Loading...
HomeMy WebLinkAboutMinutes WOLF PEN CREEK DESIGN REVIEW BOARD City Hall Council Room September 15,1993 10:00 a.m. DRBMembersKay Henryson, Jim Gardner, David Brochu, Bill Trainor, P&Z Representative Charles. Smith, City Planner · Jane Kee and City Engineer David Pullen. STAFF PRESENT: Planning Technician Natalie Thomas, Development Coordinator Shirley VolkandStaff Planner Sabine Kuenzel. Meetinc Topic: Paul Clarke of Clarke & Wyndham Investments requested a meeting to discuss the previous Sneakers site at 500 Harvey Road and the possibility of. installing a temporary parking lot on the adjacent tract to the east of this site to meet the overall parking requirements for the site. City . Engineer ..Pullellexplainedthat staff is currently workin~onahond package. for the consideration of City. Council. In thatpackage,.additionalfundiQ~fortheCorridormay be a consideration. . There is also .some. hesitation.oQ the City's part..to accept. the responsibility of additional liability. . . In thefllture,staff will be working. with consultants to review development policies including the Wolf Pen Creek Corridor. Mr. Clarke stated that in order to operate the previolls Sneakers site, additional parking.. must be installed. . He requested that a temporary parking lot be allowed with variances granted to the Streetscape requirements,iflydicationo;fproperty, laQdscaping,platting,etc. .. until after the Meier study is completed in order to . allowaten~nttooperate the buildjng now. The .Meier study. will not. be completed for.. approximately one year. The Board agreed ataminiInum curbing should be installed to keep the temporary surface in place and . asa . traffic. control device... · Since the top · layer of soil will. have to be .. removed. to. install the parking surface, the additional soil c01,lldbestored as berms along Highway 30to help screen the parking area. The parking lot could possibly be oriented another way tofitinbetter with the overall parking sCheme.. .IIllProvements sh9~lddefinitely be made along Highway 30 with a main interest of the Board being the long term; iI~1p~ct of the parking 10t..AIlyimprovements in this area could seta standard and possiblydim~trlshpublic perception of the Wolf Pen Creek Corridor with respect to a new bond election... Thed130ardsuggested that t~eapplicant submit a proposed site plan and a written documentexpl~iningthe exact. request ~uch ~s possible variances, development agreements, etc. Mr. Garpll~rstlggested that the. City possibly look into re- establishing a task force to... look at thebigget picture of. the Corridor. Design Review Board Notes 9115193 Page2()f2