HomeMy WebLinkAboutMinutes
PROJECTREVIEWCOMMITrEEREPORT
July 12, 1993
SUBJECT:
MarkS. Mucasey, .A.I.A.
1964 West GraySte201, Houston, TX77019
Pro~~~,i~e~~~n;~fSi~~;p:lan~ .. /
David Pullen, City Engineer "3 ~
Oth~~fA,...t.~.e.....r.ni,~~..n,j.: p. &. Z R.. .ep.res. ent, ~tiV~(].~.. ~
Natalie Thomas, Planning Techb~
Samantha Smith, Engineering As~~nt
George Spain, . Fire Inspector
Laverne .Aldn,GTE Representative
SITE PLAN -Redstone Apartments proposed addition for a leasing center
generally located on' the,' 'northwest quadrant of the' BarthelowDrive and
BrentwoodDrive'intersection. (93-500)
TO:
FROM:
The Project Review Committee reviewed. the. above mentioned parking lot plan
Wednesday, July 7, 1993 and voted to approve the site plan with the condition that the
dead end parking area, located adjacent to the northeast of the leasing office, be
reconfiguredtorelocate the proposed entrance drive, relocate the four parking spaces in
the front of the addition and replace any parking<spaces that are removed as part of the
redesign. The following comments were also made by the various reviewing agents:
ENGINEERING:
A drainage development is required prior to any site work. Coordinate details
with City Engineer David Pullen at (409) 764-3570.
BUILDING:
Show details of .the . proposed 8' fence to, be. located around the pool area.
Coordinate building code requirements with Building Official Coy Perry at (409)
764-3741.
ELECTRICAL:
Coordinate electrica.l service with Electrical Operations Coordinator Tony
Michalsky a t( 409)764~ 3660.
PRCReport
Redstone Apts
Case #93-501
Page 2
PLANNING:
Submit some form of >assurance that the proposed' facilities will be utilized by
apartment residents only. Coordinate details with Staff Planner Sabine Kuenzel
at (409) 764-3570.
The entire apartment complex. is under a non-conforming status based on the
parking shortage of approximately 120 spaces. The Zoning Board of Adjustment
has granted a special exception to allow the expansion; however, any parking
spaces that are removed as, a result of the addition, must be replaced elsewhere
on the site.
Relocate the dumpster shown north,'of the proposed addition, near building 10, to
the landscape island nearest bl.lilding 19. The dumpster must be screened on
three sides. Coordinate details with Sanitation Superintendent Jim Smith at (409)
764-3660.
Close the. existing curb cut in front of the proposed building and turn this area
into a landscaped lawn. Create a new drive entrance to the east of the existing
drive.
WATER:
Show all existing utilities and fire hydrant locations within this immediate area.
Coordinate. specific locations with Engineering Assistant. Samantha Smith at (409)
764-3660.
Submit increased water demands if an additional water meter is needed to Water
Operations ManagerDeanSharpat(409)764~3660.
LEGAL:
Show all existing.' easements. Building in the private access easement can be done
only if lot 5 retains access to the parking.
LONE ,STAR GAS:
Coordinate "gas. service and submit, load ,requirements to Lone Star Gas
Representative Don Fazzino at (409) 776-0627.
GTE:
Coordinate telephone service with GTE Representative La Laverne Akin at (409)
821-4723.
SUBMIT4.COPIESOFCOMPLETE BUILDING PLANS WITH A REVISED SITE
PLAN ATTACHED 'AND 4 ADDITIONAL REVISED .SITE PLANS ONLY TO
CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS.