HomeMy WebLinkAboutMiscellaneous Interoffice Memo _ ~ To: Sabine Kuenzel, Planning Division ~ ~ ~~ Fromt Jim Smith, Sanitation Divisi - ~- ~5 Date: February 2,.1995 Subjects Review of Project Review Committee Agenda; February 8; 1995 I want to make some comments on`the site plans scheduled for review on February 8. 1. Parking Lot Plan; H &M wholesale, Inc. - Thissite is operationaly correct. However, I think that the container can still be seen from the frontage road and Texas Ave. I am attaching a copy of this site with an optional location that will still be serviceable. 2. Parking Lot Plan; Driving Range - This site plan is OK as designed and will have Small Commercial service which is an automated container on wheels that will be located at the curb by the owner each collection day. These are my comments for these site plans. Please contact me if you have any questions. sabine2/js ~d02/14/95 10:39- ^L~409 764 3452 COLL STA PUB UTL ~. PROJECT REVIEW COMMITTEE 2-1$-96 PARKING LOT PLAN-H&M WHOLESALE INC THE CUSTOMER WIL1. NEED TO SUPPLY 2-2 JNCH CONDUITS FROM THE SOUTHWEST. PROPERTY CORNER NORTH. TO DEACON,THEN EAST TO THE CORNER OF DEACON & TEXAS THE CUSTOMER WILL NEED TO SUPPLY 2-21NCH CONDUITS FROM THE SOUTHWEST PROPERTY CORNER TO A POINT fN THE SOUTH PROPERTY LINE WHERE THE PADMOUNT TRANSFORMER WILL BE LOCATED THE CUSTOMER WILL SUPPLY CONDUITFROM THE PAD TRANSFORMER TO THE METER LOCATION. SIZE TO BE DETERMINED WHEN LOAD INFO IS AVAILABLE. THE CUSTOMER WILR BE RESPONSIBLE FOR 20%OF THE TOTAL COST TO SUPPLY ELECTRICAL'SERVICE. PARKING LOT PLAN-80VINE ELITE EXTEND THE UTILITY EASEMENT OUT TO LONGMIRE TO ALLOW FOR A FUTURE STREET LIGHT CIRCUIT. BRING 2-2 INCH CONDUITS ALONG THE ENTIRE LENGTH OF THE SOUTH PROPERTY LINE fOR THE STREET LIGHT CIRCUIT THE CUSTOMER WILL BE RESPONSIBLE FOR 20°k OF THE TOTAL COST TO SUPPLY ELECTRICAL SERVICE. LACOUR SUBDIVISION lQJ 002 WE NEED A 20 FT EASEMENT ALONG THE FRONTAGE OF HARVEY RD FOR FUTURE UNDERGROUND FEEDER ROUTE. THERE tS A POWER POLE iN THE PROPOSED ENTRANCE INTO THE PROPERTY WITH TRANSFORMERS ON IT WHICH SERVES TACO BELL.AT THE-TIME THE ENTRANCE i8 CONSTRUCTED ,A PADMOUNT TRANSFORMER WILL NEED TO BE INSTALLED TO', SERVE TACO BELL.THERE WILL BE A 100% CHARGE ON THE REMOVAL OF THE POWER POLE THE CUSTOMER IS RESPONSIBLE FOR 20% OF THE TOTAL COST TO $ERV~ THE DEVELOPMENT. SOUTHWOOD VALLEY SECTION 79 THERE IS NO CITY OF COLLEGE STATION POWER AT THIS SITE. HOW POWER WILL BE EXTENDED TO THIS SITE WILL BEDETERMINED BY WHAT IS GOING. TO BE BUILT ON THESE LOTS .EITHER WAY AN EXTENSIVE AMOUNT OF OFFSlTE CONDUIT WILL NEED TO BE INSTALLED BY THEDEVELOPER.PLEASE CONTACT DON LUSK AT 409-764-3502 FOR`FURTHER DISCUSSION. (409) 764-3500 August 29, 1995 Texas Department of Transportation 1300 N: Texas Ave: Bryan, TX 77803-2760 Attn:. Ja Pa e Y g RE: H&M Wholesale located at the southwest corner of the DeaconBus. 6 I, frontage road Dear Jay: It is my understanding that Roy Hammons has been in contact with you regarding the above referenced. project. I've attached the drawings as well as the permit. application. The City has made redline comments which the applicant has not addressed because of coordination that may be needed between the three of us. We would appreciate it if you { would review this at your earliest convenience and if necessary contact me or the; applicant for additional information. Because this area is one that we may maintain through our maintenance agreement, we would like to enforce our 18" minimum pipe size... It is :difficult for us to clean. anything smaller. If you'll note, I have not signed the permit and will withhold .signature while we work together to get Mr. Hammons.a complete set of comments/concerns. T nks for all your help.. cerely, onica .)\ rgan Asst. City Engineer. attachments cc: Shirley Volk, Development Coordinator Steve Home er, Graduate En neer Y g Samantha Smith, Engineering. Asst. Roy Hammons file Home of Texas A&N4 University CITY OF COLLEGE STATIOI`I Post Office $ox 9960. ' 1101 Texas Avenue College Station, Texas 77842-9960