HomeMy WebLinkAboutMinutesPROJECT REVIEW CONIlVIITTEE REPORT
June 8, 1994
TO: Tommy D. Seargeant, President, Texas Aggie Credit Union
301 Dorninik Drive, College Station, TX 77842-0091
Jack W. Cumpton, Jack W; Cumpton & Associates
4103 South Texas Avenue, Ste 202, Bryan, TX 77802-4040
FROM: Project Review. Committee
Sabine Kuenzel, Staff Planner
Veronica Morgan, Assistant City Engineer
Mike Lane, P&Z Representative
.Others Attending
Winnie Garner, PBcZ Representative
Larry Lightfoot, P&Z Representative
Natalie Thomas, Planning Technician
Shirley Volk, Development Coordinator
Pete Vanacek, Parks Senior Planner
Tony Michalsky, Electrical Operations Coordinator
Tim DeDear, Fire Protection Specialist
David Moore, Building Official
Ray Crow, Assistant County Engineer
Mike Lavender, TCA Cable Representative
George McLean, CSISD Representative
SUBJECT:. Parking Lot Plan -Texas Aggie Credit Union;. proposed banking facility to be located at 501
University Drive, lot 1, block S of the Tauber Addition in the Northgate zoning district. (94-
411)
A Project Review Committee Meeting was held Wednesday, June 8, 1994 to discuss the above mentioned
parking lot plan. Assistant City Engineer Morgan moved to approve the site plan as submitted with the
following conditions:
CONDITIONS OF APPROVAL:
Coordinate the dumpster capacity with Sanitation Superintendent Jim Smith at (409) 764-3690.
Show proposed screening details for the dumpster location.
Parking spaces are allowed along the rear of the building as shown, as long as they do not extend
beyond the building line.
Bike racks should be installed as long as there is adequate maneuvering room for handicap
facilities in the same general area.
Verify that the sanitary sewer locations shown are correct.
a
PRC Report
Texas Aggie Credit Union
Case #94-411
Page 2 of 2
CONDITIONS OF APPROVAL (CONT.L
_ Show all .existing easements for water and sanitary sewer lines. Additional easements may be
required to cover the. existing lines.
Note the ownership of the existing asphalt pavement.
Submit a landscape plan to comply with the Northgate criteria to be approved .prior to issuance
of a building permit.
P&Z Representative Lane seconded 'the motion which passed unopposed (3 - 0). The following
comments were made by the various reviewing agents:
STAFF COMMENTS:
_ Submit paving, curbing, ramp and sidewalk details with the construction documents.
_ There is no problem with the proposed sidewalk extension to the curb line to be even with the
sidewalk in front of the bike shop. The construction documents will be sent to the Texas
Department of Transportation for final approval.. Coordinate the relocation of the existing "no
parking" signs prior to the construction with Assistant City Engineer Veronica Morgan at (409)
764-3570.
_ Coordinate telephone service details with G.T.E. Representative Laverne Akin at (409) 821-4723.
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE
AND LANDSCAPE PLAN ATTACHED AND 4 ADDITIONAL COPIES OF THE REVISED SITE
AND LANDSCAPE PLAN ONLY TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT
PROCESS.
PRE-PRC REPORT
Franklin Estates
DISCRETIONARY ITEMS
Change the word.°tract" to "lot"
ORDINANCE REQUIREMENTS
- Verify County Commissioners' Court approval; also verify that: the 10' :additional ROW to be
dedicated is enough.... •. .
OTHER COMMENTS
Earl .finish the application
Texas Aggie Credit Union
DISCRETIONARY ITEMS
- If there. are any changes in electrical service, they will be required to be underground
The dumpster must be screened from Tauber - (';~Z~(. L~ C~;,-~- Cs~v~
The PRC has the discrete o approve the co ation~f the two parking spaces in the rear
ant Qw-,.,.,~,~.,,,.~ v ~,~Q~ . C.~,.e".~ '
The PRa~Ch~af thcreti~~ o require bik~ ks (~a-~a t=~-~.-~~-t~~ ~ ~" p`~
~ L/ ORDINANCE REQUIIZEMENT
(/V~i6w correct sewer locations
// Show. all existing easements for water and sewer lines; if there are none already covering the
lines, there will'be additional easements needed
Show ownership of the .existing asphalt pavement J ~~
~,,lNorthgate landscaping requirements need to be met ~/`~ ,
OTHER COIVIlVIENTS
- Need paving, curbing, sidewalk. details somewhere in the building permit'.. application
- Staff has talked with TXDOT and there is no problem with the sidewalk extending to the curb
line to be even with the sidewalk in front of the. bike shop: The plans will be sent to TXDOT for
final approval..