HomeMy WebLinkAboutStaff Report
STAFF REPORT
Case No.: 95-102
Applicant: Greg Taggart for Shabeer Jaffer
ITEM: PUBLIC HEARING AND CONSIDERATION OF A REZONING REQUEST
FROM R-ISINGLEFAMILY TO R-3 TOWNHOME, PART OF LOT 3, RANDALLS
UNIVERSITYP ARK.
ITEM SUMMARY AND STAFF RECOMMENDATION
The subject property includes 3..3. acres located adjacent to the Randalls detention area
at the end of Chimney Hill Drive. . Staff recommends approval.
The request is in compliance with the Land Use Plan and R- 3. uses are considered
compatible with R~l according to. the City's Development Policies. Chimney Hill
Drive contains another R-3 classification on the south side.
COUNCIL POLICY ENDS STATEMENTS - The following Ends Statements that are
in bold are relevant to this particular case. There are. no Ends Statements that
specifically address housing.
Transportation/Mobility
Parks & Rec.lCulturalArts/Civic Pride
Health & Public Safety
Education/lnformation/Employment/Prosperity
Quality Service
COMPREHENSIVE PLAN - The following are Goals and Objectives from the City's
adopted Comprehensive Plan. Applicable ones are in bold.
Complies with Future Land Use Plan Map?: Yes
Development Goals and Objectives:
LAND USE
Protection of residential uses: Request does not include
commercial encroachment.
Encourage use of vacant land w/ services: The property is
platted as a single lot and utilities are available to it. There is no
available vacant R-3property in the northern half of the City.
Avoid strip.commercial: N/A
TRANSPORTATION
Provide major arterials to prevent congestion: N/ A
Adequate pedestrian/bike movement:N/A
Ensure safety and ease ofmaintenance:N/A
Location of streets based on function: Chimney Hill
functions asa collector street.N/A
Driveway access: Will be coordinated through replatting or site
plan phase. Due to the fact that the property is located at the end
of a cul-de-sac that leads only to this property, access drive
restrictions will not be as crucial as in other parts of the City.
ECONOMIC DEVELOPMENT
Compatible with environment: Site will be difficult to
develop due to drainage and topography restrictions. The R-3 will
lend some flexibility in the use of the land.
Encourage retirees: NI A
Encourage tourism: NI A
PARKS AND RECREATION (Parkland dedication will be required at time of platting.)
Link parks by pathways and natural features: NI A
Combine parks with schools: N/A
HOUSING
Maintain integrity of existing supply: Request should not
impact existing supply significantly
Encourage diversified housing: Request will bring additional
townhomes to the area
COMMUNITY APPEARANCE
Promote good site design: NI A (will be addressed at time of site
plan review)
Prevent and eliminate unsightly conditions: NI A (see above)
ENGINEERING COMMENTS AND IMPACT STUDIES -
Water - Adequate water is. available in both Cooner and Chimney Hill to satisfy
the increased fire flow demands
Sewer - Adequate sewer is available in Chimney Hill to satisfy the increase
flows.
Streets - Chimney Hill is.~dequate to handle the residential uses, however
Cooner Street is seriously degraded. Access for this project should be restricted
to Chimney Hill, unless Cooner Street is repaired.
Traffic - Using standardlTE trip generation rates, the R-3 and R-l zones
generate about the same amount of traffic.
Drainage ~ Increase. in ilTIpervious cover due to . denser development must meet
Drainage Ordinance at time of site plan approval
Flood Plain - N/A
Sidewalks - N/A
Parkland Dedication - NIA
NOTIFICATION -
Legal NoticePublication(s):
Advertised. Commission Hearing Date(s): 2-16-95
Advertised Council Hearing Dates: 3-9-95
Number of Notices Mailed to Property Owners Within 200': 15
Response Received: 4 inquiries as of date of staff report; two in opposition
ADDITIONAL COMMENTS
The current zoning would allow single family development at a maximum of 26
dwelling units. The maximum density allowed under R-3 would be 46 units. The
physical constraints of the property, however, in conjunction with access, lot size, and
parking requirements would considerably lessen the number of actual units that could
be built.
There is some evidence. that the site may have been subdivided from the rest of Lot 3
without a formal subdivision plat having been submitted and approved. Should this be
the case, the property is in violation of the City's Subdivision Regulations and must
come into compliance before building permits will be issued.