HomeMy WebLinkAboutMiscellaneousNovember 17, 1994
To: Veronica Morgan
Engineering
From: Tim Dedear
Fire Protection Specialist
Re: Brazos Brewing Company
PRC
Fire lane stripes and curbs will contain the wording. "No Parking -Fire Lane- Tow Away Zone" painted in
four inch (4") white letters. 'Wording may not be spaced more than 15' apart.
Option 1
A sign 12" wide and 18" in height shall be mounted in a conspicuous location at each entrance to
the property.
OR
Option 2
From the point the fire lane begins to the point the fire lane ends, including behind all parking
spaces which ajoin a fire lane, shall be marked with one continuous 8" red stripe painted on the
drive surface behind the parking spaces.
Hydrant shall be located within 300' of any part of the structure as the hose is laid off the truck.
LAWRENCE * GRAUKE * ASSOCIATES
19 December 1994
LGA Sabina Kuenzel Senior Planner
ARCHITECTS ~
J~ City of College Station
College Station,. Texas
II
Re: Additions & Alterations
Brazos Brewing Company
College Station, Texas
Dear Ms. Kuenzel;
The site plan for the referenced project has been revised and conditions
of approval have been addressed as follows:
Discretionary Items:
* The sidewalk required along Dominik has been relocated.
* A raised island has been noted at the northwest corner of the site.
Ordinance Reauirements:
* A note was added that the site is not within the 100 year flood plain.
* Ownership and zoning of adjacent properties has been noted..
* New curb detail is attached.
* No pavement is to be .replaced. Existing asphalt is to be repaired.
* Fire .lanes and. signage have been noted.
* All parking islands are raised.
* An °'as built" landscape plan will be submitted prior to occupancy.
* The dumpster location is screened with an existing 6' wood fence.
Non Site-Plan Related:
* A drainage permit will be acquired prior to any. site work.
* The requested letter has been provided.
Comments/Concerns:
* The existing electrical service is not being upgraded.
* Relocated shrubs will be placed at least 5' from existing utility lines.
* Telephone service will be coordinated through GTE.
If you have any questions or need more information, please contact me.
Sincerely,
rchi is
C ad'Gra e, ,President
OCG/dg/BBC-COOS
1722 BROADMOOR, SUITE 100
BRYAN, TEXAS 77802
(409)776-4412
'A Brewpub with the finest locally. brewed ales & lagers In Texas"
PO Box 9369 College .Station, TX 77842.9369
te1:409-696-0406 - fax: 409-696-0351
Monday November 21, 1994 10:33 CST
Ms. Shirley J. Volt
Development Coordinator
City of College Station
PO Box 9960
College Station, TX 77842
Dean Shirley:
At the predevelopment meeting for Brazos Brewing Company some concern was expressed as to the
effluent which might be discharged into the sewer system. Since that meeting I have spoken with
brewpub principals in other communities, consulted with two manufacturers of brewing equipment,
and reviewed our planned processes for the use and discharge of water, cleaning compounds, and
brewery. waste products.
This letter will outline the waste handling policies, procedures and equipment proposed for Brazos
Brewing Company, a newly formed microbrewery/restaurant located at 201 Dominik. The brewery
is astate-of--the.-art 10 barrel brewery located in approximately 900 square feet adjacent to the
restaurant. The projected annual production is 1200 barrels (1 bbl = 31 gal). All. beer produced by
Brazos'Brewery will be sold 'on the premises, primarily by the glass. We will not have a bottling
plant and any: bottling will be done. by hand. Limited keg sales for donation .and promotional
purposes is intended. We expect to be brewing approximately 2-3 times per week to meet anticipated
capacity.
The brewery has been designed .and the equipment fabricated by Liquid Assets Brewing Systems
Company' of Santa Rosa, California, a nationally certified ASME fabrication facility. All of the
motors, switched, controls, boilers, coolers and otherhardware are also ASME certified equipment
that is of the highest industry standard. The brewhouse is constructed entirely of #304 stainless steel.
