Loading...
HomeMy WebLinkAboutMiscellaneous FILE NOTE .T one 20. 1994 RE: Emerald Forest Phase 10 &10A As per telephone conversation with Deborah Keating of Urban Design Group the following information was obtained: 1. Concerning request for oversize participation, Appomattox Rd.: Allen Swoboda is working in conjunction with Elrey Ash and the two construction projects were not publicly bid. A development agreement supposedly covers the oversize participation. However, the agreement currently found in file covers only through Emerald Forest Phase 8 2. Concerning infrastructure: There will be no letter of guarantee, but the utility infrastructure will be built before the plat is expected to be filed. 3. Concerning North Forest Pkwy. Phase lOA: The dimensioning error was noted and the final plat will be picked up and corrected then returned. 4. A note stating that an engineer's estimate is needed for Phase 10 & lOA was placed with the plat to be picked up. Fred Paine. AGENDA ITEM COVER SHEET REGULARAGENDA STATUTORY AGENDA CONSENT AGENDA ITEM SUBMITTED BY: Brett McCully, Project Engineer FORCOUNCILMEETINGOF: June9, 1994 DIRECTOR APPROVAL: EXECUTIVE TEAM MEMBER APPROVAL: ITEM: Combined consideration of Final Plats for Emerald Forest Phases 10 and lOA (94-206 and 94-207) ITEM SUMMARY: These plats lie on the north andeast sides of the existing Phase 8 development. Phase 10 includes 14.11 acres being divided into 37 single family residential lots. Phase. lOA includes only the necessary right of way for North Forest Parkway across the project's northern boundary. and includes 1. 983 acres. Included within the staff report is a recommendation to require the inclusion of aright of way dedication within one of the maps, as explained at the Planning and Zoning Commission, staff has clarified this requirement with the Legal Department, and stated that no modification of the maps is required. These. plats were reviewed together by the Planning and Zoning Commission on May 19th and approved unanimously with the urging by the Commission that the City's portion of North Forest Parkway from this development to the East Bypass be undertaken as soon as possible. STAFF RECOMMENDATIONS: Staff recommends approval of both plats. FINANCIAL SUMMARY: CITY ATTORNEY RECOMMENDATIONS: COUNCIL ACTION DESIRED: Accept staff recommendation and approve plat. SUPPORTING MATERIALS: 1. Surrounding Area Map (SAM) 2. Presubmission Conference Report 3. Staff Report 4. Planning and Zoning Commission minutes 5. Copy of Final Plat