HomeMy WebLinkAboutMinutes PROJECf REVIEW COMMITTEE REPORT February 1, 1993 TO: Jerry . Etheridge 1504 Saddle . Lane, CollegeStation,TX 77840 Larry Wells, Municipal Development Group 203 Holleman Drive East, College Station, TX 77840 FROM: Project.Review Committee: Jane . Kee, Senior Plann David Pullen, City Engine r Mike Lane, P &Z Comm sioner Others 'Attendillg: Natalie Thomas, Planning Technician Samantha Smith, Engineering Assistant Shirley Volk,DevelopmentCoordinator Tony Michalsky,. Electrical Operations Coordinator Bland Ellen, Fire Marshal Laverne Akin, GTE Representative George.Spain, Fire Inspector Coy Perry, Bl.1ilding Official SUBJECf: PARKING LOT PLAN .. Storage Buildings; to be located on an 0.926 acre tract, lot 17 of block 1 in the Regency Square Subdivision. (93-401) The. Project . Review Committee met on. Wednesday, January 27, 1993 to.discuss the above mentioned parking lot plan. The following comments were made by the various reviewing agents: P &.Z .REPRESENTATIVE: Expressed ..concern. for the need.. of a. trash. receptacle at this. site . primarily because of the nature of the business. Ifareceptacle is Dot available, there may be trash .left elsewhere on the site or on a neighboring site. The Committee agreed to allow . the applicant to operate . without a rece.ptacle . at this time; however,. staff has the discretion to require .a receptacleata.later. date. ENGINEERING: A drainage development permit is required prior to any site work. Coordinate permit details with Project Engineer D.eborah Keating at (409) 764-3570. PRC Report Storage Bldgs Case. ..#93-401 Page..2 FIRE: All fire lanes must ..be marked in accordance with the fire lane ordinance. Coordinate.requiremellts.. with Fire. Inspector George Spain at (409) 764-3781. Expressed concern with the turning radius of the. rear COTner along the southwest property line . with regard to the emergency vehicle maneuverability. Place a no parking sign. at the entrance of the site to prohibit parking in the fire lanes. Fire hydrants must be installed and operable prior to any combustibles being storedon..site. BUILDING: All storagebuildingsimustbe separated bya. two hour fire wall of equal portions. Coordinate details with Building Official Coy Perry at (409) 764-3741. WATERlWASTEWATER: Distinguish between public and private water and sanitary sewer lines and indicate size. Show all utility easements on · the site plan. This site will be. serviced by underground. utilities. The . developer is responsible for paying . the. cost differential between overhead and underground service. The electrical department prefers that service be provided from the back of the building. Utility easements will neeq to be obtail1ed to cover utilities along the west side of the property. . .The electrical department will research to see if an easement was dedicated to .cover the existing utilities along the east. side of the property; if not, an easement will need to be dedicated. Co.ordinate details with Electrical OperationsCo.ordinatorTony Michalsk}r at (409) 764-3660. The existing electrical line located.. ailoI)gHolleman will be removed and placed along the. rear of the property. An)' .lmroposed landscaping. shopld . not interfere with. the proposed.utilitylines. CooEginaterevising the landscaping plan with Mapping. Specialist N~nette Manhart at. (40.9)76.4-3570. ;$ ,1 PRC Report Storage. Bldgs Case .#93-401 Page 2 PLANNING: Correct the driveway dimension along the west property line. Correct the . caliper size on the proposed landscaping to reflect feet and not inches. The landscaping pla,nas>submitted is. acceptable; however, the trees proposed for the . rear and front should be switched to not interfere with the proposed utility lines. along the rear . property line. G.T.E.: Provide two 2" conduits from the building toa public utility easement or right-of- way. Coordinate telephone service requirements. with G.T.E. Representative Laverne Akin at (409) 821-4.723. SUBMIT 4 COPIES OF . COMPLETE CONSTRUCTION DOCUMENTS WITH THE REVISED SITE PLAN ATTACHED AND. 3 ADDITIONAL COPIES OF THE REVISED. SITE PLAN ONLY TO CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS.