Loading...
HomeMy WebLinkAboutStaff ReportMEETING DATE: CASE NO.: APPLICANT: STAFF REPORT 4/21/94 94-703 GTE Mobilnet of South Texas Limited Partnership PROPERTY OWNER: JeffD. Bronson, Jr. and John G. Otts, Jr. REQUEST: Conditional Use Permit to allow a cellular telephone communications facility & tower. to locate on a triangular lot along the frontage of Highway 6 South on Tract 22. LOCATION: PHYSICAL FEATURES: Area: Dimensions: Frontage: Depth: Tract 22 of the A. Babille/S.W. Robertson Survey Approximately 73,150 square feet (1.756 acres) (triangular shape) approximate lengths: 650', 235',700' Approximately 235' along Hwy. 6 Frontage Rd. Approximately 650' AREA ZONING AND LAND USE: Subject Tract: A-O Agricultural Open; vacant land North: A-O Agricultural: Open; vacant land East: C-1 General Commercial; vacant land South: A-O Agricultural Open; vacant land West: Outside city limits; .Greens Prairie Substation LAND USE PLAN: ENGINEERING: Water: Sewer: Streets: Flood Plain: Transitional Area surrounded by Commercial (all adequate for proposed use) NOTIFICATION: Legal Notice. Publication(s): Advertised Commission Hearing Date(s): 4-21-94 Number.. of Notices .Mailed to Property Owners Within 200': 6 Response Received: None as ofdate of staff report STAFF COMMENTS: Conditional use permits are granted by the Commission, subject to appropriate conditions and safeguards, when the Commission finds: A. That the proposed use meets all the minimum standards established in the Zoning Ordinance for this type of use; B. That the proposed use. is in harmony with the purpose and intent of the zoning ordinance and the plan for physical development of the district as embodied in the comprehensive plan for the development of the City; C. That the proposed use will not be detrimental to the health, welfare,. and safety of the surrounding neighborhood or its occupants, nor be sub tantially or permanently injurious to neighboring property. (See sec. 14, Ordinance 1638) The P.R.C. will review this project after the application and site plan have been received. The site plan must also come before P&Z for final approval. The lot is a triangular fragment of an older tract that, due to its shape, is unlikely to develop as a larger. commercial use. It abuts a public utility substation and the request is in line with the existing and future land uses.