Loading...
HomeMy WebLinkAboutMinutes PRESUBMISSION CONFERENCE REPORT January 13, 1994 TO: Alberstadt Incorporated 15907 River Roads Drive, Houston, TX 77079 Gregory K. Taggart, Municipal Development Group 203 Holleman Drive East, Col ge Station, TX 77840 FROM: Project Review Committe; . Jane Kee, City Plan~ David Pullen, City En 'n er Charles Smith, P&Z R resentative Others Attending: Natalie Thomas, Planning Technician Tony Michalsky, Electrical Operations Coordinator Shirley V olk, Development Coordinator Samantha Smith, Engineering Assistant Pete Vanecek, Senior Parks Planner George Spain, Fire Marshal Laverne Akin, GTE Representative Mike Lavender, TCA Cable Representative George McLean, CSISD Representative SUBJEct: FINAL PLAT - University Park II; proposed replat of 1.717 acres known as block S-I, lots 1, 2 and 3 to be resubdivided into four lots for three duplexes and one fourplex on Winter Park Drive. (94-202) The Project Review Committee met on Wednesday, January 12, 1994 to consider the above mentioned final plat. The following comments were made by the various reviewing agents: STAFF COMMENTS: Reference the volume and page numbers of previously dedicated public utility easements noted on the final plat drawing. Rename the 20' sewer easement located between lot 4R of block S-IR and block B to a "public utility easement" to cover the existing utilities in that easement. The proposed access drive and parking area for all four lots must be shown and dedicated as a cross parking and access easement. ---,~-. .. PRC Report University Park II Case #94-202 Page 2 Verify that conduit has been installed for telephone cable when the electrical conduit was installed. Coordinate details with GTE Representative Laverne Akin at (409) 821-4723. A drainage conference with the College Station engineering department is required prior to issuance of a drainage development permit to clarify some details in the impact study. Coordinate this conference with Development Coordinator Shirley Volk at (409) 764-3570. Place arrow heads on the lines that point to building setback lines and easements. If rear access and parking is provided to the development, the front setback can be reduced to 15'. SUBMIT 10 COPIES OF THE REVISED FINAL PLAT BY FRIDAY, JANUARY 28, 1994 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF FEBRUARY 3, 1994. THIS CASE IS SCHEDULED FOR CITY COUNCIL CONSIDERATION ON THURSDAy, FEBRUARY 24, 1994.