Loading...
HomeMy WebLinkAboutMinutes PROJECT REVIEW COMMITTEE REPORT July 20, 1994 TO: George McLean, Director of Operations 2000 Welsh Avenue, College. Station, TX 77840 Harry W. Bostic 4500 Carter Creek Parkway, Bryan, TX 77802 FROM:. Project Review.Committe Jane Kee, City Plan Brett McCully,. Project ineer Mike Lane, P&Z Representative Others Attending Natalie Thomas, Planning Technician Shirley Volk, Development Coordinator Samantha Smith, Engineering Assistant Don Lusk, Electrical Line Coordinator Tim DeDear, Fire Protection Specialist SUBJECT: Parking Lot Plan. - A ce: M Consolidated High School; .proposed addition of portable buildings to be located along the F.M. 2818 frontage road near the teacher's parking lot. (94-413) A Project Review Committee Meeting was. held Wednesday, .July 20, .1994 to discuss the above mentioned parking lot plan. The Committee recommended approval of the final. plat as submitted with the following conditions: CONDITIONS OF APPROVAL: Discretionary .Items: The. proposed portable buildings should be painted so that they blend with the existing site and are aesthetically. pleasing from F.M. 2818. The Committee suggested that the proposed landscape timbers be removed and the proposed shrubs spread .out along the frontage for more effective screening of the addition. Ordinance Requirements: _ Relocate the proposed fire hydrant to align with the center parking. aisle so that it is not potentially blocked. by occupied parking spaces. ,Construction documents prepared by a registered ..professional engineer must be reviewed 'and approved by staff prior to installation of the proposed fire ,hydrant. The fire hydrant must be installed and operable prior to moving the temporary buildings. on site. r w PRC Report A&M Consolidated Case #94-413. Page Z of Z CONDITIONS OF APPROVAL. (cons): Comments/Concerns: _ This item. will not require a formal conditional use ..permit request due to the proposed use of the buildings and. the size of the expansion compared to the overall site. _ A representative of CSISD should meet with Electrica Operations Coordinator Tony Michalsky at (409) 764-3660 to determine electrical service needs. COORDINATE. FUTURE CONSTRUCTION PLAN SUBMITTAL WITH DEVELOPMENT COORDINATOR SHIRLEY YOLK AT (409) 764-3570.