CSISD Elementary School #5 at Pebble Creek
Case #94-707
~F~
~,!;~.~!
~ w
"" brand fax transmittal memo 7671 I # of pag/e~ -
Discretionary Items: ~ '
D Ph
i
None. Fa~#f ~ ~ Fax #~ /~ ~. /
__
Ordinance Requirements:
An end parking island is required. in the southeast parking area.
~, _ Clarify the property lines. (Hard to read.)
Provide a vicinity map.
Provide a north arrow.
Indicate the square footage of the buildings.
Show screening details. of the proposed dumpster location.
(~~ If signage is proposed for this site, submit details and elevation drawings to be
~ `~' - considered by the Planning and Zoning Commission as part of the conditional use
--Z-'~^ ~,a: permit request.
~~^~' _ Provide a landscape plan to be reviewed by staff prior to the Planning and
' Zoning Commission meeting on July 7, 1994.
Underground electrical service is required.
_ Complete and return the attached Electrical Service Request form.
_ The developer is responsible for 20% of the cost of electrical service.
~~~ ~ , _ The developer is responsible for he installation of conduit from the transformer
~ti~-- to locations designated by the City. Provide two 6" schedule 40 gray PVC
conduits, installed 48" depth to top of conduit, caution tape 18" above conduit,
~/7. C' and pull string installed in conduit.
~~~ " Install transformer pad and junction box pads per City design and specifications.
_ .Provide a temporary blanket easement (see the .attached form) for construction
purposes to be followed by a metes and bounds .descriptive easement or an as
built plat upon completion to cover the electrical system and release the
temporary blanket easement.
Staff PRC
csrsD #s
Case #94-707
Page Z of Z
_ Show t~, public utility easement along the complete length of the south
property line and the adjac`e~nt ~,0' public utility easement on the City's property.
i disconnect is required. e main .disconnect size.
Provide .two sets of water demands: (1) irrigation maximum demands in gallons
per. minute,. and (2) domestic minimum, maximum and average demands m
gallons per minute. A vault will be required for the domestic water service.
Submit sanitary sewer loadings. (Water and sanitary sewer demands and loadings
can be attached to the site plan or included with the construction documents.)
_ Submit public water line plans and obtain necessary easements.
~ e ,the ire ydrant assem c bP n~ more .than
On a e C1 the turnarounds ;and fire lanes without chap have an 8" red
Pg
stripe painted on the drive surface==~~~)~t~~fn-~~ park7n,~ fire_l e,
"...Add "tow away" to the note.
On page MEP1, relocate the fire hydrant in the turnaround area as indicated on
page C1.
Gsrv.~.a.~t' ~ ~ M.a.w
Comments/Concerns• ,,,~ ~~ V~ ~
~.
Submit clcctrical load ata:
_ The meter wiA be located on the transformer with CT's m...S~1:mt insl e he
secondary com rune f the tr rmer. e Burt aTrd`con ctor
installed by the el era e City wr make connection in transform r.)
_ Once~he transforms loc ion ,and route of service is de ded by e ~~1~.pe~
and the, ity, the City will m e electrical gout n ovi e a copy
of that lay t for t eloper to use fo late of conduits and pads.
Please make every effort to -keep trees and shrubs as far from public water and
sanitary sewer mains as possible.
_ The two existing street names should be reversed according to the Pebble Creek
Phase Five Master Preliminary Plat.
Is the southern adjacent ownership accurate?
.ti
PROJECT REVIEW CONIlVIITTEE
June 28, 1994
TO: .Lisa Cantrell, JCL & Associates
1812 .Welsh Suite :130 C, College Station, TX 77840
College Station Independent School District
1812 Welsh Street, College. Station, TX 77840
FROM: Project Review Committee
Sabine Kuenzel,', Staff Pla ~`
Veronica Morgan, Assista ty Engineer
Craig Hall, P&Z Representative
Others Attending.
Natalie Thomas;.., Planning Tec i i
Pete Vanacek, Parks Senior Plan er
Tony Michalsky, Electrical Operations Coordinator
Samantha Smith!, Engineering Assistant
Tim DeDear, -Fire Protection Specialist
>Laverne Akin, GTE Representative
SUBJECT: Conditional Use Permit - CSISD Elementary School #S; proposed
elementary school to be located in the Pebble Creek Subdivision on the
southeast corner `of '',marsh Boulevard and Parkview Drive. (94-707)
A Project Review Committee Meeting was held Wednesday, June 22, 1.994 to discuss the
above mentioned conditional use' permit request and site plan. Assistant City Engineer
Morgan moved to recommend approval of the proposed use .and site plan as submitted
with the following conditions:
CONDITIONS OF APPROVAL:
An end parking island is required in the southeast parking area near the
proposed bus turnaround.
