Loading...
HomeMy WebLinkAboutMinutes PRomCf REVIEWCOMMITfEE... REPORT November 30, 1993 TO: Michael C, Layne 701 Cherry Drive, College Station, TX 77840 Isabel Garcia 501 East 31st Street, Bryan, TX 77803 FROM: Project ..ReyiewCom111ittee: S~lbine ..Kuenzel, . Staff Planner Verqnica Morgan, Assistant City Engineer Craig Hall,. P& Z Representative Others ..Attending: Natalie<Thomas, Planning Technician Samantha Smith, :engineering Assistcmt l'o~yMicbal~ky, Electrical Operations Coordinator PeteVanecel<, Park~s Senior Planner O-eorge McLean, CSISD Representative SUBJECf: PARKll\f(} LOT.PLAN · Layne's of College Station; proposed restaurant to be locatect.at 106 Walton Drive .in the.formerWilson Plumbing building in the East G-ate shopping center. (93-422) The Project ReviewCofnmittee met on Wednesday, November 24, 1993 to discuss the above mentioned parking .lot plan.. . Staff Plan~erF(l1el1zelmoved to approve the parking lot plan as submitted with staff cOJl1ments. Assist~nt exty Engineer Morgan seconded the motion which passed unopposed (3 ..0). The following comments were made by the various reviewing agents: COMMENTS/CONCERNS: The electrical service will needlo be upgraded and installed underground. It is the developer's responsibility to install thr.iconduitand provide the easement for the service line. . . Submit size and type of Syrvicf ~nd coordinate details with Electrical Operations Coordinator Tony Michalsky at (409). 764~3660. Submit water demands and sanita:r~. sewer loadings in order to size the meter. Coordinate details. with Engineering t\~~istant. Samantha Smith at (409) 764-3660. Add a landscape legendtb incluqe b:of~nicaL andcOffiffion names and plant material and points required and proposed.~ho\Vi f~e hose bibs locations or not if an irrigation is to be installed. . Coordinate landscaping ~ytails with Parks Senior Planner Pete Vanecek at (409) 764-3773 Show thedinlensions of the actual restaurant. and storage areas on the site plan. c t "';'!II' PRC Report Layne's of CS Case #93.422 Page 2 Coordinate dumpster size, capacity and frequency of pick-up with SaJlitation Superinterldent. JiU1S1Uith at (409) 764.3690. A drainage development permit is required prior to any site work. Coordinate details with Assistant City Engineer. Veronica Morgan at (409) 764.3570. Expressed concern of. the encroachment of the. parking island on to lot 9. Work with staff to determine the necessary signage required for the proposed drive-thru traffic. Show the proposed traffic direction. arrows on the pavement. A fire extinguishing .system must be installed above the fryer. Coordinate fire extinguisher requirements with Fire Marshal George Spain at (409) 654-3705. (Ensure that the rear access is not block.ed so that people can completely exit the building.) Coordinate. telephone service, if the. existing facilities are not adequate, with G.T.E. Representative. Laverne Akin at (409)821 ~4723. SUBMIT 4 COMPLETE SETS.OFCONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLANAITACHED AND 3 ADDITIONAL SITE PLANS TO CONTINUE WITH PHASE lIOF THE BUILDING PERMIT PROCESS.