HomeMy WebLinkAboutMiscellaneous FILE NOTE Date: August 3, 1995 To: File Pebble Creek Phase 2B Case #94-200 From: ~~~~~~~~~~~~ee~ Mr. Dick .Haddox is the property owner of Lots 9 & 10, Block 17 in the Pebble Creek Phase 2B Subdivision. There is a fire hydrant currently located on the common line of the above mentioned lots. He is requesting the opportunity to have this hydrant relocated to the common line between lots 10 & 11. I spoke with Mr. .Jon Mies,C.S.F.D Fire Marshall, this afternoon and he stated he had no problem with this request due to the hydrants being approximately 830 feet apart. This does not exceed the maximum of 1000 feet required for fire protection. cc: Dick Haddox, Property Owner Tony Hawley, Water Distribution Supervisor Jon Mies, C.S.F.D. Fire Marshall Veronica Morgan, P.E. Assistant to the City Engineer City of College Station P.O. Box 9960 College Station, Texas 77842 Joe Orr, Inc. Surveyors & Engineers 2167 Post Oak Circle College Station, Texas 77845 (409) 690-3378 2 December 1993 Re: Pebble Creek phase 2B Sidewalks Dear Veronica; I am enclosing a revised sidewalk plan for Pebble Creek phase 2B. Mr. A.P. Boyd is requesting that sidewalks only be required on one side of Augusta Circle. The street is being constructed as a 39' pavement in a 60' right-of-way, but is only a residential street and not a collector. Several potential buyers have expressed a desire for this change and some large trees may be saved by it. I believe that Mr. Boyd has discussed this with you. ~- . . .-~-wotiltl'appreciate your review and approval of this change. .~....~'""''''"''' Thank you; Wlfrjp David R. Mayo, P.E. President R~CE\VED DEe 02\993 PRESUBMISSION CONFERENCE REPORT December 17, 1993 TO: Davis Young, Pebble Creek Development 4500 Pebble Creek Pkwy, College Station, TX 77845 FROM: David Mayo, Joe On, Inc. 2167 Post Oak Circle, College Station, TX 77845 U Project Review Committee ~\ Jim Callaway, Asst Director of Economic & Development Services \~ \ David Pullen, City Engineer Others Attending Natalie Thomas, Planning Technician Tony Michalsky, Electrical Operations Coordinator Samantha Smith, Engineering Assistant Pete Vanacek, Parks Senior Planner George Spain, Fire Marshal Mike Lavender, TCA Cable Representative Don Fazzino, Lone Star Gas Representative George McLean, CSISD Representative Final Plat - Pebble Creek Phase 2B; approximately 46.48 acres divided into 55 single family lots generally located west of Rock Prairie Road, east of Pebble Creek Parkway and south of Greens Prairie Road. (94-200) SUBJECT: A Presubmission Conference was held Wednesday, December 15, 1993 to discuss the above mentioned final plat. The Committee identified no problems with the final plat as submitted and recommended approval of the variance request to the sidewalk requirement that would allow a sidewalk to be built on only one side of Augusta Circle. SUBMIT 10 COPIES AND 1 MYLAR REPRODUCIBLE OF THE FINAL PLAT BY WEDNESDAY, DECEMBER 29, 1993 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE MEETING OF THURSDAY, JANUARY 6, 1993. THE CITY COUNCIL WILL CONSIDER THIS FINAL PLAT ON THURSDAY, JANUARY 27, 1994.