.Heating is done,by low.. pressure steam. jacketing around SS walls, a mineral wool insulation layer
and then external SS cladding. .These vessels while working will be cool to the touch.. 'The
fermentation vessels are individually temperature controlled and also triple walled. The boiler is
equipped with redundant flame failure switches. All fermentation. and beer storage vessels are
egiuppedwith both vacuum and pressure relief valves. Motors and pumps are GFI protected and
enclosed in .waterproof cases..
The attachment to this letter outlines the water. usage for the brewery; the volumes and characteristics
of the waste .and the net usage of water. The PH of discharged water will be between 7.0 & 9.0, and
we have purchased an electronic PH meter to monitor this. We are confident that given the dilution
of wastewater from mixing with spent water from the reverse osmosis equipment the concentrations
of SS.and BOD by weight would be well under 200 ppm.
The solid wastes from the brewing operations are spent grain from the mash tun, spent hops, and
spent yeast. All of hese products, mixed together, become an excellent nutrient to be added to
fodder for dairy cattle, steers,' and-swine. These will be collected in barrels and sold or given to
Texas A&M or local farmers.
Caustic. cleaning solutions are neutralized by dilution, addition of sulfuric acid, or by simply directing
the natural carbon dioxide produced during fermentation into the caustic solution. The PH is
typically reduced to less. than 9.0 before disposal. The solution is saved and reused in reverse order
of cleaning demand - from serving tank to unitank to brewhouse in order to economize.
Heat removed from .the boiled wort to cool it to fermentation. temperature through a heat exchanger
using chilled water is reclaimed as hot water and stored in the hot water tank for the. next batch.
The total water. used per 10-bbl production batch thus becomes 13 bbls for product plus 9.5 bbls
used for cleaning. and rinsing, a ,total of 22.5 bbls, 10 bbls remaining as the finished product, beer.
Brazos Brewing Company intends to be a responsible. and good corportate citizen of this community.
We believe that with goad planning, management, and common sense we will consistantly exceed all
the guidelines for water and wastewater handling.
Should you have any .questions, please contact me .and I will get the answers for you.
S
~ ~/
J r Blackwelder
President
attachments:
R l- a
Monday November 21, 1.994 15:11.: CST
Brazos Brewing. ComRar~aC USE OF WATER & CONTENTS OF WASTEWATER
BREWLENGTH (BATCH SIZE, BBLS) 10 BBL
~ BREWHOUSE PRODUCTION VESSELS 2 EA
REVERSE OSMOSIS STORAGE TANK,. PURE WATER 21 BBL
REVERSE OSMOSIS STORAGE TANK, SPENT WATER 19 BBL
HOT WATER STORAGE TANK 11 BBL
UNITANK FERMENTATORS, 4 EA a~ 1A BBL 40 BBL
VOLUME PER WEEK 24 BBL (744 GL)
VOLUME PER DAY, 7 DAY WEEK 3.4 BBL (106 GL)
SERVING TANKS, 6 EA @ 10 BBL 60 SBL
WATER USEAGE:
IN PRODUCT, 10 BBL PER BATCH
TO ATMOSPHERE .7 BBL PER BATCH
j SPENT REVERSE OSMOSIS - 16 BBL PER BATCH
IN SPENT GRAIN 4:3 BBL PER BATCH.
