Loading...
HomeMy WebLinkAboutMinutes Commissioner Smith stated that the current zoning of the property includes many of the uses that the School District is concerned about; however, the C-l district allows even more intense uses for the property. There is no guarantee that the property will be developed as proposed with an office complex and a convenience store once the property is rezoned. The motion to deny the rezoning request passed (2 - 1 - 1); Commissioner Mariott voted in opposition to the motion, Commissioner Hall abstained from voting and Chairman Hawthorne removed himself from the consideration of the request due to a conflict of interest. AGENDA ITEM NO.3: Consideration of a final plat of Tracts A, B and C of Southwood Valley Section 30. (94-204) Chairman Hawthorne excused himself from considering agenda items two and three due to a conflict of interest. City Engineer Pullen presented the staff report and recommended approval of the final replat with the recommendations outlined in the Pre submission Conference Report Commissioner Mariott moved to. recommend approval of the final plat of Tracts A, Band C of Southwood Valley Section 30 with staff recommendations. Commissioner Lane seconded the motion which passed unopposed (4 - 0). AGENDA ITEM.. NO. .4: Consideration of a final plat of the Industrial Park Phase ll. (94- 20SV City Engineer Pullen presented the staff report and recommended approval of the final replat as presented. Commissioner Mariott rnoved to recommend approval of the final plat of the Industrial Park Phase II as presented. Commissioner Hall seconded the motion which passed unopposed (5 - 0). AGENDA ITEM NO.5: Consideration of a final plat of the Gateway Park Subdivision. (94-203) City Engineer Pullen presented the staff report and stated that the purpose of this replat is to. replace .a temporary blanket easement . with . permanent dedicated easements. Staff recommended approval of the final plat with. the conditions outlined in the Pre submission Conference Report. Commissioner Lane moved to recommend approval of the final plat of the Gateway Park Subdivision with staff recommendations. Commissioner Mariott seconded the motion which passed unopposed (5 - 0). AGENDA.ITEM NO. .6: Consideration of a preliminary plat. of Pebble Creek Phase Four. (94-300) City Planner Kee presented the staff report and stated that the proposed configuration differs slightly from the original approved master plan but this design is better from an access .standpoint. Lots will.not be accessing directly to Spearman Drive. but rather will be accessing from a rear alley. The property will need to be rezoned prior to filing of any final plats. Commissioner. Hall moved to recommend approval of the preliminary plat with staff recommendations. Commissioner Smith seconded the motion which passed unopposed (5 - 0). P & Z Minutes Februflry 3, 1994 Page 3 PRESUBMISSION CONFERENCE REPORT January 24, 1994 TO: Earl Havel, Garrett Engineering 4444 Carter Creek Pkwy, Ste 108, Bryan, TX 77802 Jim Woods P. O. Box 10220, College Station, TX 77842 FROM: Project Review Committee: Jane Kee, City Planner David Pullen, City Engineer Julius Gribou, P & Z Representative Others Attending: Natalie Thomas, Planning Technician Samantha Smith, Engineering Assistant Tony Michalsky, Electrical Operations Coordinator Shirley V olk, Development Coordinator George Spain, Fire Marshal Pete Vanecek, Senior Parks Planner Laverne Akin, GTE Representative Pat Clark, TCA Cable Representative SUBJECT: Final Plat - Industrial Park Phase II; proposed replat of lot one totalling 0.975 acres into two C-l general commercial lots located approximately 1000' east of the intersection of Wellborn Road and Graham Road. (94-205) A Pre submission Conference was held Wednesday, January 29, 1994 to discuss the above mentioned preliminary plat. The foIl owing comments were made by the various reviewing agents: PLANNING: Verify that the additional 5' of right-of-way along Graham Road was dedicated. ENGINEERING: Submit a letter explaining the differences or correct the discrepancies in dimensions and angles between the previous final plat and the proposed replat. SUBMIT 10 COPIES AND 1 MYLAR REPRODUCIBLE OF THE REVISED PRELIMINARY PLAT AND BY FRIDAY, JANUARY 28, 1994 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, FEBRUARY 3, 1994. THE CITY COUNCIL WILL CONSIDER THE PLAT ON THURSDAY, FEBRUARY 24, 1994.