Clarify the property lines.
_ Provide a vicinity map.
,/~ _ Provide a north arrow.
V _ Indicate the square footage of the buildings.
_ Show screening details of the proposed dumpster location.
_ Show any proposed attached and freestanding signage to be .considered by the
Planning and Zoning Commission as part of the conditional use permit request.
' PRC Report
Elementary School #S
Case #94-707
Page 2 of 3
_ Provide a landscape plan to be reviewed by staff prior to the Planning and
Zoning Commission meeting on July 7, 1994.
_ Underground electrical service is required.
_ Complete and return the attached Electrical Service Request form.
_ The developer is responsible for 20% of the cost of .electrical service.
_ The developer is responsible for the installation of conduit from the transformer
to locations designated by the City.: Provide two 6" schedule 40 gray PVC
conduits, installed. 48" depth, to top of conduit, caution tape 18" above conduit,
and pull string installed in conduit. _See the proposed route on the construction
documents.
Install transformer pad and junction box pads per City design .and specifications.
_ Provide a temporary blanket' easement (see the attached form) for construction
purposes to be followed by a metes and bounds descriptive .easement or an as
built plat upon completion to cover the electrical system and release the
temporary blanket easement.
_ Show the proposed 10' public utility easement along the complete length of the
south property line and the :adjacent proposed 10' public utility easement on the
City's property.
Provide two sets of water demands:' (1) irrigation maximum demands in gallons
per minute, and (Z) domestic minimum, maximum and average demands in
gallons per minute. A vault will be required for the domestic water service.
Submit sanitary sewer loadings. '.(Water and sanitary sewer demands and loadings
can be attached to the site p''lan or included with the construction documents.)
Submit public water line plans and obtain necessary easements.
On page C1, the turnarounds and fire lanes without curbs shall have an 8" red
stripe painted on the drive surface with 4" letters stating "No parking, fire lane,
tow away". Add "tow away" to he note.
On page MEP1, relocate the fire hydrant in the turnaround area as indicated on
page C1.
An all weather road surface must be installed and fire hydrants operable prior to
bringing combustible materials on site.
The developer must meet the' requirements outlined in the Drainage Ordinance
or obtain an agreement from the .City stating that the City will meet these
requirements for you on the adjacent Business Park.
The existing street names (Caddie, Birdie, Double Eagle, etc.) should be reversed
according to the Pebble Creek Phase Five Master Preliminary Plat.
_ Verify the adjacent ownership to the east and south of the subject property.
,~
~,
PRC Report
Elementary School #S
Case #94-707
Page 3 of 3
Staff Planner Kuenzel seconded the motion which passed unopposed (3 - 0). The
following comments were made by the various reviewing agents:
COMMENTS/CONCERNS:
Make every effort to keep trees and shrubs as far from public. water and sanitary
sewer mains as possible.
_ For G.T.E. facilities, show two 4 PVC pipes with pull string. The pipe .must be
covered by a 10' public utility :easement. G.T.E. will terminate outside (DMARC)
not on the inside as shown on the site plan. It is the developer/owner's
responsibility to place conduit and cable from G.T.E.'s DMARC point to the
mechanical room. Coordinate service details G.T.E. Representative Laverne
Akin at (409) 821-4723.
SUBMIT 10 COPIES OF THE REVISED SITE PLAN BY THURSDAY, JUNE 30,
1994 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION
PACKETS FOR THE. MEETING OF THURSDAY, JULY 7, 1994.. THE PUBLIC
HEARING WILL BE HELD IN THE CITY HALL COUNCIL ROOM, 1101 TEXAS
AVENUE AT 7:00 P.M.
MEETING NOTES
CSISD Elementary School #5 Project at Pebble Creek
Date: 22 June 1994, 9:00 am
Location: City of College Station Council. Room
Purpose: Staff Planning Review Committee Comments
Attendance: Lisa Cantrell, JCL Sabine Kuenzel, Planning Assistant
Tom Eyeington, JCL Veronica Morgan, Assistant to City Engineer
Tim Dedear, Fire Marshal's Office. Natalie. Thomas, Planning Technician
Tony Ivlichalsky, Electrical Dept Samantha Smith, Water/Wastewater Dept
Lavern Akin, GTE Craig. Hall, P&Z Board Member
Pete Vanacek, :Parks and :Recreation ,
Discretionary Items:
None
Ordinance Requirements:
1. An end parking island is required in the southeast parking lot (Correction needs to be on A1,
CI, MEP1)
2. Clarify the. property lines.. (Hard to read.) (Correction on all drawings.)
3. Provide a vicinity map (needs to be on Site Plan, AI).
4. Provide a northarrow (needs. to be on Site Plan, A1).
5. Show. screening details of the proposed dumpster locations.
6. If signage is proposed for this site, submit details. and elevation drawings to be considered by
the Planning and Zoning commission as part of the Conditional .use permit request. (Paul, I
plan. on taking a picture of the signs on the other campuses and submitting that for the review.
