Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Case No.: 95-204 Applicant: Michael Davis, Owner, S.M. Kling, Engineer ITEM: CONSIDERATION OF A FINAL PLAT OF GREENSWORLD PHASE TWO, CONSISTING OF ONE COMMERCIAL LOT TOTALING 3.861 ACRES LOCATED ALONG SH 6 JUST NORTH OF THE EXISTING GREENSWORLD GOLF COURSE. ITEM SUMMARY AND STAFF RECOMMENDATION Staff recommends approval of case # 95-204 with the following comments. Staff would also state that the final plat will be filed for record when the City receives the approval letter from FEMA regarding the change in delineation of floodplain. ZONING AND LAND USE Subject Tract: C-2 Commercial Industrial North: R-l Single Family, vacant East: A-O Agricultural Open, vacant South: C-2 developed as golf course West: Across ByPass developed as Scott & White COMPREHENSIVE PLAN Land Use Plan: Reflected as Industrial Thoroughfare Plan: Not applicable Development Policies: No conflict Parkland Dedication: Not applicable ENGINEERING Water: Will be extending an 18 inch line along the frontage. Sewer: Sewer is existing on the property. Streets: Adequate capacity Drainage: Overland toward the creek. Private drainage easement on this plat will be maintained by Greensworld, per note on the plat. Flood Plain: Applicant is reflecting a proposed floodplain line on this plat. A fill permit has been filed with the City and a Letter of Map Amendment is to follow. This letter once submitted to FEMA and approved would approve the floodplain line as depicted on this final plat. Oversize Request: Is being requested on waterline, preliminary engineer's estimate shows request is for $23,000.00. Proposed Public Improvements: Waterline. Easement Dedications: As shown on plat Sidewalks: N/A NOTIFICATION: None required ADDITIONAL COMMENTS: The final plat as submitted varies from the preliminary in two ways: 1. The rear lot line is now moved forward toward the frontage road. This has changed the depth dimension of the lot slightly. 2. The applicant is applying to FEMA for a Letter of Map Amendment to relocate the floodplain off the property. There will no longer be any floodplain on this property. All this work will be done in compliance with the City of College Station Drainage Ordinance.