Loading...
HomeMy WebLinkAboutMiscellaneous q~~L/()'7 lephoneOperations entral Area April 22,1993 Engineering ...Department P. .0. Box 3158 Bryan,.Tx 77805-3158 Roger .D.Ruppel A.I.A., Ruppel Architecture 5103 Aspen Bellaire,TX77401 Dear Mr. Ruppel: SUBJECT: PARKING LOT PLAN - Kolkhorst Exxon; service station to be located at the former Shell location at 425 South Texas Avenue on the northeast corner of University Drive and Texas Avenue Cost estimates for telephone facility relocation alon~Texas Avenue for a proposed drivewasr~quf3sted in the City of College .StatiQn Project Review Committee meeting of March 31, 1993. These estimates include labor and materials required to remove pQleandaerial cables and place a manhole and buried and aerial cables. This \vorkw()uldhavean approximate 90 day construction period. The estimated cost for GTE to rearrange telephone facilities is $23,976.00. This cost would be billable to the developer. Please call me at 409/821.....4723 if you need additional information. Sincerely, Laverne Akin Engineer - OSP I-ILA :djd cc:Ed Hard Transportation Planner City of College Station Veronica... Morgan Assistant...City... Engineer City of College Station . ~ti!(VEOAPR '2 3 \993 A part of GTE Corporation .tl1 '''','' c,. li~<'/ ~~ ^,t\ vu. ~CJ;,~ ~ v ^~~.