Loading...
HomeMy WebLinkAboutMiscellaneous1. `/c ~~I CITY OF COLLEGE STATIOI`I ~'~ ENGINEERING DIVISION Post Office Box 9960 1101 Texas Avenue College Station, Texas 77842-0960 (409) 764-3570 Project Memorandum Date: November 28, 1.994 By: Brett McCully Re: Payless. Cashways (Furrows) Expansion Fooodway Determination. h 5,r~ ~/Qy ~~~~~~ On this. date, Kent Laza .and myself met with North Barden and Alan Gibbs of MDG to discuss the problems of determining an accurate floodway within the floodplain of Carter's Creek at this location. We reached the .agreement that due to the magnitude of the flooding of Carter's Creek over Highway 30. {Harvey Road) and the inadequacy of the existing drainage improvements under both Harvey Road and the .Access Alley to Sam's, that determining an accurate floodway for the Carters Grove .tributary within' the Carter's Creek Fooodplain was impractical, if not impossible. Therefore the requirement to show the floodway on this project has been waived. We verified that the potential .increase in storm runoff. generated by the site improvements would be controlled by the onsite detention facility to predevelopment levels or less, so no increase in flooding downstream wih occur. The fill for the parking area north of the channel will be allowed without a variance procedure because of the impossibility of determining the actual location of the floodplain. The channel itself will be improved to handle the runoff velocities at the bend in the creek.