Loading...
HomeMy WebLinkAboutMinutesAGENDA ITEM NO. 6 Consideration of the finale. plat of the Pontalba Subdivision. (94 213) Project Engineer .McCully presented the staff report. and recommended approval of the final plat with the: conditions. and revisions noted in the Presubmission ,Conference Report. Commissioner Lane moved to recommend approval of :thee. final ..plat of the Pontalba Subdivision with the staff recommendations. Commissioner Smith seconded the motion which passed unopposed (5 - 0). AGENDA ITEM: NO. 7: Consideration of the final plat of the Lakeview .Acres Revised .Subdivision. (94215) Assistant-:City Engineer Morgan. presented the staff report and recommended approval with the Presubmission Conference comments. The final plat is subdividing lot 16 into. 3 multi- family lots. These subdivisions.. have already occurred. by metes and bounds and this replat is correcting. this situation, thus ,bringing the. subdivision into compliance with the City's Subdivision. Regulations.. Commissioner Herring moved to recommend.. approval of the final plat: of the Lakeview Acres'Revised plat of lot 16 with the staff recommendations. Commissioner Hall seconded the motion.: which passed unopposed (5 - 0). AGENDA ITEM NO. 8: Consideration of the final E,T.J. plat of the Estates at River Run. (9421' Assistant City Engineef Morgan presented the staffreport and recommended approval. with the comments outlined in the .Presubmission Conference Report. A master preliminary plat for this ..subdivision was previously approved by the City Council, The County Commissioner's Court approved the final plat on May 16, 1994. :Engineer Larry Wells of the .:Municipal Development Group approached the Commission and offered to answer any questions pertaining to the subject final plat. Commissioner. Smith moved to recommend approval of the` final plat of the. Estates at River Rune' E.T.J. subdivision with staff recommendations. Commissioner Hall seconded the motion which .passed unopposed (5 - 0). AGENDA ITEM NO. 9• nsideration of the preliminary .plat. of the Pebble Creek Phase Five' Subdivision. (94=30$ City Planner Kee :presented .the staff report and recommended approval with the conditions that'the rezonings occur before filing the final plat for record and the comments outlined in the Presubmission Conference report. Staff would also like direction from the City Council relative to the question of pedestrian access thraugk the proposed cul-de-sacs to the public. park and school site. Commissioner Lane moved to ..recommend. approval' of .the. preliminary plat of Pebble Creek .Phase 5 with the' staff recommendations. Commissioner Herring seconded .the motion which passed unopposed (5 - 0). P & Z; Minutes May 19, 1994 Page S of 7 ~f~ ~~~ :; rte K X9.1 . PRESUBMISSION CONFERENCE REPORT May 3, 1994 TO: Davis Young, Pebble Creek Development Co. 4500 Pebble Creek Pkwy, College Station, TX 77845 A.P. Boyd, Pebble Creek Development Co. 4500 Pebble .Creek Pkwy, College Station, TX 77845 David Mayo, Joe Orr, Inc. 2167 Post Oak Circle, College Station, TX 77840 FROM: Project Review Committee Shirley Volk, Development Coordinator. /j~-~ David Pullen, City Engineer Others. Attending Natalie Thomas, Planning Technician Pete Vanacek, .Parks Senior Planner Tony Michalsky, Electrical Operations Coordinator Samantha Smith, Engineering Assistant Tim DeDear, Fire Protection Specialist Laverne Akin, GTE Representative George McLean, CSISD Representative SUBJECT: Preliminary Plat -Pebble Creek Phase S; approximately 58.35 acres divided into 92 single family lots .located approximately 2000' .east of the intersection of Texas Avenue and Greens Prairie Road. (94-309) A Presubmission Conference Meeting was held Wednesday, April 27, 1994 to discuss the above mentioned preliminary plat. The following comments were made by the various reviewing agents: PARKS: _ Explore the possibility of providing pedestrian access through the two cul-de-sacs of Putter and Driver. Courts to the proposed park site. FIRE: _~ Relocate. the fire. hydrant located along Putter Court to be between lots 13 and 14 or provide an' additional fire hydrant on lot 17. G.T.E.: Coordinate timing of future phases with G.T.E. Representative Laverne Akin at (409) 821-4723. d PRC Report Pebble Creek S Case #94-309 Page 2 of 2 PLANNING: Submit a rezoning request on the subject property prior to the final plat. ENGINEERING: _ Expressed concern with the large number of cul-de-sacs in the subdivision and the cost of providing public services to each lot. '~ There are new TNRCC requirements for the sanitary sewer system that may effect .the future development. of this phase of Pebble Creek. Once these requirements are put into place, the review time of construction documents may be delayed. Coordinate details with City Engineer David Pullen at (409) 764- 3570. (~ ~~ ~~~~ ~ SUBMIT 1 ORIGINAL AND 10 COPIES OF THE REVISED PRELIMINARY PLAT BY FRIDAY, MAY 13, 1994 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, MAY 19, 1994. THE CITY COUNCIL WILL CONSIDER THE PRELIMINARY PLAT ON THURSDAY, JUNE 9, 1994.. BOTH MEETINGS WILL BE HELD IN THE CITY HALL COUNCIL ROOM, 1101 TEXAS AVENUE AT 7:00 P.M.