HomeMy WebLinkAboutMiscellaneous
q~~L/()'7
lephoneOperations
entral Area
April 22,1993
Engineering ...Department
P. .0. Box 3158
Bryan,.Tx 77805-3158
Roger .D.Ruppel
A.I.A., Ruppel Architecture
5103 Aspen
Bellaire,TX77401
Dear Mr. Ruppel:
SUBJECT: PARKING LOT PLAN - Kolkhorst Exxon; service station to be located at
the former Shell location at 425 South Texas Avenue on the northeast corner of
University Drive and Texas Avenue
Cost estimates for telephone facility relocation alon~Texas Avenue for a
proposed drivewasr~quf3sted in the City of College .StatiQn Project Review
Committee meeting of March 31, 1993. These estimates include labor and materials
required to remove pQleandaerial cables and place a manhole and buried and
aerial cables. This \vorkw()uldhavean approximate 90 day construction period.
The estimated cost for GTE to rearrange telephone facilities is $23,976.00. This
cost would be billable to the developer.
Please call me at 409/821.....4723 if you need additional information.
Sincerely,
Laverne Akin
Engineer - OSP
I-ILA :djd
cc:Ed Hard
Transportation Planner
City of College Station
Veronica... Morgan
Assistant...City... Engineer
City of College Station
. ~ti!(VEOAPR '2 3 \993
A part of GTE Corporation
.tl1
'''','' c,.
li~<'/ ~~ ^,t\
vu. ~CJ;,~ ~ v
^~~.