IN CLEANING ` (2 BBL) 0
I TOTAL WATER USEAGE 10.6 BBL PER DAY (330 GL)
TOTAL WATER TO :SEWER 5.5 BBL PER DAY (170 GL)
';~~ WASTE WATER:
~I
CLEANING EQUIPT 3.3 BBL
N 2.2 BBL
AVAILABLE FOR DILUT O
~~,
~
~
AVERAGE BOD BEFORE DILUTION 292 PPM
'' AVERAGE BOD AFTER DILUTION 180 PPM
TOTAL SUSPENDED SOLIDS 140 PPM
=J.,°J°J-.°f•f•f•f•J+e ~IT1' (}F iWOLLE~E STATION
•J•f •J•f•!•J °f °J•J•l°J °7•f•J •f°J °I- ~
~.. •.='•i'i'i~J'i~i~i'i~i'i~i'i';'s~i'i'i'i~f•f. 1}EVELQPFSEwT SERUI~ES
/°lti,f°/ :: • f•J4: f~.' I`I °/,J~~ I-J•!,I~/~ltJ•I
t.\.,.,.`°.^.t.t.`.'.`.`°t°"`'"`-`""'t"""". 1fOf TEhA~ AVE
,I.i,/.J.f•J•J•J•f•J•J•J•f •f•1 °J•f •f •f •f °J°1 •J •J•/•J•.'
. t,t,•a,•a"t,•a,•a.•\.t.t. t.t. t.•a.t.t.t.t.t.t.a~
';'i'i`i:i•i:i•i.J f f . J.J•f J J J J•J, J J rJ•, . ~4LLEGE ~TATIQN, TEXAS 7784(?
. t•°•. ••;. t•l °t•t•t l t•t t t t t•l•t i t l \•l•t \•
a!'J•+°!-!-f •f•J•J I I J J•J-I ! f 1 J•J°J f f I•!•/ f 1•J
1°t°t-'.•t•t •'a•t•a c t\ •l•t t t t•t•t l t\ t•t•' t•t•t•
•!•J•l•J•J-!•f •f•f •J •f •/•!°J•f 'f•
\•\•\•\•\•\•l•l•l•\•\•\•\•\•\•\•\•\'
~J.f~J.J•J •J•f •f •J•J •J•f •J•f •J•J•J •J•
t.t.,.t.t. \°\•t.t.t.t.t.t.t.t.t•t.t.t.t.
•1•/•J•J•J•/•!•f°J°i •f •f •/•!•J •I •J •J•f•J
'J~f,!•!J•f•J•l•J-J•/•/•J•f •J •!•f •7 •I •f
\.t•t•.•t•t•t•t•.•t•t•t.t•t.t•t.t•t•t•t•
-J•/•/•J•f •f •J •!•/•I •!•J •/•J •J •I •J •1 •J•f
Facsimile Cover Sheet
To: A~ ~~~v~~
Company: ~'~
Phone: ~ ~~
Fax: ~ -~6 _ ~-3
From:
Company:
Phone:
Fax:
Date:
Pages. including his
cover page:
6~~~
~~ _ 3 ~
~ ~ -~~'~
~0 ~z ~
Comments: /v~~D ~X,
L
~o~'f~~
f.J.nY•f.r.f. J.J. J.n!•J•J•!•; •!
•f•J•J•.•J•,•,•f•f•J•J•f•J•f•J.J.J•J•J•J•J c 4 0 9) 7 6 4:- X 5 7 0
.~.~.~.~.\.~.~.\•t.\•t•t.t•t•t•t•t•t•t•t •\•\•
J•J-J•fJ•J•J•!•J J•f•J•f •f •!°J •f •J-J °J•J•J•hi
^JJ•!•f•P!°f J•J•/•JJ•J•.'•!Id•hf°f M•J•J°i•
-`'`'`'"'''•`'`'`•`'`''"`•`'''''`•`'`'`'`'''`"`" 0404] 764-348.6 EAX
.isJ•,•;•J•l.;•f•;•f•J•!d•JJ•f•+•; •I.1 J•J •J•f •!•!J•f
r,f•f•J•!•f•f•i•J•f•f•f•f•J-f°i •J•J •!•J•f •f•!•!°J •J•J•J•J•/•f
\•\•\•\•\•\•\•\•\•\•\•\.\•\•t••..\•\•t•\.\.t•\•\•\•\•\•\•\•\•\•
°f J•J •J•/•J
,J•r~f~~ f~J•J•f
~2-~~
1 ~k
W 1ti~
1
..-r...._. ,
~.
j t.~
i
~..