This item does not have to be part of the construction documents or contract at this time. It
can be bid and installed sometime in the future, busby submitting this now the city would only
have to .notify property. owners once:)
7. Provide a landscapeplan to be reviewed by staff prior to the Planning and Zoning Commission
meeting on July 7th, 1994 (CS office is obtaining this.)
8. CSISD side Extend the 10 ft - South Easement to span .the length of the property line (from
Marsh to the end of the play field area.) Note on all drawings that the l0 ft Easement on the
city side. of the south easement is a "Proposed" Easement. (Both should be extended the length
of the property.)
9. -Change the electrical service route that the service will not be a diagonal but will have a 900
and turn from a Junction Box up to the service location: Change the note from "two 4"
schedule 40 gray PVC" to "two 6" schedule..." (This needs to be changed on MEP1 drawing.)
10. On page MEPl, relocated the fire hydrant in the turnaround area as indicated on page C1.
Comments/Concerns:
1. Change the Street names of the? cul-de-sac street to the correct order. From West to East:
Caddie Court, Double Eagle Court, Pro Court, Birdie Court, Bogey Court.
2: Need to Change the ownership of the Southern Listing to "City of College Station, (Business
Park) Vol 1385, Page 14. '
JCL. 1 26 e. texas street
1 61 2 welsFi, suite 130c
grapevine, texas 76051 [B17] 329-0750
college station, texas 77640 (409] 693-5650
P & Z Draft Minutes
July 7, 1994
AGENDA .ITEM NO. 4: Public hearing to consider.. a conditional use .permit request for th ,use and site
plan of the CSISD Elementary. School #5 to be located in the Pebble. Creek Subdivision. ,, ~, ~;
Staff Planner Dunn presented the staff report. and recommended approval of the site plan as submitted. The
Project Review Committee (PRC) reviewed this project on June 22, 1994 .and recommended approval with
.several conditions relating to site plan elements that were .missing, including a .landscape plan. Since that
meeting,. the applicant has submitted revised site plans that address the conditions outlined in the PRC report
and a andscape :plan which exceeds the minimum point requirements. The applicant. has also included as part
of the.. permit request a freestanding sign_as shown on the site plan. Three surrounding property owners were
notified with no response.
Chairman Hawthorne opened the public hearing.
Lisa Cantrell, representative of the College Station Independent School District, approached the Commission
and offered to .answer any questions pertaining to the conditional use permit request and site plan.
Chairman Hawthorne closed the public hearing.
Commissioner Gribou moved. to grant a conditional use permit request for the use and site plan, including the
proposed freestanding sign, with staff recommendations. Commissioner Lightfoot seconded the motion which
passed unopposed (5 - 0).
AGENDA ITEM NO. 5: Consideration of a final plat of the Southwood Forest Phase Five Subdivision.
(94-214)
Project Engineer McCully presented the staff report and recommended approval of the final plat as submitted.
The Planning and Zoning Commission approved the preliminary plat without comment on February 17, 1994
and the City Council approved. the preliminary plat on March 10, 1994.
Commissioner Gribou moved to recommend approval of the final plat for the Southwood Forest Phase Five
Subdivision. as submitted. Commissioner Smith seconded the motion which passed unopposed (5 - 0).
AGENDA ITEM NO. 6: Consideration of a final plat of -the South Creek Phase One Subdivision for the
University Commons Apartments. (94222)
Assistant City Engineer Morgan presented the staff report and recommended approval with the conditions
outlined in the Presubmission Conference Report. The .Planning and Zoning Commission has reviewed and
approved a site .plan for an apartment complex on this property and the City 'Council has recently approved
the rezoning to Wolf Pen Creek (WPC) for lot 1, block 1 of the subject property. This proposal is fora multi-
family project which will have 240 living units on 16.5_ acres for a density of 14.5 units per acre. Most of the
project will be located on lot 1,..block 1 with approximately 6 acres located on lot 1, block 2. The WPC zoning
district provides for the dedication of the floodplain to the City for future development of public improvements
in the corridor. With. this plat, the applicant is dedicating. the floodplain area of lot 1, block 2 to the City. Lot
3 on the subject plat is not a buildable lot and does not have public utilities as noted on the drawing.
P & Z Minutes July 7, 1994 Page Z of 3