HomeMy WebLinkAboutMinutes PROJECT.. REVIEW COMMITTEE REPORT August 5, .1993 TO: Walter & Stephen.Bradley 1302 Augustine. Court, College Station, TX 77840 Larry Wells, Municipal Development. Group 203 Holleman.Drive East, College Station, TX 77840 FROM: Project. Review Committe ... Jane Kee, CityPlann David. Pullen, City Engi Charles Smith, P .&Z Others Attending: Natalie Thomas, Planning Technician Samantha. Smith, Engineering Assistant Tony Michalsky, Electrical Operations. Coordinator Shirley Volk, . Development Coordinator Pete Vanecek, Parks Senior Planner Steve Smith, .. Fire Inspector Laverne Akin, GTE Representative Don. Fazzino, Lone . Star Gas Representative SUBJECT: SITE PLAN - Bradley Subdivision; six proposed fourplexes to be located on lot 38R, block 14 of Southwood Section 25. (93-502) The . Project Review Committee meton.Wednesday, August 4, 1993 discuss. the above. mentioned site plan. The Committee voted unanimously to approve the site plan with the following comments and concerns from the various reviewing agents: ENGINEERING: Adrainagedevelopmenr>permit is required prior to any site work. Coordinate proposed drainage plan and submittal requirements with City Engineer David Pullen at (409) .764-3570. Correct the reference to the rear "Retention Area" to read "Detention Area". Submit a · copy of the homeowner's. association agreement thar.addresses maintenance of the common areas including access and cross parking agreements. Concerned with the impact of the proposed rear detention area on the existing sanitary sewer line. As a part of this development, the applicant may be required to replace that line. Address these impacts in the drainage report. PRe Report Bradley Apartments Page 2 PLANNING: Staff is in. the process of revising the parking requirements for multi-family development. The City Council is scheduled to cons icIer the ordinance. amendment on Thursday, Allgust 26, 1993. Unlessa building permit is issued prior to the ordinance being adopted, the new parking requirements must be met. Coordinate details with City PlaIlner Jane Keeat(409} 764-3570. Coordinate landscape plan details with Mapping Specialist Nanette Manhart at (409) .764-3570. Add the.. proposed bedroom mix to the parking legend. Parkland dedication in the formofamonetary contribution of $225 per living unit will be required prior to : issuance of a building permit. Submit fee to Development Services Staff Assistant Deborah Grace at (409) .764~3570. WATERlWASTEi.WATER: Note sizes of existing sanitary sewer mains and whether they are existing. or proposed. Show the water and sanitary. sewer loadings in..the construction documents. Suggested that shrubs be placed at least 5' and trees at least 10' away from all sanitary sewer and water lines. Coordinate. details. with Engineering Assistant . Samantha Smith at (409)764-3660. ELECTRICAL: This development wiHbeserve? by underground utilities. The developer is responsible for installing all conduit. .. Submit. a letter . req uesting underground electrical service to Electrical.. Opera tionsCoordina tor Tony Michalsky at (409) 764-3660. Show. the pole locations of the existing overhead utility lines. along the rear of the. property. FIRE: The proposed fire hydrant should be relocated. to. the north side of the entrance drive, closer to Southwood Drive, in the end parking island of the first parking row. Coordinate details with Fire Inspector George Spain at. (409) 764..3705. The proposed median located in the rear turnaround area, should be marked as a fire lane in accordance with curren to rdinancereq uire ments. G.T.E.: Extend the. public utility . easement to Southwood Drive. Telephone .lines will be located.. in the same trench with electrical lines. Thedeveloper.is responsible for . installation of all conduit. Coordinate telephone servicewith..G.T.E. Representative. Laverne Akin at 821..4723. LONE STAR GAS: There is an existing gas main located along Southwood Drive. Contact Lone Star Gas Representative DonPazzino at (409) 776..0627 to locate that. line prior to site work. SUBMIT 4 COMPLETE SETSOp.. CONSTRUCTION DOCUMENTS WITH THE REVISED SITE. PLAN ATTACHED AND .4. ADDITIONAL REVISED .SITE PLANS TO CONTINUE . WITH PHASE II OF THE BUILDING PERMIT..PROCESS. PROJECfREVIEWCOMMIITEE REPORT July 22, 1993 TO: Walter & Stephen Bradley 1302 Augustine Court, College Station, TX 77840 Larry Wells, Municipal Development Group 203 Holleman Drive East, College Station, TX77840 FROM: Project Review Committee: Jane Kee, City Planner Brett. McCulley, Project Engineer Mary Elizabeth Herring, P& Z Representative Others Attending: Natalie Thomas, Planning Technician Samantha.. Smith, Engineering Assistant Tony Michalsky, Electrical Operations. Coordinator ShirleyVolk, Development Coordinator ' Laverne Akin,.GTE Representative SUBJECf: CONCEPTUAL SITE PLAN-.. Bradley. Subdivision; six proposed fourplexes. to .be located on. lot 38R,block 14 of Southwood Section 25. (93-502) The Project Review Committee met on Wednesday, July 21,1993 discuss the above mentioned conceptual site.... plan. Since the.plan is ..conceptual in nature, the complete site plan and possibly a finaL plat will need to be submitted to the Committee for review. The following comments were made by the various reviewing agents: ENGINEERING: A drainage development permit is required prior to any site work. Coordinate proposeddrainage.plan and submittal. requirements with City Engineer David Pullen at (409) 764-3570. Address the access and cross parking agreements between the proposed individual lots .. if the property is. to . be . replatted. Maintenance of any common areas. should also be addressed with ... the submittal of the. complete site plan or final plat. Submit .a copy of the homeowner's association agreement that addresses maintenance of the . common areas. PRC Report Bradley Sub Case #93-502 Page 2 PLANNING: Staff is in the . process of revIsIng the parking requirements for multi-family development. The City .. Council.. is scheduled to consider the ordinance amendment on. Thursday, August 26, . 1993. Unless a building permit is issued prior..to the ordinance being adopted, the new parking requirements must be met. Coordinate details with City Planner Jane Kee at (409) 164-3510. Screening is required between the proposed development and the adjacent single family homes. Submit a landscape plan including the existing trees that are to be saved and how they will.. be barricaded. Coordinate landscape plan details with Mapping Specialist Nanette Manhart at (409) 764-3570. WATERlWASTE. WATER: Provide public utility easements to service each..lot with water and sanitary sewer service. Coordinate details with Engineering Assistant Samantha Smith at (409) 764-3660. ELECfRICAL: This development will be served by underground utilities. The developer is responsible for installing all conduit. Submit a letter . requesting . underground electrical service to Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. Provide a 20'. public. utility easement along the rear of the property. If there is a 10' easement on the adjacent property, this development can dedicate the remaining 10'. FIRE: Coordinate fire . lane and turnaround radius requirements with Fire Inspector George Spain at (409)764-3705. G.T.E.: Extend the public utility easement to Southwood Drive. Telephone lines will be located in the same trench with electrical line. The developer is responsible for installation .ofall.. conduit. . Coordinate telephone service with G.T.E. Representative Laverne Akin at 821-4723. SUBMIT 15 COPIES. OF A COMPLETE SITE . PLAN TO BE REVIEWED. BY THE PROJECT REVIEW COMMITTEE. COORDINATE. SUBMITTAL REQUIREMENTS. AND.... DEADLINE DATES WITH PLANNING TECHNICIAN NATALIE THOMAS AT (409)764-3570.