~:
~:
1 ~
l
~. d
1
~,7/~
- Y`.~..
~1
t
- ~--
;.
i
~~ ~
+,~
~.> ~~
~~~ iia
...
a R A~ 0 5 v~ ~-~, ~~t Ur ~ ~~.„- ti~ 5
tom, ~ , ~~y-~.~.ri
~~ 2- ~~---, ~
00 /GS 7~ r'~° ~~ a~
- 2- i S'.~ ~ 1 ~j ~
- _ ~~~ .fl
~ ~ ~~ ~.
r r
~(f- ~ ~,~ Cop
~ ~~
~~~f ~U~~ ~ ~ _ _
a- ~
_ ~ _ _ _ _. ..v -
~~ 1 ~~
~9 ~'f t
4 ~~. ~ 3 ~
\J
C\/ •.
~ ~ 7~ .
I
~~
.,~ t
~. -
'C~.~~+vL ~ S-rR~cT l
~. k ~, _ f
f ~ ~.
Iii
;~
~~
~~ `~ ~`T1
_...; ,
PRC CHECKLIST
~~~~~~ City of ~o~lege Station
Water/Wastewater Division
%X ~' ~' ~ vvi~-``t-
~Gaea~ ~ hem
r~, v~ re,-~er+~" r S
vo~~~ed -~ ~ ~'s
Cond~f-io,~~l.
PLATS
Provide adequate easements for all lots to have access to public water and sanitary sewer
mains. ~- ric-,~h6~1~7cnd~~ ~Sw-~s w~ l~ (,~ °P u/ ~irv~nscar ham,.. ~cc.---<---4- ~ ~~'r~'(; i-
I'
~ ,. vc i-wG ~ Go-SG ~- ~cGo.--e5 npc`~`i~rp``--~ ~ ~ tF Mc. 1~.~--C- ~41C ~ : 7.
• ~ n.-y~.,~.. w/ whtyt ~~r't" 1 I n~ p~w~<---~~-
ITE .PLANS C 1
rly .between .existing and proposed mains.
~C Existing: Locate existing mains accurately and note their sizes.
x.Proposed: -:Show locations of any. proposed mains... (Their sizes and materials are not
required at the site plan stage). Water mains shall be configured in a looped
system so as to minimize dead ends.
Indicate fire hydrant locations.
~If existing hydrants are sufficient, locate them on the drawing.
~If new hydrants are required, show heir proposed locations. Note that the final site
plan must agree with approved construction documents on the locations of new
hydrants.. (Note: All hydrants must be installed and operable before any
combustible materials are brought on site. Also, any new hydrants must be
covered by easements for maintenance purposes.)
Water demands and Sanitary Sewer loadings. ~' l~~w ~n~4 ~ ~°~"`s~`~'
Calculated water. demands and sewer loadings should be attached to the site plan.
However, if water and/or sewer mains are to be designed for the project, this data may
instead. be attached to he utility layout sheet of the plans.
WATER'DEMANDS. Each meter must have a separate set of demand data, as follows:
~"`~,~~ Maximum Demand (needed for ail projects except single family residential) is the rate which
'~ ~,~ ~~ ,~,,,~~ s results from operating all water facilities simultaneously, in gallons per minute.
~~~~. • Wt ;Minimum Demand (required of commercial,projects) is the rate. which results from operating
'r``b -~~ Q~O~ the single least-consumptive water facility alone, in gallons per minute.
,~ C®,~F~•," ~ Normal Demand (rec~~uired of commercial projects) is the average rate which occurs during
~~ b~- the project s normal hours of operation, in gallons per minute.
~ de x SANITARY SEWER LOADINGS.
~.~ Sewer loadings ar . the average daily rate, in gallons per day, at which sanitary sewer shall
flow from the entire project.
