PROJECT REVIEW COIVIIVIITTEE REPORT
April 14, 1994
TO: Earl Havel, Garrett Engineering
4444 Carter Creek,. Bryan, TX 77802
Simon Kahan
219 Manuel Drive, College Station, TX 77840
FROM: Project Review Committee
Sabine Kuenzel, .Staff Planner
David Pullen, City Engineer
Others Attending
Susan Macdonald, Building Technician
Shirley Volk, Development Coordinator
Tony Michalsky, Electrical Operations Coordinator
Robert Gadbois, Engineering Services Manager
Tim DeDear, Fire. Protection. Specialist
Brett McCully, .Project. Engineer
Pete Vanacek, .Parks. Senior Planner
Mark Smith, Director. of Public Services
Laverne Akin, GTE Representative
Daron Walding, TCA Cable Representative
SUBJECT: Parking Lot Plan -Mini Storage Complex; proposed facility to be located on Manuel Drive at
Cornell, lot 5 blockl of the K.F.O. Addition. (94-406)
A Project Review Committee meeting was held Wednesday, April 13, 1994 to discuss the above
mentioned parking lot plan. City .Engineer. David Pullen moved. to approve the site plan with the
comments as outlined in .this report. Staff .Planner Kuenzel seconded .the. motion which passed
unopposed (2 - 0). The following comments were made by the various reviewing agents:
COMMENTS/CONCERNS:
ENGINEERING:
_ The radii of the driveways must meet the minimum requirements or seek a variance.
_ Show cross street and adjacent driveways. Driveways must comply with driveway ordinance or
seek a variance.
_ briveway width on Cornell must be widened or seek a variance.
° Mini Storage Complex
° Case #94-406
Page 2 of 3
_ A variance .request must be submitted to address the driveway throat length, driveway radii, and
driveway width. Show the opposite and adjacent drive openings on the site plan prior to
.consideration of the variance request by the Planning and Zoning Commission. Submit the
variance request and revised site plan by noon on Friday, May 13, 1994 to be considered by the
Planning and Zoning Commission on May 19, 1994.
PLANNING:
_ If there is an office, then bathroom facilities are required according to the Standard Building
Code. Also, parking requirements would be applicable. If no office is planned, then make a
note that all 13,200 square feet are to be used for storage only.
FIRE:
_ Afire hydrant must be installed to provide fire protection. It can be on the existing line on the
North side of Manuel as shown on the site plan.
ELECTRICAL:
_ It is the developer's responsibility for. the. placement of all conduit and for payment of twenty
percent of the cost for electrical service. Submit a letter requesting electrical service and
agreeing to pay the associated costs.
Submit electrical loading demands, size of service, and load calculations.
_ Determine if service meter is to be located on a pole or a transformer.
G.T.E.:
_ Telephone service lines will be placed in the same trench as electrical lines. as much as possible.
Place conduit .from the building to stub .out:. 2' from the transformer. Coordinate telephone
service with G.T.E. Representative Laverne Akin at (409) 821-4723.
T.C.A:
_ Coordinate cable service with T.C.A. Representative Mike Lavender at (409) 846-2044.
WATER/WASTE WATER:
_ Install waterline for property. If boring under Manuel, then a profile of the waterline needs to
be submitted.
PARKS:
_ Hose bibs need to be installed every 150 feet to maintain landscaping or install a sprinkler
system.
SANITATION:
_ A -400 gallon side loading dumpster :needs to be located behind the building on the Manuel.
Show the location and how the dumpster will be screened.
SUBMIT 4 COMPLETE SETS OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE
AND LANDSCAPE PLAN ATTACHED AND 4 ADDITIONAL REVISED. SITE PLANS ONLY TO
CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS.
Mini Storage Complex
Case #94-406
Page 3 of 3
APPEAL PROCESS: An applicant may appeal the decision of the Project Review Committee to the
Planning and Zoning Commission withim five days after the PRC Committee meeting. Failure to appeal
the PRC action shall constitute a contractual acceptance of all conditions imposed, and a waiver and
surrender of all complaints, defects, or potential. invalidity, whether under state or federal law. An
applicant appealing the decision of the PRC shall file ten copies of the final site plan as approved by the
PRC, showing .all changes and requirements imposed by the PRC, and accompanied by a written
explanation of those items being appealed. Until said. copies are on file, no further development
approval shall occur, and no further action by the .Commission shall take place. An applicant may appeal
only certain aspects of site plan review, and in the absence of discretionary review by the Commission, or
review pursuant to a petition, all other aspects of the site plan shall be final. Any notice of appeal shall
state with particularity the aspects .which are to be appealed. Coordinate appeal process through
Development Coordinator Shirley Volk at (409) 764-3741.