February. 4, 1994.
Mr. Ray H ens ~ ` J,,9
Electric smission &
Distrib on Superintendent
+. City College. Station ., Q
P. Box 99b0 t~`'~
liege Station, Texas 77$42
RE: Pebble Creek Phase 4 Subdivision
Electric Distribution/Service Lavout and Cost Estimate
Dear Ray:
In accordance with your request, we have prepared and. are enclosing herewith for your
review and use five (5) copies of an Electric Distribution/Service Layout. and Cost Estimate for
the proposed Pebble Creek Phase 4 Subdivision Development. A diskette is also enclosed to
illustrate the proposed electric and street lighting layout in electronic form for your City's use.
Shown on the. enclosed electric layout map far this subdivision are proposed electric
distribution system and service .additions to provide electric service to the 96 lots included in
thin single-family residential development. An underground electric service layout has been
proposed to supply electric service to this development, in accordance with the ordinance
requirements of your City, as agreed with the Developer.
Street light pole installations to provide the maximum 300' spacing dictated by your
current City policy and lighting at all street intersections and cul-de-sacs have been specified.
Additional easements .required to provide services to supply the designated street light installa-
tions are also shown on the street lighting plan shown on the enclosed. electric layout drawing.
In accordance with the new policy of your City, the Developer is responsible for
reimbursing your City for 20 % of the total estimated cost of electric service installation,
' including labor,. materials, and the standard fee percentages for engineering and overhead cost.
We compute that the 20% cost contribution required for the Pebble Creek Phase 4 Subdivision
amounts to $17,114.80.. This cost was calculated based. on a total electric service cost estimate
of $85,574.013. The total electric service cost estimate developed for this project includes on
standard allowance of 30 % to cover your City's labor related overhead costs, 7 % for .material
handling costs, and 8.5 % to cover your City's administrative and engineering costs.
q~l-~
City of College Station Page 2
February 4, 1994
I trust you will find herewith all .the .information required. If not, or if questions arise,
please do not hesitate to advise.
Yours very. truly,
McCORD ENGINEERING, INC.
~. ~ ~
Jimmy .McCord, P.E.
President
7DM/mw
Enclosures
cc: 7r. 'David",.:P.ulten` (w/enci:~`
McCord Engineering, Inc. February 1, 1993
CS-TSD-b-P.7 LJORK ORDER N0.
CITY OF COLLEGE STATION
PEBBLE CREEK SUBDIVISION PHASE 4
PROJECT COST ESTIMATE
COST ($) PER 1 ASSEMBLY'
LETTER ----------------- -------- TOTAL
CODE ASSEMBLY DESCRIPTION QTY LABOR MAT. TOTAL COST $
UD#1/0 URD 1/0 PRIMARY URD CABLE 8.300 1050.00 1189.00 2239.00 18583.70
UG7-25 UG 25 KVA 1 PHASE 100P FEED 30 256.00 871.79 1127.79 33833.70
UJ2-b-B BARE SECONDARY CONNECTOR BLOCK 30 15.00 15.54 30.4 916.20
UJ2-6-I INSULATED SECONDARY CONNECTOR BL b0 15.00 25.15 40.15 2409.00
UM1-5C CONCRETE TRANSFORMER PAD 30 120.00 59.27 179.27 5378.40
UM6-1 LOAD BREAK ELBO41 60 65.00 45.00 110.00 6b00.00
UM6-b GROUND ROD ASSEMBLY 30 8.00 9.05 17.05 511.50
68232.20
TOTAL LABOR = 25485.00
TOTAL MATERIAL = 42747.20
TOTAL = 68232.20
LABOR OVERHEAD 30% = 7b45.50
MATERIAL HANDLING 7% = 2992.30
TOTAL 78870.00
. ENGINEERING & OVERHEAD 8.5% = 6703.95
GRAND TOTAL $85,573.95
ROUNDED TO $85,574.00
i,=. DEVELOPERS CONTRIBUTION 20% _ $17,114.80
,_
~.
f; . ,
McCord Engineering, Inc. February 1, 1993
CS-TSD-b-P.7 WORK ORDER N0.
CITY OF 'COLLEGE STATION
PEBBLE CREEK SUBDIVISION PHASE 4
B I L L O F M A T E R I A L
M A T E R I A L CATALOG TOTAL UNIT TOTAL
CODE ITEM N0. MATERIAL DESCRIPTION. REF. N0. QTY. COST 9> COST $
29 Ufz 33 -UTILCO BARE TERMINATOR 28500800006 -30 15.54 466.20
29 Ufz 34 UTILCO INSULATED CONN. 28500800007 60 25.15 1509.00
28 Ul 50 UG EQUIPMENT LOCK 832040 30 b.00 180.00
27 bu 64 1/0 H-TAP. COPPER CONN 28502200003 30 1.7~- 52.20
25 ai 150 8' COPPERWELD GROUND ROD .28503800001 30 8.33 249.90
25 aj 156 .5/8" GROUND ROD CLAMP 28504700025 30 .72 21.b0
27 tlhp 230 1/0 LOADBREAK ELBOW 28508200001 b0 45.00 2700.00
28 Uhb 276 URD BUSHING INSERT 2850950000b b0 17.99 1079.40
28 Uan 400 25 KVA PADMOUNT 120/240.: 28508600031 30 826.Ti~ 24803.10
27 Uhv 523 1/O URD AL. PRIMARY 28008000001 8.300 1189.00 9868.70
28 an 780 TRANSFORMER GROUND LUG 28502200026 30 1.3A 39.00
28 Uan 822 .CONCRETE TRANSFORMER PAD 21001700001 30 59.27 1778.10
-,1 42747.20
~-
MEMORANDUM
TO: Jane ..Key
Planning Department
City of College Station
FROM: Ray Crow ~
Engineers Office
Brazos County
DATE: February 10, 1994
In reference to the issue we discussed over the telephone on Friday, February 04, 1994,
Brazos County would choose to .not have any involvement in the platting process. of the
small portion of a road in Pebble Creek Phase IV.
I visited with our County Engineer, Richard Vance, concerning this matter and he agreed
with me that since the entire length of this road is located in Pebble Creek and does not
intersect any county roads, it would only be a confusing situation.
PEBBLECR
cc: Richard Vance, P.E.
~. `' ~ ~~~
~~~ ~~~J~.~/