HomeMy WebLinkAboutMiscellaneousCommissioner Gary Norton
Precinct 1
Commissioner Randy Sims
Precinct 3
BRAZOS COUNTY
ROAD AND BRIDGE DEPARTMENT
Richard F. Vance, P.E., County Engineer
RJ. Holmgreen, County Judge
November 15, 1994
Commissioner Walter Wilcox
.Precinct 2
Commissioner Milton Turner
Precinct 4
Larry Wells;
iv9unicipal Deveiopmeni group
.203 Holleman Drive East
College Station, TX 77840
RE: Final Plat/Westminster Subdivision Phase II
On Monday, November 14, 1994, the Brazos County Commissioners' Court discussed
and approved the referenced plat.
If there are questions please contact us at 409-822-2127.
Sincerely,
~ r~~~
~i%'°! G
Richard F. Vance, P.E.
County. Engineer
WESTMINS.LT
cc: Office File(s)
2617 Highway 21 West Bryan, Texas 77803 (409) 822-2127
FILE NOTE
Westminster Phase II E.T.J. Subdivision
Case #94-247
J
A formal presubmission conference meeting was not held because at the staff meeting; on
Friday, October 28, 1994 there were no comments with the exception of three questions
by the engineering staff:
(1) County approval of the plat?
The final plat is scheduled foi° Brazos County Conanaissiorrer's Court on Monday,
November 7, 1994. Larry will submit a letter..f °om the county with the revised
plat by this Friday, November 11, 1994.
(2) Electrical line has been deleted on the plat -has it been relocated?
Yes.
(3) What are the intentions with the relocation of the drainage channel? Will you be
doing regrading on the adjacent property.
No reg~°ading will be done on the adjacent property. The drainage channel was
platted on phase one and the section shown. on phase ttivo is following the low
point and natural g~•ound. On the preliminary plat, the City counters stopped so
the USGS irrfornzation wets used. There will be no ~°egrading, all drainage will go
to a natural point at Barron Road Cut-Off (cuh>ert).
~~~~~
~~,~ ~~ ~w~ ~,~
~~ ~~