PRomcr. REVIEW.. COMMITTEE REPORT
November 19, 1993
TO: M. L. Hammons
1700 Kyle South, <College Station, TX 77840
John Godfrey,.. Godfrey Construction
1850 Greenfield Plaza, Bryan, TX 77802
FROM: Project Review Committee
Jane. Kee, City PIa ne
David Pullen, City ...ng"/ eer
Mike Lane, P&ZRe .esentative
Others Attending
Natalie Thomas, Planning Tech
,Tony. Michalsky, ElectricalOperati . nS Coordinator
Sal11anthaSll1ith, Engineering Assistant
Pete Vanacek,. Parks Senior Planner
ShirleyVolk,Development Coordinator
Sabine Kuenzel, Staff Planner
Laverne Akin, GTE Representative
PatClark,TCA Cable Representative
SUBJECT: Site Plan - The Enclave. at Holle111(lnrproposedapartment complex to be located
along the south side of Holleman Drive adjacent tothe H.E.B. Grocery and Target
Stores;. approximately 12.88 acres with a total of 340 living units. (93-506)
AProjectReviewCornmitteerneeting was held Wednesday, November 17, 1993 to discuss the
above . me Iltioned site plan. ...City. Engineer Pullen moved to reCOlnmend .approval of the site plan
as submitted. with . the conditions.. that the lanqscaping, dumpster and .. fire. hydrant locations be
provided by the applicant and approved by ... staff. P & Z Representative Lane seconded the
motion which passed unopposed (3- 0). The following comments were made by the various
reviewing .. agents:
PLANNING:
Show. proposed ..dumpster .locations and ptoposed..screening. Coordinate sizing and pick-
up details with SanitationSllperintendent Jim Smith at (409) 764-3690.
Provide driveway. locations and dimensions. along both sides of Holleman Drive including
the distances from the: proposed access points.
Additionalparking..islands must be installed . throughout the site. Islands must be installed
between a rnaximumof 15. parking spaces within the interior and 20 parking spaces on
the periphery of the site. An island must be installed along the rear property line where
handicap spaces are proposed. The proposed handicap ramp can be integrated into the
island.
PRe Report
The Enclave
Case #93..506
Page 2
Provideexistinganctproposedfirehydrantlocationsand fire lanes.
Coordinate the details of the security gate With Fire Marshal George Spain at (409) 764-
3705 and Sanitation Superintendent Jim Smith at . (409) 764-3690.
Provide additional details in.. the construction documents. pertaining to the proposed
pedestrianconneqtienattnel'ear oftbeproject. Coordinate details with City Engineer
David Pullen at (4Cl9) 764-3570.> . ,
Suggested .. thatlhea~f11icantconsider ..~edestrian . access.. throughout the site . and traffic
from the complex totheR.E.B. and. Target snoppingcenter.
A drainage de~elopll1entperll1itjs requiredptior to any site work. Coordinate details
with Assistant City:Engineer VerCloica ... Morgan at .. (409) .764~3.510.
ShowexistingC'indproposed water and sanitary sewer mains. On the existing mains, note
sizingandmtlterials.
Suggested that . tr~est>e located~l ll1inirnuit1oIIO' . and shrubs a minirnum of 5' away . from
public 111'ains.C()C)rdinatedetaids . with ...Engineering Assistant .SamanthaSmi th .at(409)
764-3660.
ELECTRICAL:
Show the existingandprOf1osed easel11entsbe.tween the. subject property and the adjacent
HEBffarget..property.
Showtheexlsting...PQle .l()€ations,attherear and east . ends of the property.
Submit a request for electriCal service irlorder.to initiate the utility design work fotthe
project. . Coordinate details .with Electrical Operations Coordinator Tony Michalsky at
(409) 764..S660.
PARKS:
Parkland dedication must be ~ubrnitteain the~mountof $225 per dwelling uniLprior to
issuance .ofa'buildingpermit.
Submit. preliminary laI1dscapeplanincluding the total. point requirements prior to. issuance
of a building permit. . Coordinate. details with. Parks. Senior Planner Pete V'anacekat. (409)
764-3713.
SU13~IT4SETS OFCQMPLE',TE CQ:N"S"fRtJCTION DOCUMENTS WITH THBREVISED
SITEPLANA.1'1'ACEIEDAIN"D. 4 AJI)})ITlqNAL COPIES OF THpSITEPLAN ONLY TO
CONTINUE......WITH..PHASE .TWO. ()F....THE<BUILDING.PERMIT . PROCESS.