As a recommendation for rr~ai i~te,_nance purposes, please make every effort to keep trees and
shrubs the following minimum distances apart from public water and wastewater mains,
whenever possible: trees ten (10) feet and shrubs five (5) feet.
CONDITIONAL USE PERMITS
.How will the proposed use affect the existing public water and sanitary sewer infrastructure?
All Site Plan criteria.must be met.
rev. 2/94
~: ,
L G 1 ~.
,~eS -~
C~~
w
.~ CITY OF COLLEGE STATi4N ~'opo. ~ !~
II 1NATER AND SEWER ®EPARTMENT
I 1Ai0RK DETAIL SHEET
STREET NAME 't.. CREW LEADER= - 1
SUBDIVISION : ~L.A~ZA , DATE : S ~L.4 ,/ B~j
LOT , BLOCK ~ TYPE OF LINE = WATER ~ SEWER
TExAS .~
.,
'~ ~ _ ~_.
~-~
~epE~S
~+ ¢ST.
~ ~~~.~~ ... ~_
~1 Q ao k.
~
L
~ _ ~
~
ezs
c~9 ,
_
. _
~~
i3'4
e gig ~~
~ b _~~
.
~~ $ 9 ,. ~ .. E • J~.Si'~
P/
_._µ ,.._... r_. _, ~~ _
__ _~~ ~ .
~__~ _.
/ `~ U, ~ ~~ EAV
~
J _~ ,
~ ~
9 ~ ,~ _ :M~. ~~
~s ~ ~
(0
,~ ~ ~_ ~ ,_ ~.. ..._ Q
~ d
~ ,
.
~ ~l.os,h
/
e
,.
J ,
~ _.
E
/ ,~
1 ~4G
~
se ~
~
~. .. w
S ~ ° _
_
g ~, d
~/
~. a-
. --
9 ` ,~
8 s
.._ ,~,. a
.
~
v
. _ _/ . -
NOTES
-I. TIE-DOWN WATER OR SEWER LINES (WHICH INCLUDES FIRE HYDRANTS, VALVES= .METERS, TAPS,
SERVICES, TEES, MANHOLES , CLEANOUTS , ETC.) TO ALL EXISTING PERMANENT STRUCTURES
(BACK OF CURB, PROPERTY ,LINE, SIDEWALK, DRIVE, TREE ,..POWER POLE. , ETC.) ,
2. ALL TIE -DOWNS SHOULD HAVE TWO. OR MORE DIMENSIONS TO PERMANENT STRUCTURES.
3. iF THE LOCATION IS NOT AT AN INTERSECTION, GIVE ADDRESS AND CLOSEST STREET INTERSECTION.
4. TIE -DOWN ANY OTHER UNDEP.GROUND `WATER, SEWER , GAS , ELECTRICAL, & CABLE TELEVISION
LINES IN THE GIVEN AREA.
CERTIFICATE OF OCCUPANCY
CHECKLLST
ELECTRLC: (Ray 3680, Tony 343 on 3502)
ENGINEERING: (Kent 3581, Veronica 3763, Brett 3761)
(David D. 777-3942, Vern W. 777-0292., Jerry J. 777-3557, ohn~t. 759-3970
R
~-~1.~.e-'t
// ~~ -C'~"~--''
~~ ~.X~
FIRE: (Eric 3781, Tim 3712) 4~ _ , ,~ _
~~,~.r, e
LEGAL: (Jan 3546)
~~
~.
3t ~ ~ ~ L
~~
7
i~ tom, t
1 i
P,
. .~
.~~
__^--_
j , ~ i
,°r''
~`t
~, .:.~ _ ~ T..~
~ ~ ~
~' ;~, ,o
~;~
_ _. _.
4
~' ~ _ ~
~~
~ __ _ _ n
/.~
PRIORITY PROPERTY MAINTENANCE
P.4. Bog 9285
Callege Station Tx. 77842.
