HomeMy WebLinkAboutMiscellaneous.~
~y-aa~
~'~ CITY OF' COLLEGE STAT IOl`I
ENGINEERING DIVISION
Post Office Box 9960 1101 Texas Avenue
College Station, Texas 77842-0960
(409) 764-3570
MEMORANDUM
DATE: August 11, 1995 ~ ~~ ~ ~ `
To: Kent Laza, P.E.
City Engineer
FROM: Steve Homeyer S \"~
Graduate Engineer
SUBJECT: Pebble Creek Development Agreement
This is the information you requested for the development agreement between the City and Pebble
Creek Development Company. If you have any questions or need further information let me
know.
a Oversize costs for Parkview Drive and l2" waterline:
Street Participation $105,000
Waterline Participation 17,500
$122, 500
• Park land dedication on the east side of the elementary school site:
There were 27.29 acres of park land dedicated as recorded in Volume 1029,
Page 13 of the Deed Records of Brazos County, Texas. The 4.36 acres of park
land. as platted in Pebble Creek Phase SA, is in excess of the required park land
dedication .for the development of the Pebble Creek Subdivision.
® Participation in storm sewer
Accordingto the drainage areas of City owned properties in the Pebble Creek and
Business Park area, the City should participate in 2.5% of the cost of the storm
sewer. The drainage area of Phase 5 can be broken down into the following areas:
The Business Park does not contribute to this drainage area.
Contributing Parl< Area = l.3 Acres
Phase 5 Drainage Area = _5;.5 Acres
(l . ~ Ac/> ;.5 Ac)(l 00) = 2.43%
cc: Veronica Morgan, P.F_., Asst. City Engineer
~~ ~~ ~s~~
..~-
~~- `~'c
~, i~'
uJ,o.~• ~ ~~ CS
~~a
~lo~
~~~°
~ .
Cpl rp Je• ~.".~`
~.,
~•
~y~j
~~