL ROOM OF THE COLLEGE STATION
CITY HALL LOCATED AT 11D1 TEXAS AVENUE SOUTH.
Y~i'\ /
~ 'n/
// ~ \ p l
/ P I
a
STAFF PRC REPORT
Sandstone Addition Replat
Case #95-233
Ordinance Requ~ir~e/m/e~nts: ~~~?~°`''
°~r "" ~ Y
_ Provide a ~' public utility easement to cover the existing power line on lot 9R.
(Check with Tony to make sure that this really needs an easement and is not just a service
line.}'`-• ~-,~~ • ~lc~'~ ~ -~ .
_ Provide an additional 5' public utility easement along the ~ side of loth 9RA
to allow for the installation of the proposed samta sewer extension.~((~fa ids -"~~.~.Q.:
requesting that the additional 5' be dedicated along the side of lot lOR; however, ~~~~~=-
this is not a requirement.)
_ Submit an additional $~ to cover the notification costs associated with the replat.
SUBMIT 13 COPIES OF THE REVISED REPEAT BY FRIDAY, SEPTEMBER 15, 1995 FOR
P&Z ON SEPTEMBER 21, 1995 AND CITY COUNCIL ON OCTOBER 12, 1995.