BILL TO:
Mark Dudley Constuctian
113.70 State Hyw 30
Cal ege Station, TX. 77845
~t1V01CG'
DATE INVOICE
5/5/95 511
P.O. NUMBER TERMS PROJECT
Net. 15th
QUANTITY- DESCRIPTION RATE AMOUNT
Parking Lat Striping 935 ft flinch yellow 90.00 90.00
Eire. Lane Painting 500 ft 140.00 140..00
3 Handicap Emblems 25.00 75.00
Parking Lot Striping unloading zones 35.OD 35.00
2 Handicap Signs. .with poles 50.00 100.00
1 Fire Lane parking sign with pale 45.00 45.00
Brazos Brewing Jab an Dominik 0.00
Sales Tax 8.25% 40.01
Thank you for your business..
525
01
TOTAL
.
.
'A Brewpub witb the finest locally brewed ales & lagers in Texas"
' PO Box 9369 College Station,. TX 77842.9369
tel: 409-693-4148 faxa 409-696-0351
Friday. May 5, 1995 11:56 CDT
City of College Station
1~ n1 Tavuy TCyr!vn~o
College Station, TX 77842
To Whom It May Concern:
i
I, Jere Blackwelder, personally witnessed Dr. Bruce McDonald.
prepare the grounds to be in grass, plant seeds, fertilize on
Sunday andMonday,'Apr1 30th & May 1st. Since then I have seen him
come and water these areas .
The normal time for the emergence of grass should be expected.
Dr. McDonald has. expressed a genuine and strong interest. in the
proper landscaping of .the Brazos Brewing Company and plans to add
u. ~....~ liC~ivi ~..~~.~. uii.... ca.,~..A~ ~i+Jitci i Niuii ~-ers
Both of us pledge our commitment to not just meeting but exceeding
the landscaping requirements of the City.
Si
Je
P r
bbc88e.d1tr
ro
a
ro
..
F'
y • hi 'TJ N G ct r• rn ~ ~ II
~• ~E c~o~'~r-ro~u I
Sv fZ¢ ~'~roNfi(Dro II I
• ~
~ ~ x~ 0 1
~' cry ,~K
~ ~ y
N
~
•
~' t
r
I
I-h I~ ~C ~'
~ ro J I
N
•
I
n
~ I
~ 7dZ ~
~
M
'
~
. r•a svrowsv r•u I
• Oct f•h~ K~N~+I I
• l
rort~ l
~~ ~¢~
rt
• Kr• ~~rorrN~l l I
• ¢fD roN~OI-+ro
fiO
I I I
•
i ~ H r• ~ ~' • r• fA ~ ~' I I I
ro~ f)Ofv ~A~roO I I I
I NO ~'fiC s2(~roO I I I
W ro
¢
Oro N I I
I ~ •
ro
I
~~H
¢
I OI I rocnl
~"O
I ~ O I P sv rn ~- ro ~ rr N ~ I
I x' I I rr r• sr K r- O rr o I
I I I r''f N N ~ • • ~P I
I w ro cry
;
I rr sv ~ I
~
..
I I I o r•W ~ m K N II I
K
`
~
I I I U7 I
~+ fv
~'
~i
N
•N
• I I Orr K
~ ~
• I I N II
~O~~i I
u- •• ~ I
..
Q I
~z~l
Wr•I
M fv ~ I
~ N sy I
~' crn• ~
~p'N I
N~cNt
N N ~
bi O
(KD X ~
~ ~
~ ~
11/13/95 15:48 ^Ly409 764 3496 DEVELOPMENT SVCS I~j001
~~~~~~xc~~~~~~~~~*~xe~~~~~~:~xc
~e~~ ACTIVITY REPORT ~~cx:
~~~~~:~~:~*~e~xe~~~~~:~~xc~~:~e~~~~
TRANSMISSION OK
TX/RX N0. 4002
CONNECTION TEL 9p7762235
CONNECTION ID
START TIME 11/13 15:46
.USAGE TIME O1'21
PAGES 2
RESULT OK
.~-
~a ~;:
~..~
._~..._ .r_.._._ _ -- -__ _._ ~ ___-- _-____-- ---__- - ----- - - - --._. ---
__
~~ CLEARING ACCOUNT
`~ CITY-OF COLLEGE STATION FiRSi aMERICAN`eaN+c NO. 1 q. 8 0 5 5
`/ UNIVERSITY BRANCH
P.O. BOx .9960 P.o. sox 2seo
COLLEGE STATION, TEXAS 77842-0960 COLLEGE STATION, TX 77840. z
74-6000534.
