Loading...
HomeMy WebLinkAboutMinutes PRomcr. REVIEW.. COMMITTEE REPORT November 19, 1993 TO: M. L. Hammons 1700 Kyle South, <College Station, TX 77840 John Godfrey,.. Godfrey Construction 1850 Greenfield Plaza, Bryan, TX 77802 FROM: Project Review Committee Jane. Kee, City PIa ne David Pullen, City ...ng"/ eer Mike Lane, P&ZRe .esentative Others Attending Natalie Thomas, Planning Tech ,Tony. Michalsky, ElectricalOperati . nS Coordinator Sal11anthaSll1ith, Engineering Assistant Pete Vanacek,. Parks Senior Planner ShirleyVolk,Development Coordinator Sabine Kuenzel, Staff Planner Laverne Akin, GTE Representative PatClark,TCA Cable Representative SUBJECT: Site Plan - The Enclave. at Holle111(lnrproposedapartment complex to be located along the south side of Holleman Drive adjacent tothe H.E.B. Grocery and Target Stores;. approximately 12.88 acres with a total of 340 living units. (93-506) AProjectReviewCornmitteerneeting was held Wednesday, November 17, 1993 to discuss the above . me Iltioned site plan. ...City. Engineer Pullen moved to reCOlnmend .approval of the site plan as submitted. with . the conditions.. that the lanqscaping, dumpster and .. fire. hydrant locations be provided by the applicant and approved by ... staff. P & Z Representative Lane seconded the motion which passed unopposed (3- 0). The following comments were made by the various reviewing .. agents: PLANNING: Show. proposed ..dumpster .locations and ptoposed..screening. Coordinate sizing and pick- up details with SanitationSllperintendent Jim Smith at (409) 764-3690. Provide driveway. locations and dimensions. along both sides of Holleman Drive including the distances from the: proposed access points. Additionalparking..islands must be installed . throughout the site. Islands must be installed between a rnaximumof 15. parking spaces within the interior and 20 parking spaces on the periphery of the site. An island must be installed along the rear property line where handicap spaces are proposed. The proposed handicap ramp can be integrated into the island. PRe Report The Enclave Case #93..506 Page 2 Provideexistinganctproposedfirehydrantlocationsand fire lanes. Coordinate the details of the security gate With Fire Marshal George Spain at (409) 764- 3705 and Sanitation Superintendent Jim Smith at . (409) 764-3690. Provide additional details in.. the construction documents. pertaining to the proposed pedestrianconneqtienattnel'ear oftbeproject. Coordinate details with City Engineer David Pullen at (4Cl9) 764-3570.> . , Suggested .. thatlhea~f11icantconsider ..~edestrian . access.. throughout the site . and traffic from the complex totheR.E.B. and. Target snoppingcenter. A drainage de~elopll1entperll1itjs requiredptior to any site work. Coordinate details with Assistant City:Engineer VerCloica ... Morgan at .. (409) .764~3.510. ShowexistingC'indproposed water and sanitary sewer mains. On the existing mains, note sizingandmtlterials. Suggested that . tr~est>e located~l ll1inirnuit1oIIO' . and shrubs a minirnum of 5' away . from public 111'ains.C()C)rdinatedetaids . with ...Engineering Assistant .SamanthaSmi th .at(409) 764-3660. ELECTRICAL: Show the existingandprOf1osed easel11entsbe.tween the. subject property and the adjacent HEBffarget..property. Showtheexlsting...PQle .l()€ations,attherear and east . ends of the property. Submit a request for electriCal service irlorder.to initiate the utility design work fotthe project. . Coordinate details .with Electrical Operations Coordinator Tony Michalsky at (409) 764..S660. PARKS: Parkland dedication must be ~ubrnitteain the~mountof $225 per dwelling uniLprior to issuance .ofa'buildingpermit. Submit. preliminary laI1dscapeplanincluding the total. point requirements prior to. issuance of a building permit. . Coordinate. details with. Parks. Senior Planner Pete V'anacekat. (409) 764-3713. SU13~IT4SETS OFCQMPLE',TE CQ:N"S"fRtJCTION DOCUMENTS WITH THBREVISED SITEPLANA.1'1'ACEIEDAIN"D. 4 AJI)})ITlqNAL COPIES OF THpSITEPLAN ONLY TO CONTINUE......WITH..PHASE .TWO. ()F....THE<BUILDING.PERMIT . PROCESS.