Loading...
HomeMy WebLinkAboutMiscellaneousCommissioner Gary Norton Precinct 1 Commissioner Randy Sims Precinct 3 BRAZOS COUNTY ROAD AND BRIDGE DEPARTMENT Richard F. Vance, P.E., County Engineer RJ. Holmgreen, County Judge November 15, 1994 Commissioner Walter Wilcox .Precinct 2 Commissioner Milton Turner Precinct 4 Larry Wells; iv9unicipal Deveiopmeni group .203 Holleman Drive East College Station, TX 77840 RE: Final Plat/Westminster Subdivision Phase II On Monday, November 14, 1994, the Brazos County Commissioners' Court discussed and approved the referenced plat. If there are questions please contact us at 409-822-2127. Sincerely, ~ r~~~ ~i%'°! G Richard F. Vance, P.E. County. Engineer WESTMINS.LT cc: Office File(s) 2617 Highway 21 West Bryan, Texas 77803 (409) 822-2127 FILE NOTE Westminster Phase II E.T.J. Subdivision Case #94-247 J A formal presubmission conference meeting was not held because at the staff meeting; on Friday, October 28, 1994 there were no comments with the exception of three questions by the engineering staff: (1) County approval of the plat? The final plat is scheduled foi° Brazos County Conanaissiorrer's Court on Monday, November 7, 1994. Larry will submit a letter..f °om the county with the revised plat by this Friday, November 11, 1994. (2) Electrical line has been deleted on the plat -has it been relocated? Yes. (3) What are the intentions with the relocation of the drainage channel? Will you be doing regrading on the adjacent property. No reg~°ading will be done on the adjacent property. The drainage channel was platted on phase one and the section shown. on phase ttivo is following the low point and natural g~•ound. On the preliminary plat, the City counters stopped so the USGS irrfornzation wets used. There will be no ~°egrading, all drainage will go to a natural point at Barron Road Cut-Off (cuh>ert). ~~~~~ ~~,~ ~~ ~w~ ~,~ ~~ ~~