HomeMy WebLinkAboutMinutesPROJECT REVIEW COMMITTEE REPORT
March 31, 1994
TO: Tony Jones,. Legaey Construction
4475 Hicks Lane, College Station, TX 77845
FROM; Project Review Committee
Sabine Kuenzel, Staff Planner ~'
David Pullen, .City Engineer
Kyle Hawthorne, P & Z Chairman
Others Attending
Natalie Thomas,. Planning Technician
Susan Macdonald, Building'Technician
Tony Michalsky, Electrical .Operations .Coordinator
Samantha Smith, Engineering Assistant
Pete Vanacek, Parks Senior Planner
Tim DeDear, Fire Protection Specialist
Laverne Akin, GTE Representative
Mike Lavender, TCA Cable Representative
SUBJECT: Site Plan -Emile Fares Fourplexes; proposed fourplex to be located at
1812 Woodsman Drive lot 6A of block 2 of Woodwa Villa e Re lat
Y g P
Section 2. '(94-501)
~; A Project Review Committee Meeting was held Wednesday, March 30, 1994 to discuss
the above mentioned site plan. City Engineer Pullen moved to approve the site plan as
submitted with the following condition:
CONDITIONS OF APPROVAL:
_ Parkland dedication in the amount of $225 per living unit is required prior to
'? issuance of a building permit.
~'~ Planning and Zoning Commission Chairman Hawthorne seconded the motion which
passed unopposed (3 - 0). The following comments were made by the various reviewing
agents:
COMMENTS/CONCERNS:
Afire hydrant must be located within. 300' from the furthest point of the building
as the hose lays.. Show all existing and proposed fire hydrants on the revised site
a plan.
A .drainage development permit that includes the subject lot must be approved
prior to issuance of a building permit.
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE
REVISED SITE PLAN ATTACHED AND 4 ADDITIONAL REVISED SITE PLANS
ONLY TO CONTINUE WITH .PHASE II OF THE BUILDING PERMIT PROCESS.