HomeMy WebLinkAboutStaff ReportSTAFF REPORT
Case No.: 95-205
Applicant: LaCour Investments
ITEM SUMMARY
This-property is located in the Wolf Pen Creek District along the south side of SH 30 (Harvey
Rd.). It is approximately 1050 feet east of the Texas Ave./SH 30 intersection, adjacent and
east of the existing Taco Bell. Previously approved is a preliminary plat dividing the property
into two lots, a 4.339 acre lot along SH 30 and the remainder as a reserve lot to the south.
Wolf Pen Creek runs through the property and by ordinance, property dedication is required if
the developer chooses not to develop the park area at this time. That plat was approved with
the conditions that Kyle Street be shown for future extension and the provision of access for
Taco Bell to the Kyle Street extension.
This is a final plat of the one lot that fronts on SH 30 and of the area to be dedicated for the
Wolf Pen Creek project. It was mentioned during the preliminary plat that the application
wished to defer the WPC dedication. Staff has been working on a development agreement
because of this. Since that time, the applicant has decided to dedicate the property. However,
there are still several other deferrals being requested so a development agreement is being
presented with this tnal plat.
STAFF RECOMMENDATION
Staff recommends approvals per the following:
The applicant is asking:
1. To defer the design. and construction of a 12" waterline.
2. To defer the submission of impact studies addressing the reserve tract until it final plats.
3. To defer the payment of back taxes on the property until the final plat is filed and the sale
can occur.
4. To deter the design and construction of a sidewalk along SH 30 until the site plan is
submitted for the lot being tnal platted.
5. To pay only part of the City's administrative costs for the preparation of this development
agreement.
6. City shall not make any future assessments against the developer for design or construction
of Kyle street where the ROW is being dedicated.
In consideration,forthese items staff recommends that the following be accomplished:
1. Developer shall design and construct a 12" waterline within 12 months of the date of the
agreement.
2. The Kyle street ROW through the WPC dedication and the reserve tract shall be dedicated
with this final plat.
3. An access easement shall be granted to Taco Bell with this final plat and their easternmost
curb opening closed within 30 days of the Certificate of Occupancy for the buyer of the lot
being final platted.
4. An access easement shall be granted with this final plat giving access to the WPC dedication
area.
5. When the City purchases ROW through the lot that is being platted now and constructs Kyle
Street through the entirety of the property, City reserves right to assess the lot currently being
platted for improvements.
6. Developer pays 50% of the administrative costs of this agreement up to $2,500.
COUNCIL POLICY ENDS STATEMENTS -The following Ends Statements that are in bold
are relevant to this particular case.
Transportation/Mobility -Citizens benefit from the ability to move into ,out of,
and within College Station in a sate and efficient manner.
Parks & Recreation -Citizens benefit from parks space and recreational activities
which are geographically and demographically accessible and serve a diversity of
interests.
_ Health & Public Safety -Citizens benefit from a reasonably safe and secure
environment.
Education/Information -Citizens benefit from access to broad based information and
knowledge.
Quality Service -Citizens benefit from a reasonable tax revenue for the value anti
quality of service delivered.
Cultural Arts -Citizens benefit from participation in the arts.
Employment/Prosperity -Citizens benefit from an environment that is conducive to
providing diverse employment opportunities.
Civic Pride -Citizens benefit from well planned, attractive residential and
commercial areas.
COMPREHENSIVE PLAN -The following are Goals and Objectives from the City's adopted
Comprehensive Plan that are applicable in this case:
COMPLIES WITH FUTURE LAND USE PLAN MAP?: YES
DEVELOPMENT GOALS AND OR,IECTIVES:
LAND USE
Avoid strip commercial: Size and depth of property meets policies
regarding strip commercial and Kyle extension will provide frontage ~on
two streets
TRANSPORTATION
Location of streets based on function: Includes partial Kyle ROW
dedication
Driveway access: Easement will be provided for Taco Bell so that
driveway access can be relocated
ECONOMIC DEVELOPMENT - NA
PARKS AND RECREATION
Link parks by pathways and natural features: This property has WPC
dedication area
HOUSING -NA
COMMUNITY APPEARANCE
Promote good site design: Good appearance, minimize drainage
impacts, and increase pedestrian safety -Will occur with development
of Lot l and eventual Kyle Street construction.
ENGINEERING COMMENTS AND IMPACT STUDIES -
Water -Water is available to Lot 1 through an existing line in SH 30. Demands
generated from the anticipated use on Lot 1 can be handled by the waterline along SOH
30. Water will need to be extended along the Kyle extension to loop the water system
between SH 30 and Holleman, thus providing an adequate connection for park
development and the reserve tract.
Sewer -Available and adequate to Lot l..
Streets -Access to Lot 1 is to SH 30 which is adequate to handle anticipated traffic..
Drainage -Drainage is currently overland toward the creeks Improvements made on
Lot 1 will .have to comply with the Drainage Ordinance and the Wolf Pen Creek
portion of the zoning ordinance at the time of site development.
Flood Plain -Flood plain is located on Lot 1 _
Sidewalks -Sidewalks w311 be required along SH 30 and along the Kyle
extension at the time of platting or site development.
Parkland Dedication -Not applicable to commercial. If multifamily develops,
parkland will be obtained at building permit. -
SUBDIVISION ORDINANCE COMPLIANCE
Variance Requested - Delay impact studies ,provision of water service and sidewalk
through development agreement.
Oversize Request -Staff anticipates a request on the 12" waterline along the Kyle
extension,. however, there has been no request submitted to date.
Easement Dedications - As shown on the plat.
ZONING ORDINANCE COMPLIANCE
Proposed. Use -Commercial development,
NOTIFICATION:
Legal Notice Publication(s):
Advertised Cortunission Hearing Date(s):4-209
Advertised Council Hearing Dates: 5-1 l-9~
Number of Notices Mailed to Property Owners Within 200' N/A