Loading...
HomeMy WebLinkAboutMinutesSTAFF PRC REPORT Oakwood Middle School Final Plat Case #95-221 Discretionary Items: None. Ordinance Requirements: Is lot 1, block 1 a buildable lot? (Veronica & Sabine to determine this.) _ Staff is concerned with the wording on the Timber, Holik and Anderson Streets on the acreage "to be dedicated". This dedication should take place with this final plat. On Anderson Street, show where the existing right-of--way is located including the paved section. How much right-of--way dedication is there on the west side and how far back from the existing right-of--way line? (Dimension the Anderson Street cross-hatched area.) _ There are parking spaces in here within 20' of the existing property line. (Staff requested that Kling flag the Anderson Street right-of--way in front of the Justice of the Peace building and teacher parking area. Veronica and Sabine to visit site to determine if this is acceptable.) Comments/Concerns: _ Coordinate electrical service details with Electrical Line Designer Don Lusk at (409) 764- 3 660. _ Provide easements. for the existing G.T.E. service lines. (Laverne Akin talked to Lisa Cantrell about these easements and the possibility of delaying the plat to place these easements on the final plat. Coordinate service details with G.T.E. Representative Laverne Akin at (409) 821-4723. PRESUBMISSION CONFERENCE REPORT June 22, 1995 TO: David Neal, CSISD 1812 Welsh, College Station, TX 77840 Lisa Cantrell, James C. Lancaster & Associates, Inc. 1812 Welsh, Suite 130-C, College Station, TX 77840 Stewart Kling, Kling Engineering 4130 Texas Avenue, Bryan, TX 77802 FROM: Project Review Committee Jane Kee, City Plan~4 Veronica Morgan, ~ nt City Engineer Larry Lightfoot, P&Z Representative Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator Don Lusk, Electrical Lme Designer Laverne Akin, G.T.E. Representative SUBJECT: Final Plat -Oakwood Middle School; proposed subdivision of the existing Oakwood Middle School site located along both sides of Holik Street at the George Bush Drive intersection into four lots totaling 38.583 acres.. (95-221) A Presubmission Conference meeting was held Wednesday, June 21, 1995 to discuss the above mentioned final plat. The following is a list of ordinance requirements identified by the Presubmission Conference. This list does not relieve the applicant of total compliance with all current ordinance requirements. Ordinance Requirements: _ Lot 1, block 1 must be a buildable lot according to the Subdivision Regulations and Zoning Ordinance. (Remove the 15' building line.) _ Staff is concerned with the wording on the Timber, Holik and Anderson Streets on the acreage "to be dedicated". Please revise to read "dedicated". Dimension the width and length of the Anderson cross-hatched dedication area. PRC Report Oakwood School Case #95-221. Page 2 of'2 Comments/Concerns: _ Coordinate electrical service details with Electrical Line Designer Don Lusk at (409) 764- 3660. _ Provide easements for the existing G.T.E. service lines. (Laverne Akin talked t:o Lisa Cantrell about these easements and the possibility of delaying the plat to place these easements on the final plat. Coordinate service details with G.T.E. Representative Laverne Akin at (409) 821-4723. SUBMIT 13 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, JUNE 30, 1995 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOP: THE MEETING OF JULY 6, 1995. THE CITY COUNCIL WILL CONSIDER THE FINAL PLAT ON THURSDAY, AUGUST 10, 1995. BOTH MEETINGS WILL BE HELD AT 7:00 P.M. IN THE COUNCIL ROOM OF THE COLLEGE STATION CITY HALL LOCATED AT 1101 TEXAS AVENUE SOUTH.