PRomCf REVIEW COMMITTEE REPORT
September 23, 1993
TO: Earl Havel, Garrett Engineering
4444 Carter Creek Pkwy Ste 108, Bryan, TX 77802
Tom Wilson, Wilson Plumbing
106 Walton, College Station,TX 77840
FROM: Project Review. Committe
Jane Kee, CityPlann r
David Pullen, City Engl. ee
Kyle Hawthorne, P & Z epresentative
Others Attending
Natalie Thomas, Planning Technician
George Spain, Fire Inspector
Tony Michalsky, Electrical Operation Coordinator
Samantha Smith, Engineering Assistant
Sabine Kuenzel, Staff Planner
Laverne Akin, GTE Representative
Mike Lavender,TCA Cable Representative
Claude Cunningham, CSISD Representative
SUBJECT: Parl(ing Lot Plan - Wl1sonSubdivision; a 1.00 acre tract zoned C-1 General
COl1lmerciallocated along the south .side of Barron Road approximately
300' west of the intersection of Barron Road and State Highway 6. (93-
419)~
A PresubmissionConference was held Wednesday,. September 22, 1993 to discuss the
above mentioned parking . lot plan. City. Engineer David Pullen moved to approve the
parking lot plan with the following conditions:
CONDITIONS OF APPROVAL:
Distinguish between office space, warehouse, and any areas open to the general
publican the drawing of the existing building in order to determine parking
requirements. Show the square footages and parking required for each in the
parking legend. If this configuration or square footage changes, a revised site
plan will be required to meet current ordinance requirements.
Show zoning of adjacent properties.
Fire 1anes must be. established in the parking lot no further than 150' from the
furthest point of the building.
PRC Report
Wl1son Plumbing
Case #93-419
Page 2
The proposed location of the. dumpster is unacceptable. Relocate the dumpster
so that it is not visible .from any public rights-of-way and screened under current
ordinance requirements. Coordinate details with Sanitation Superintendent Jim
Smith at (409) 764-3660 and Staff Planner Sabine Kuenzel at (409) 764-3570.
Show the water meter size and location.
Attach water demands and sanitary sewer loadings to the site plan.
Redistribute landscaping so that there is reasonable dispersal of vegetation
throughout the site.
The proposed phase line must be at least 20' away from the developed area.
Shared access is required between the 1.00 acre subject property and the C-1
commercial strip to the west. An access easement will be required at the time of
final plat. Coordinate details with Staff Planner Kuenzel at (409) 764-3570.
Resolve the question of the storm water. control area proposed with this
development. Coordinate details with City Engineer David Pullen at (409) 764-
3570.
Staff Planner Kuenzel seconded the motion of approval which passed unopposed (3 - 0).
The following comments were made by the various reviewing agents:
COMMENTS/CONCERNS:
The current parking lot layout should consider possible additions to the site and
problems associated with fire protection coverage. Coordinate details with Fire
Marshal George Spain at (409) 764-3705.
If there. is any outside storage, a revised site plan must be submitted with
proposed screening along Barron Road.
The existing overhead electrical lines. may be required to be buried. Coordinate
requirements with Electrical Operations Coordinator Tony Michalsky at (409)
764-3660.
Provide two. 2" conduits to the .existing building from the Barron Road right-of-
way to terminate on the outside of the building for telephone service. If the
electrical lines are not located underground, telephone service can be served
overhead. Coordinate details with G.T.E. Representative Laverne Al{in at (409)
821-4723.
SUBMIT 3 COPIES OF CONSTRUCTION DOCUMENTS WITH THE RE'VISED
SITE PLAN ATTACHED AND 4 COPIES OF THE REVISED SITE PLAN ONLY
TO CONTINUE WITH PHASE TWO OF THE BUILDING PERMIT PROCESS.