Loading...
HomeMy WebLinkAboutMinutesPROJECT REVIEW COMIVIIT'TEE REPORT December 20, 1993 TO: Stanley Bair,: R. S. Bair Associates 133139 Westview Drive, Houston, TX 77055 Clyde D. Wehunt, Brazos Valley Schools Credit Union P. O: Box G76, Katy, TX 77492 FROM: Project Review .Committee Jim Callaway, Asst Direct f Economic & Development Services David Pullen, City Engin Others Attending Natalie Thomas, Planning Techm Tony Mchalslry, Electrical COperatio s Coordinator Samantha Smith,. Engineering Assistant Pete Vanacel~; Parks Senior Planner George Spain, Fire Marshal Mlee Lavender, TCA Cable ,Representative. Don Fazzino, Lone Star Gas Representative George McLean, CSISD Representative SUBJECT: Parking Lot Plan -Brazos Valley Schools Credit Union; proposed credit union to be located on Longmire Drive at Airline Drive, lot 4R-B, block 14C of Southwood Valley Section 19: (94-4D0) A Presubmssion .Conference was held Wednesday, December 15, 1993 to discuss the above mentioned parking lot plan. Assistant Director of Economic and Development Services Jim Callaway moved to reeommeiZd approval of the proposed site plan with the following conditions: CONDITIONS OF APPROVAL: _ Afire hydrant must be added to meet current ordinance requirements. Afire hydrant must be located at least 300' from .the furthest point of the building as the truck travels. _ The entrance. side of the access drive along Airline must be a minimum of 20' in width in order to meef fire lane requirements. _ After a transformer location. is determined, .provide a letter requesting the relocation of the existing overhead. electrical pole and agreeing to pay the associated costs. Show the actual location of the existing. water line located along Longmire Drive. Work with staff to determine the dl~mpster location including adequate screening. _ As a part of the construction documents, provide. paving, sidewalk and curbing details that meet ADA requirements where necessary. P&Z Representative Charles Smith seconded the motion to approve the site plan with the .two conditions listed above which passed unopposed (3 - 0). The following comments were made by the various reviewing agents: COMMENTS/CONCERNS: _ Gas service is available, tc~ the site along the southwest side of Longmire Drive. Coordinate the future service and field location of that line with Lone Star Gas Representative Don Fazzino at (409) 776-0744 _ The fire .hydrant and fire lanes must be installed and operable prior to issuance of a building permit. _ Submit a letter requesting. the relocation of an existing utility pole agreeing to pay the costs associated with the relocation. _ Electrical service :will be provided underground. It is the developer's responsibility to provide two 4'' conduits. It is also the: developer's responsibility for service tram .the transformer to the building. ', _ The electrical meter will be placed on the transformer. Submit electrical load data anda request for :electrical service. Staff would prefer to work with a temporary blanket utility easement followed by an easement dedication plat once the site is complete. _ Provide one 2" conduit to follow the underground electrical lines to allow for future cable service. Coordinate details with TCA Cable Representative Mike Lavender at (409) 846-2044. _ Impact statement #3 should comz~er~t on telephone service. Provide two 3" conduits 'with a pull string from Longiriire right-of--way to building termination (the nearest .point from Longmire). Termination will be on the outside. .Coordinate details with. G.T.E. Representative Laverne Akin at (409) 821-4723. _ Note minimum caliper size on canopy trees. The proposed. crepe myrtles should be noted as fifteen gallon minimum. Note on the landscape plan that construction debris will be removed from the proposed parking islands prior to filling and planting. _ Distinguish between proposed and existing and private and public water and sanitary sewer lines. _ Submit sanitaty sewer loadings and water demands. _ Submit construction .documents for the .proposed fire hydrant .and refer to City details and standards on plans. _ Provide curbing, sidewalk and paving details. The proposed sidewalk along- Longmire musfi meet ordinance requirements' and `ADA cross -slope requirements where it crosses the driveway. .The existing: sidewalk along .Airline must also meet ADA cross slope requirements where the :.proposed driveway: will cross it. A drainage development permitand the. $1`00 application fee is required prior to any cite work. SUBMIT 3 COPIES OF CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED TO CONTINUE: WITH PHASE TV~O OF THE BUILDING PERMIT PROCESS.: i I i i I I i I