PAY
1~"I~iE i-il.thi~h~l~a AiWir ~~~:~li%s4:i DIw~L.L~I-~t~~~ `''!i%;;!~ii'"
~i .~,.r~s/// r
_ _ ter,.
~ ll~.lu~C•Y Cit. hl~~F'~iU~
hi. I.
...
TO THE ~ ~'~~~~s ~T,tiT•I~ f'i~f~ . =~4:! BY /' - -
ORDER `///~ EXECUTI "_w-~' i~yrrf:; ,
~:I_I L. L: r r )w .'-_` ~ ~t ~ ~ L.l ~~ ~ it f i a-i 4
Of BY
~I' 1480 5 511' ~: 1 L 3 10 2 3 29t: II'00 5 64 1 ail' ~I'00000 500001'
`~~ (°~
~' `~e~..
~0
~.
brand faxtrarismittal memo 7671
Post-It'M ages - ~,
p
#of
X
To A' I I ~~~ ~
/
Fronp. 1 ~L~Y ~L~
~o~r1 ~Jr~LE~ ~o.
Dept. Phone # ~~
,
J ~ ~
~
~
Fax#~~b~o2~~11 ,
/
/
/
/~
Fax# +~fa/ ~Y~X~
~~ e~
TCJs ,bane
Ft~Cll"Ila ~abir~e
.~~_at thc~t.tghrt y~:tpd 1iF°~ tce k:.nc/w the concerns Shirley s, I had
re: this site. First ,W,.~~ `~.:tl 1, the drive-thrlml~_tc~h sis~n
indicates ~~ c7.~,.~rar~ce ckf ':fig . Shirley thir•ak:s Fire will ..have
prclblem w/ this. Th,er a. ~ c,-tn~m~Cay e:.tendinq fr~::lm the
trta~.7.ding tc, thte p'rc/petty , 7.ine. ~~,rt tl°,is sa.deq it i x ri,W,•(:
reflected ~•n tl-ie ~a.te pl.~.an.
~~h',E? ".~.77LCirlrtC.~e, .Y.rl~~:+Ymc~~]1.~~~rl" ~~ill" ~he ~~~rt..?Ved ~a:l.~!»' ~7~.clra f~w~r hie
"I"c~m~:atcF a.~:f a tensive. ~hc~r_tldnp t we review the sipnac~e
~}y'c,~„)c,ed fc~r Twc~ Pesces ~~'~n l.ta ~~Iwrl trierl.t ar7d 1gnc~re what Ws.~~i
~xppr~w~ved in the past''` 7: ¢ m nclt s~_tre the C-(~It"•x district was- in
effect ire' 1'~8~ip whin: t!°,a"~ T'{~matc~ went inn C7ne Crl:~le d~w~es
e:;i~atp hE»a't at :L~'~~~a:: m,~,~rc} l.~.C::e ,:c f1~t~ ~a~::~~.e t~:~ me. The
b~tildinq t•,a~ .,j,_tst, been r~:~~aintedq st~~ ra,~~ ,ether sic-t.r•t were...
