Loading...
HomeMy WebLinkAboutMinutes PROJECI' .REVIEWCOMMITIEE REPORT Apri122, 1993 TO: Larry Wells, . Municipal Development Group 203.Holleman Drive East, College Station, TX 17840 Andrew Bernstein, Bernstein Investments 1800 St James PlaceSte 300, H ,~stQn,TX 77056 I FROM: P~oje.ct Re.view . Commit /'e: J aneKee,. . City. Plan David Pullen.,C,. it.y Emtfner Others Atte,nding: 'l. Natalie. Thomas, . Planning Technician Samantha .~mith, . Engineering... Assistant Tony ... Michalsky, iElectricalOperations .Coordina tor Shirley Volk,Development Coordinator Sabine Kuenzel, ; Staff Planner Gali . Dolev,PlanpingIntern Laverne Akin, GTE Representative Mike Lavender, T.CA Cable . Representative KeanRegister, Lone Star . Gas Representative SUBJECI': 'PARKING LOT PLAN -Post Oak Square; proposed . redevelopment of an existing shopping center locatedalqng.the south side of Harvey Road just 'west of Post Oak Mall. (93-409) The Project Review Committee met on . Wednesday, April 21, 1993 to discuss the above mentioned parking. lot plan. The following . comments were made by the various reviewing agents: WATERlWASTEWATER: Specify that adjusted waterlines are public and that adjusted sanitary sewer liJles are private. Show sanitary sewer service to the ToysR Us building. Submit..construction doculllentsfor the water line. lowering and fire hydrant relocation. FIRE: Coordinate fire lane and hydrant locations with Fire Inspector George Spain at (409) 764-3781. PRC.Report Post Oak Square Case #93-409 Page 2 PLANNING: Suggested that 900 parking be used to provide better circulation in thenewparkhlgarea east .0ftheToysR. Us. Make the. following. additions. to the landscape plan: provide caliper or. gallon sizes. in the legend; and, a note stating, "Any area disturbed during construction, including rights- of-way or adjacent property, shall be seeded> or sodded with perennial turf grass. All areas not otherwise. . built, paved or landscaped .shall be seededor..sodded with perennial turf grass." Replace the existing dumpster pad located in the northwest corner of the site, behind the existing5~994square foot building, with. a screened enclosure. for. three 400 gallon automated. containers. Eachleas~ space included in the existing building along the west side of the property should...havea..90 or 400 gallon automated container.. in the alley.. A...5' . wide scree][l fence should be installed to screen the containers from Highway 30. Provide details for the "curb to be removed to allow for dumpster access" for the proposed. container near Cavender's. . This site should. be screened on three sides to not be visible from Highway 30. (Expressed concern/about the wide turn approach to this dumpster and the steepness of the slope down to the mall parking lot.) ENGINEERING: Coordinate drainage development permit and erosion control plans. with City Engineer David Pullen at (409) 764-3570. G.T.E.: ContactG.T.E.Representative Laverne Akin at (409) 821-4723 prior to any renovations so that all existing service lines can be located prior to construction. LONE STAR GAS: Contact Lone.. Star Gas Representative Kean Register at (409)776-0727 prior to any renovations so that all existing. service lines can be located prior to construction. SUBMIT 4 . COMPLETE SETS.. OF CONSTRUCTION DOCUMENTS ,WITH.. THE. RE'VISED SITE .PLANATTACHEPAND3 . ADDITIONAL SITE PLANS TO CONTINUE WITH PHASE II..... OF THE < BUILDING PERMIT ... PROCESS~ . . SUBMIT . 10 ..COPIE~S OF DEMOLITION ANDGRAI)INGPLANS FOR REVIEW AND APPROVAL PRIC>R TO ISSUANCE OFA DEVELOPMENT PERMIT TO ALLOW ANY SITE WORK. 104" 4 'Il' ... PROJECT.REVIEW......COMMITrEE.....REPORT November. 30,....1993 TO: ~arryWells,. ..MunicipaI . Development.... Grou p 203....Holleman Drive East, College.... Station, TX .77840 Al1drew.........Bernst~in,. ..Bernstein.....lnvestments 1800St JamesPlace..Ste 300, Houston, TX 77056 FROM: Project ..ReviewCOlnmitte~: Sabine.Kuenzel,StaffPlan~er Ver{)uica......Mgrgan,...Assistant...City.. Enginee r CraigHall,P& ZRepresentative Others.... Attendfng: Natalie........Th.ornas, . Planning ..Technician Samantha Smith, Engineering Assistant ..... ......' Tony Michalslty, Electrical.. .OperationsCoordina tor Pete Vanecftl<, Parl(s .Sel1i or ..Planner George .M'cLean,CSISD · Re.presentative SUBJECI': PA,RKINGLOTPLAN..PostOalfSquare .Renovation;proposedamendrnent to the existing sl10pping center, lots 2R, 3R and 4R of block 1 in the Post Oak Square Subdivision to facilitate theproposedT.J. Maxx store including an additional parking area. . (93-409) TheProjectReviewCOOlmittee1l1etoniWednesday, November 24, 1993 to discuss th.e:. above mentionedparl<inglot.rlan.Staff P1.annerKuenzelmoved to approve thepark:ing lot plan with the.. following conditions: Work with, stafton reconfiguring the.<sixparking spaces located.. in the southernmost corner of. the proposed. parking . lot. Work withstaffondetermining. if!lan~~saping.isrequired. in .the proposed parking area. Commissioner. HanexpressedcoIl~ernAf the proposed addition being ..visiblefrom the maHparking lot and if so, it shou~dbe!:adequatelyscreen.ed as was done with the Post Oak.Mall and Toys.R.Usdevelopme1}ts, ,The islands shown in. the protJosed,parkocuglotmustbe raised. Assistant CityEngineetMorganseconde~ t~f!:i~otion Which passed unopposed (3 ~ 0). The following comments.weremade by . the various'~~vie,ving agents: .:.,. PRCReport T.J.Maxx Case #93.409 Page 2 AdrainagedeVeIoPtrient permit!!> required prior to issuance of a building permit. Coordinate.. details with .. Assistant City Engineer Veronica Morgan at (409) 764-3570. Look~tthe possibilitY9f relocating the fire hydrant so thatit is not located in a driving lane.":Since thebuildingwiU be sprinl(lered, try and relocate the fire hydrant into a parking island. The proposed trash .com pactorm ust be screened. Show.theutilitylocations in the immediat~area of the T.J. Maxx addition. Look at the possibility ofrelocating sOrne.bandicap parking spaces so that they are more accessible ..to theproposedT.J.Maxx addition. If the ..existing....transformer. .is.. relocated, . it. will... be. done. at. the....cost..of..the....developer. Provide......l()ad. infof1Ilationand...coordinate ...details with Electrical Operations Manager Tony Michalsky at '.. (409)764-3660. Remove the. highlighted ,area from the Toys.R Us. store to the .proposedT.J. Maxx store. Submit water demands andsanitarysewet loadings to Engineering Assistant Samantha Smith a t (409) 764..3660. Determlnewbat. telephone facilities.. are.. available. and . their termination point. Coordinate telephone req uirementswithG~ T.E.Representative Laverne .. Ak:ina t (409) 821~4723. SUBMIT 4.... COMPLETE SETS OFCONSTItUCTION DOCUMENTS. >WITH..THE 'REVISED SITE.PLANATTI\CEED1\ND3ADDITIONAL...SITE PLANS TO CONTINUE WITH PHASE .'.11.. OF THE... BUILDING .PERMIT .PROCESS.