HomeMy WebLinkAboutMiscellaneousi i I EYI G
Consulting Engineers ®Land Surveyors
4103 Texas Avenue, Suite 212 T~ei. (409} 846-6212 P.O. Box 4234
Bryan, Texas 77802 Fax (409) 846-0652 Bryan, Texas 77805
WE TRANSMIT:
^ Under Separate Cover
Enclosed
VIA:
^ Mail
Messenger
^ Federal Express
^ Express Mail
^ Special Courier
^ Picked Up By Your Office
THE FOLLOWING:
Prints
^ Copies
®riginals ° I
Platy lam.
^ Field Notes
^ Plans
^ Report
^ Estimate
^ Cut Sheets
^ Computer Printout
^ File
^ Contract
FOR:
^Your Review & Approval
^Your Review & Comment
^Your Review & Distribution
^Your Review, Revision & Return
^Your Signature ~ Return
^Your File and/or Use
^ As Requested By:
^ Please Acknowledge Receipt of
Enclosures
^ Please Return Enclosures To Us
^ Copies Of This Letter Of Transmittal
Sent To:
66NO. DESCRIPTION
~rY.~
.~ )( ~ i i e;.'
~d ~. '~~~t-~" tr f~ ~-g">
!f Enclosures Are Not As Noted,
Please Notify Us At Once.
Signed:
~~' ,' ~
IE~~.ING ~NGINI<EIZING ~ ~UI~~~~.~IrING
Consult.-ng ~nginecrs • Land ~ur.'cyors
4103 Texas Avenue, Suite 212 Post Office Box 4234
Bryan, Texas 77802 Bryan, Tcxas 77805
Tclcphonc 409/846-62 t 2
Fax 409/846-8252
B.J. Kling, P.E., R.P.LS.
S.M. Kling, R.P.L.S.
December 8, 1995
City of College Station
ATTIV: Kent Laza
P.®. Box 9960
College Station, TX 77840
Dear Kent,
~~
We are requesting oversize participation on the construction of a 12 waterline
for the Crystal Park Subdivision. With this application are engineer's estimates for
the two waterlines associated with this project. We appreciate your consideration on
this matter. ~ "
Thank you,
~. ,
S. M. Klir
Engineer's Estimate
12" Water Line
Crystal Park Subdivision, Phase One
College Station, Brazos County, Texas
Revised January 18, 1996
OVERSIZE
12'° Water Line
ITEM
NO.
QTY
1 1
2 1
3 400
4 1
5 t
6 1
7 1
8 1
9 1
10 1
11 1
PROPOSED
8'° V9ater Line
ITEM QTY
nin
UNIT
LS
LS
LF
EA
EA
EA
EA
LS
EA
EA
LS
UNIT
ITEM
Trench Safety
Disconnect and remove all existing 8"
Water line and Appurt.
12°' CL 52, D_I.P. Water Line - 4'-8' Bury
Embedment CL "D"
24"x12" M.J. Concentric Reducer
12" Gate Valve with box
12"x6°' M.J. Tee
Reconnect existing Fire Hydrant and appurt.
Bore under existing drive - 18" Casing
12"x8" M.J. Tee
12" M.J. Cap
Seeding Disturbed Areas
ITEM
UNIT PRICE TOTAL
$820.00 $820.00
$500.00 $500.00
$32.00 $12,800.00
$850.00 $850.00
$800.00 $800.00
$198.00 $198.00
$800.00 $800.00
$2,100.00 $2,100.00
$250.00 $250.00
$100.00 $100.00
$1,000.00 $1,000.00
TOTAL: $20,218.00
10% CONTINGENCY: $2,021.80
$22,239.80
UNIT PRICE TOTAL
1 1
2 400
3 1
4 1
5 1
6 1
7 1
LS
LF
EA
LS
EA
EA
LS
Trench Safety
8" cl 52, D.I.P. Water Line - 4'-8' Bury
Embedment CL "D"
Reconnect existing Fire Hydrant and appurt.
Bore under existing drive - 12" Casing
8" M.J. Cap
8"X8" M.J. Tee
Seeding Disturbed Areas
$820.00 $820.00
$25.00 $10,000.00
$800.00 $800.00
$1,400.00 $1,400.00
$75.00 $75.00
$150.00 $150.00
$1,000.00 $1,000.00
TOTAL: $14,245.00
10% CONTINGENCY: $1,424.50 _
$15,669.50
,~ ~- c a
~ `I.~~pi~BR~''11Cp~~
~ . ~-.~~
r ~`'~'~
,.~ra..~..,~. •KLI
~r
DIFFERENCE: $6,570.30
9,