vis~i.ble. There ire tw~~.~ rl~,tJs that a .tend at~c=~tt tw,:~ feet c~~_~t
f r~,rn the ' frl~rit ~-If the ~,~~ti ldinc~n
,~CaCaarently 1:hrr_• pl~°tce hr~'~1s hie~*n ~:tdvertisinq a d,~,tahale drive-•
t•;r•,-Erac~h. - :C .j~_a~;t dc~i°ap t se*e hFr~w that is pc~ssib7.e; there ~ rust
er~a~at.tgh r,~~~em. !~'taybe the ids were rrtistak:en. ,fit 'the time the
drive-•thr,~,,aghr w~ a~~r~~~~~dr:- the fc~lll~wa.r•aq c,~~ndit.i.;:~r•a~:s h,ctCi tlw~
~e me•L- e
,- "tti(~~r three traffic sign -.- drive--.t~ window c-1n1y„ tc,
_..~..- Fae placed near drive._tt•rrl~lrtgh.
_. F,M,t.ar speed haetrn~k5 ,w,r~ th,e drive. °~'~iY. `~ ~fi;~
-~ 1trs :~ ~' steel. ~~~~-tte wf ac~e~.~ c~~~nt~''•~.lled inside
r7 ~"_~1t,~4't a~ra ntu 1v lT~ ~-1
~" !^{ .~. ,.~ 7 1 t •~a ~..~ r' n ~..1 r ~ .!. ~ 11.: S~.Y .Y. v..' n o ~+
~i2.- ~~_trta c~tt tl~ hr4:.5 :.,w+.tnq ,=:.~t t~:l encl.sE.trage right. tE_trr~s
and inhibit .l.r.:~ft tt.trns.
"ft•,ey are dc~in~i wiw6rl~: /~r~ 'F•F're dr~.ye-thrc~~_agh. Sh~r~r_tld we c,wlnt~-tct
tt•~eret rr::lw artsl rerriind tP~rcarn Ewlf the re~t.ra.cta.l~n~':~'
.x.:::
:Sabine McCully Re fyi :...---- ----- . -.... :...:...... .. :.
From: Carl Warren
To: Smccully@CITY OF COLLEGE STATION.CITY HALL
Date: 6/3/98 4:39PM
.Subject: Re: fyi
~' Maybe; but along as there is an accessible route connecting existing parking to the new door location he
should be o.k.
»> Sabine McCully 06/03/98 04:18PM »>
bob hederman with Brazos blue ribbon bakery is going to move the bakery into the former brew pub on ,
dominik. he is using the brew area as his bakery kitchen and will delete thepatio serving use; the rest of
the area will be a restaurant. he will be adding awalk-in cooler that will take up two of the parking
spaces and i think as long as he brings that in with his permit application. so we can take a look at it we
do not need to go through any formal site plan review.
'; i do have one question for lance and earl - he is going to move the main entrance to the north-east
corner and close the existing main door. as such, does he have to relocate the handicap parking spaces
to be closer to than main entrance?
he is working towards submitting for his permit on friday.
'~,
~,
I
I
'I
i
..,.:...:.: -:,.k.: -::...:
.....Page-:1 r€
ne McCully Re fyi ~..,------ --~->~----.
From:' Lance Simms
To: Natalie Ruiz, Shirley Volk, Smccully tGDCity of Col..,
Dates 6/4/98 9:11 AM
Subject: Re: fyi
We can make the final call after we look at the site plan butthe code does require the accessible parking
spaces be located on the "shortest accessible route of travel" from adjacent parking to the building
entrance.
»> Sabine McCully 06/03/98 04:18PM »>
bob hederman with Brazos blue ribbon bakery is going to move the bakery into the former brew pub on
dominik. he is using the brew area as his bakery kitchen and will delete the patio serving use; the rest of
the area will be a restaurant. he will be adding awalk-in cooler that will take up two of the parking
spaces and i think as long as he brings that in with his permit application so we can take a look at i# we
do not need to go through any formal site plan review.
i do have one question for lance and earl - he is going to move the main entrance to the north-east
corner and close the existing main door. as such, does he have to relocate the handicap parking spaces
to be closer to that main entrance?
he is working towards submitting for his permit on friday.