HomeMy WebLinkAboutMinutes
PRomcr REVIEW COMMITTEE REPORT
November 19, 1993
TO:
Richard Benning .
1802 Lawyer, College Station,TX. 77840
FROM:
pro~e.a.~e~~~..., ~.F.t. ~m.p........l..r::.~~:;W
David Pullen, · City E~er
Mike Lane, P & Z Representative
Others Attending
Natalie. Thomas, Planning Techn' ....
Tony Michalsky, Electrical Operatio s Coordinator
Samantha Smith, Engineering Assistant
Pete Vanacek, Parks Senior Planner
ShirleyVolk, .Development Coordinator
Sabine Kuenzel, Staff Planner
Laverne Akin, GTE Representative
Pat Clark, TCA Cable Representative
Conditional Use Permit - The Bull & Bear; proposed restaurant and bar to be
located in the 505 University Drive shopping center, suites 307 and 309. (93-715)
A Project Review Committee meeting was held Wednesday, November 17, 1993 to discuss the
above mentioned parking lot plan. City Engineer Pullen moved to recommend approval of the
use permit to the Planning and Zoning ComlUission with the site plan as submitted. P & Z
Representative Lane seconded the motion which passed unopposed (3- 0). The following
comments were made by the . various reviewing agents:
SUBJECT:
PUBLIC SERVICES:
Due to the heavy . need for solid waste disposal for restaurants, the applicant should
provide. solid .. waste generation data including. proposed container types and sizes to
Sanitation-Superintendent Jim Smith at (409) 764-3690.
FIRE:
The hood. system and fire extinguishers must. be re..tested prior to occupancy of the
building. Coordinate details with Fire Marshal George Spain at (409) 764-3705.
SUBMIT 10 COPIES OF THE SITE PLAN BY FRIDA Y,DECEMBER10, 1993 TO BE
INCLUDED IN . THE PLANNING AND ZONING COMMISSION PACKETS FOR THE
MEETING OF THURSDAY, DECEMBER 16, 1993.