I want to make some comments on`the site plans scheduled for review on February 8.
1. Parking Lot Plan; H &M wholesale, Inc. -
Thissite is operationaly correct. However, I think that the container can still be seen from the frontage
road and Texas Ave. I am attaching a copy of this site with an optional location that will still be
serviceable.
2. Parking Lot Plan; Driving Range -
This site plan is OK as designed and will have Small Commercial service which is an automated
container on wheels that will be located at the curb by the owner each collection day.
These are my comments for these site plans. Please contact me if you have any questions.
sabine2/js
~d02/14/95 10:39- ^L~409 764 3452 COLL STA PUB UTL
~.
PROJECT REVIEW COMMITTEE 2-1$-96
PARKING LOT PLAN-H&M WHOLESALE INC
THE CUSTOMER WIL1. NEED TO SUPPLY 2-2 JNCH CONDUITS FROM THE SOUTHWEST.
PROPERTY CORNER NORTH. TO DEACON,THEN EAST TO THE CORNER OF DEACON &
TEXAS
THE CUSTOMER WILL NEED TO SUPPLY 2-21NCH CONDUITS FROM THE SOUTHWEST
PROPERTY CORNER TO A POINT fN THE SOUTH PROPERTY LINE WHERE THE
PADMOUNT TRANSFORMER WILL BE LOCATED
THE CUSTOMER WILL SUPPLY CONDUITFROM THE PAD TRANSFORMER TO THE
METER LOCATION. SIZE TO BE DETERMINED WHEN LOAD INFO IS AVAILABLE.
THE CUSTOMER WILR BE RESPONSIBLE FOR 20%OF THE TOTAL COST TO SUPPLY
ELECTRICAL'SERVICE.
PARKING LOT PLAN-80VINE ELITE
EXTEND THE UTILITY EASEMENT OUT TO LONGMIRE TO ALLOW FOR A FUTURE
STREET LIGHT CIRCUIT.
BRING 2-2 INCH CONDUITS ALONG THE ENTIRE LENGTH OF THE SOUTH PROPERTY
LINE fOR THE STREET LIGHT CIRCUIT
THE CUSTOMER WILL BE RESPONSIBLE FOR 20°k OF THE TOTAL COST TO SUPPLY
ELECTRICAL SERVICE.
LACOUR SUBDIVISION
lQJ 002
WE NEED A 20 FT EASEMENT ALONG THE FRONTAGE OF HARVEY RD FOR FUTURE
UNDERGROUND FEEDER ROUTE.
THERE tS A POWER POLE iN THE PROPOSED ENTRANCE INTO THE PROPERTY WITH
TRANSFORMERS ON IT WHICH SERVES TACO BELL.AT THE-TIME THE ENTRANCE i8
CONSTRUCTED ,A PADMOUNT TRANSFORMER WILL NEED TO BE INSTALLED TO',
SERVE TACO BELL.THERE WILL BE A 100% CHARGE ON THE REMOVAL OF THE POWER
POLE
THE CUSTOMER IS RESPONSIBLE FOR 20% OF THE TOTAL COST TO $ERV~ THE
DEVELOPMENT.
SOUTHWOOD VALLEY SECTION 79
THERE IS NO CITY OF COLLEGE STATION POWER AT THIS SITE. HOW POWER WILL BE
EXTENDED TO THIS SITE WILL BEDETERMINED BY WHAT IS GOING. TO BE BUILT ON
THESE LOTS .EITHER WAY AN EXTENSIVE AMOUNT OF OFFSlTE CONDUIT WILL NEED
TO BE INSTALLED BY THEDEVELOPER.PLEASE CONTACT DON LUSK AT 409-764-3502
FOR`FURTHER DISCUSSION.
(409) 764-3500
August 29, 1995
Texas Department of Transportation
1300 N: Texas Ave:
Bryan, TX 77803-2760
Attn:. Ja Pa e
Y g
RE: H&M Wholesale located at the southwest corner of the DeaconBus. 6
I, frontage road
Dear Jay:
It is my understanding that Roy Hammons has been in contact with you regarding the
above referenced. project. I've attached the drawings as well as the permit. application.
The City has made redline comments which the applicant has not addressed because of
coordination that may be needed between the three of us. We would appreciate it if you
{ would review this at your earliest convenience and if necessary contact me or the; applicant
for additional information. Because this area is one that we may maintain through our
maintenance agreement, we would like to enforce our 18" minimum pipe size... It is
:difficult for us to clean. anything smaller.
If you'll note, I have not signed the permit and will withhold .signature while we work
together to get Mr. Hammons.a complete set of comments/concerns.
T nks for all your help..
cerely,
onica .)\ rgan
Asst. City Engineer.
attachments
cc: Shirley Volk, Development Coordinator
Steve Home er, Graduate En neer
Y g
Samantha Smith, Engineering. Asst.
Roy Hammons
file
Home of Texas A&N4 University
CITY OF COLLEGE STATIOI`I
Post Office $ox 9960. ' 1101 Texas Avenue
College Station, Texas 77842-9960