Loading...
HomeMy WebLinkAboutStaff Report,.. STAFF REPORT Case No: 94-314 Request: Consideration of a Master Preliminary Plat of Shenandoah Phases Two -Five Applicant: McClure Engineering, Inc. for Owner,. Edward Froehling PHYSICAL FEATURES Location: On Barron Road :1000 feet southeast of SH 6 and north of the existing Shenandoah Subdivision Area: 46.57 acres No. Lots: 163 single family and two storm water detention areas ZONING AND. LAND USE Subject Tract: R-1 Single Family North: R-1 Developing Springbrook Subdivision East: R-1 Existing'Shenandoah South: R-1 Vacant West: Outside City limits Proposed User Single Family residential COMPREHENSIVE PLAN Land Use Plan: Reflected as low density residential Thoroughfare Plan: .Decatur is reflected as a minor arterial and is the extension of Longmire to the south beyond. Barron Road Development Policies No conflicts Parkland Dedication: Will be by fee at the time of final platting based on $225.00 per lot. ,With 163 lots this would amount to $38,305.00. ENGINEERING Water: Water is provided to the area hrough an l8°. ne-along Barron Road and a 12" line along S.H. 6. Sewer: Sewer is provided through a 15" sewer. line along. Barron Road. This sewer should be extended to serve this property. per the City's Master Plan for sanitary sewer facilities. Streets: Access will be provided ahrough an extension of Decatur to Barron Road and Southern Plantation Drive to S.H. 6. Drainage: Drainage will be overland. The site drains into two major tributaries of Carter's Creek. The northern portion of the site drains into the Barron Rd. right-of- way and into the South Fork of Lick. Creek. The southern portion of the site drains ..across the existing Shenandoah Subdivision and is conveyed to Spring Creek. Flood Plain: No floodplain located on the property. Oversize Request: Will be request for oversize on width and thickness of Decatur and the 12" waterline along Decatur. Proposed. Public Improvements: Streets, sidewalks, water lines, sanitary sewer lines and storm .sewer lines. Easement Dedications:. As shown on theplat. Sidewalks: Are proposed in accordance. with the Subdivision Regs. (Both sides of Decatur and one side of residential streets except those that cul-de-sac. q,. ,~ IMPACT STUDIES Water: Impact studies show that water is adequate to serve the proposed subdivision. Extensions will be made internal to the system and ties to the major waterlines in the area are required per the impact study. .Sewer: Sewer is available. Extensions will be made in accordance with. the City master plan. Impact study shows inadequate capacity at the lift station. Improvements will need to be made tothelift station to handle the excess flows. Traffic: The master plan shows an efficient residential and collector street layout and there should. be no negative impacts from the. development as .proposed according to Impact Studies. Decatur is designed as a collector as shown on the thoroughfare plan. Drainage: Drainage will be handled through .the existing. storm drainage system in Shenandoah and through improvements in the new phases. Detention will be apart of the new subdivision to be owned. and maintained by the homeowners. Downstream improvements may be required on the secondary system due to concentration of flows. STAFF COMMENTS /RECOMMENDATIONS This plat was reviewed by staff at a presubmission conference on 8-17-94 where approval of the master preliminary as submitted was recommended. Prior to approval of final plats, the sewer service issue'will need to be resolved.