HomeMy WebLinkAboutMinutesAGENDA ITEM NO. 3 & 4:Public hearing to .consider a rewning request of 4.02: acres located
.along the. south side of `Southwest Parkway .approximately 400' west of the Welsh Avenue
intersection. from Gl General: Commercial to R-4 ' Law Density Apartments. (94-101)
.Consideration of a preliminary plat for the Pontalba Apartments Phase. One. (94-302)
~.:
Staff ,Planner Kuenzel presented the staff reports for the..proposed rezoning and preliminary plat of
the Pontalba Apartments. This request would result in the continuation of the apartment. pattern
that: exists in this area. 'The low density residential Land Use Plan designation that exists on the
back portion of the property is not likely to occur-considering the configuration of property in the
area and the fact `that there is a common .property. line .between this area and the A&M
Consolidated bus parking lot. Due to the fact that the rezoning. is in compliance with the .Land Use
..Plan and is not in conflict with surrounding eland uses, staff recommended., approval of the rezoning
request and `the preliminary plat with "the provision of access easements allowing lots one and two
.access to the public right=of-way.
Chairman. Hawthorne opened the public hearing.
Engineer Larry Wells of the Municipal Development Group. approached the Commission and
offered. to answer any questions concerning the proposed rezoning and preliminary plat.
Chairman Hawthorne closed the public. hearing.
Commissioner .Mariott moved to recommend approval of-the. rezoning of 4.02 acres located- along
the south side of Southwest Parkway approximately .400' west of the Welsh_Avenue intersection from
G1 Generale Commercial to R-5 Low Density Apartments. Commissioner Lane seconded the
motion which. passed unopposed (6 - 0):
Commissioner Mariott moved to recommend approval of 'the preliminary plat for the Pontalba
Apartments.. Phase One with staff recommendations. :Commissioner Lane seconded he motion
z which passed, unopposed (6 - 0).
AGENDA ITEM NO. 5: Consideration of a preliminary plat for the Southwood Forest Phase Five
Subdivision. (94-303)
City Planner Kee presented the staff report and recommended approval of the preliminary plat as
..submitted.
Commissioner. Gribou moved to 'recommend approval. of the preliminary plat for the Southwood
Forest Phase. Five Subdivision, Commissioner Mariott seconded the motion which. passed
unopposed (6 - 0).
AGENDA ITEM NO. 6: Other business.
There was no other business.
AGENDA ITEM NO. 7: Adjourn.
Commissioner Mariott moved to adjourn. the meeting of the Planning and Zoning Commission.
Commissioner Lane seconded the motion which passed unopposed (6 - 0).
APPROVED:
Chairperson, .Kyle .Hawthorne
ATTEST:
Planning Technician,. Natalie Thomas
P & Z Minutes February 17, 1994
Page 2
AGENDA ITEM COVER SHEET
REGULAR ITEM
ONSENT ITEM
STATUTORY ITEM
..ITEM .SUBMITTED BY Sabine Kuenzel,-Staff Planner
FOR COUNCIL MEETING OF: 3- .0-94
.DIRECTOR APPROVAL
EXECUTIVE TEAM MEMBER
ITEM: Consideration of a preliminary plat{Pontalba Apartments) of 4.02 acres along the south
side of Southwest Parkway approximately 400' west of the Welsh Avenue intersection for three.
multi-family lots to .contain several fourplex buildings on each lot. Application is in the name of
Larry Landry. (94-302)
ITEM SUMMARY: The applicant wishes to prepare the subject property farar development as
an apartment complex consisting. of 15, fourplexes. Lot 3 is the` only lot with direct access to a
public right-of way. Lots 1 and 2 would be nand-locked without private access easements. A
rezoning from C-1 to R-4 is pending and has,been scheduled for .the: Council meeting of March
10, 1994:
FINANCIAL SUMMARY: Fiscal Impact Analysis shows a negative net revenue of $7,234
under the proposed development and a positive net gain of $25,.695 at average C-1 type uses.
STAFF RECOMMENDATIONS: Staff and the Planning and Zoning Commission
recommend approvat with the condition that. Lots. 1 and 2 be provided with private access
easements.
CITY ATTORNEY RECOMMENDATIONS: No concerns expressed
COUNCIL ACTION DESIRED: Approval or denial of request.
SUPPORTING MATERIALS:.
1. Area map
2. Staff report
3. Presubmisson report
4. Application
5. Copy of Preliminary Plat
PRESUBMISSION CONFERENCE REPORT
February 3, 1994
TO: Larry Wells, Municipal Development Group
203 Holleman .Drive East, College Station, TX 77840
Larry Landry
3609 East 29th, Bryan, TX 77841
FROM: Project Review Committer
Jane Kee, City Plann
David .Pullen, City Eng ee
Others Attending
Natalie Thomas, Planning Technician
Samantha Smith, Engineering Assistant
Tony Michalsky, Electrical Operations Coordinator
George Spain, Fire Marshal
Tim DeDear, Fire Protection Specialist
Pete Vanecek, Senior Parks Planner
Sabine Kuenzel, Staff Planner
Shirley .Volk, Development Coordinator
Laverne .Akin,. G.T.E. Representative
Mike Lavender, TCA Representative
SUBJECT: Preliminary Plat - Pontalba Apartments Phase One; approximately 4.02
acres consisting of three R-4 low density apartment lots generally located
on the south side of Southwest Parkway approximately 400' west of the
intersection of Welsh and Southwest Parkway. (94-302)
A Presubmission Conference was held Wednesday, February 2, 1994 to discuss the
above mentioned preliminary plat. The following comments were made by the various
reviewing agents:
PLANNING:
Correct the total acreage figure in the title block.
Add the statement, "Not for Record" in the title block.
Provide a cross access. easement between all three lots.
..
ENGINEERING:
_ ` A drainage conference is required prior to further processing. Submit a
comparison. of the 19$3 floodplain study of the subject property and compare it
with the new study. There is not statement in the impact study concerning the
controlling of run-off.
The storm water flow up or downstream of this facility for 1/4 mile must be
shown.
WATER/WASTE WATER:
_ Water service must be .provided to lots one and two via a loop system.
_ .Concerned that the existing 8" sanitary sewer line may not be adequate to serve
the proposed development.
PUBLIC SERVICES:
_ If the proposed 20' drainage .easement contains any proposed improvements, then
the improvements should be shown on the preliminary plat. If the easement does
not contain improvements, there should not be an easement dedicating the
unimproved ditch to the City for maintenance.
ELECTRICAL:
Provide a 20' public utility easement along the southernmost property line, to run
parallel with the Christine Lane gravel road.
_ Show off-site easements including the public utility easement located east of the
subject property.
G.T.E.:
Coordinate easement location and service. details .with G.T.E. Representative
Laverne Akin at (409) 821-4723.
II
~~! SUBMIT 1 MYLAR REPRODUCIBLE AND 10 COPIES OF THE REVISED
i~ PRELIMINARY PLAT BY FRIDAY, FEBRUARY 11, 1994 TO BE INCLUDED IN
THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING
'ail OF THURSDAY, FEBRUARY 17, 1994. THE CITY COUNCIL WILL CONSIDER
~ THE PRELIMINARY PLAT ON THURSDAY,. MARCH 10, 1994.. BOTH
~~ MEETINGS WILL BE HELD THE CITY HALL COUNCIL ROOM, 1101 TEXAS
AVENUE AT 7:00 P.M.