HomeMy WebLinkAboutMinutes
PROJECf REVIEW COMMITTEE REPORT
February 1, 1993
TO:
Jerry . Etheridge
1504 Saddle . Lane, CollegeStation,TX 77840
Larry Wells, Municipal Development Group
203 Holleman Drive East, College Station, TX 77840
FROM: Project.Review Committee:
Jane . Kee, Senior Plann
David Pullen, City Engine r
Mike Lane, P &Z Comm sioner
Others 'Attendillg:
Natalie Thomas, Planning Technician
Samantha Smith, Engineering Assistant
Shirley Volk,DevelopmentCoordinator
Tony Michalsky,. Electrical Operations Coordinator
Bland Ellen, Fire Marshal
Laverne Akin, GTE Representative
George.Spain, Fire Inspector
Coy Perry, Bl.1ilding Official
SUBJECf: PARKING LOT PLAN .. Storage Buildings; to be located on an 0.926 acre
tract, lot 17 of block 1 in the Regency Square Subdivision. (93-401)
The. Project . Review Committee met on. Wednesday, January 27, 1993 to.discuss the
above mentioned parking lot plan. The following comments were made by the various
reviewing agents:
P &.Z .REPRESENTATIVE:
Expressed ..concern. for the need.. of a. trash. receptacle at this. site . primarily
because of the nature of the business. Ifareceptacle is Dot available, there may
be trash .left elsewhere on the site or on a neighboring site. The Committee
agreed to allow . the applicant to operate . without a rece.ptacle . at this time;
however,. staff has the discretion to require .a receptacleata.later. date.
ENGINEERING:
A drainage development permit is required prior to any site work. Coordinate
permit details with Project Engineer D.eborah Keating at (409) 764-3570.
PRC Report
Storage Bldgs
Case. ..#93-401
Page..2
FIRE:
All fire lanes must ..be marked in accordance with the fire lane ordinance.
Coordinate.requiremellts.. with Fire. Inspector George Spain at (409) 764-3781.
Expressed concern with the turning radius of the. rear COTner along the southwest
property line . with regard to the emergency vehicle maneuverability. Place a no
parking sign. at the entrance of the site to prohibit parking in the fire lanes.
Fire hydrants must be installed and operable prior to any combustibles being
storedon..site.
BUILDING:
All storagebuildingsimustbe separated bya. two hour fire wall of equal portions.
Coordinate details with Building Official Coy Perry at (409) 764-3741.
WATERlWASTEWATER:
Distinguish between public and private water and sanitary sewer lines and
indicate size.
Show all utility easements on · the site plan.
This site will be. serviced by underground. utilities. The . developer is responsible
for paying . the. cost differential between overhead and underground service. The
electrical department prefers that service be provided from the back of the
building.
Utility easements will neeq to be obtail1ed to cover utilities along the west side of
the property. . .The electrical department will research to see if an easement was
dedicated to .cover the existing utilities along the east. side of the property; if not,
an easement will need to be dedicated. Co.ordinate details with Electrical
OperationsCo.ordinatorTony Michalsk}r at (409) 764-3660.
The existing electrical line located.. ailoI)gHolleman will be removed and placed
along the. rear of the property. An)' .lmroposed landscaping. shopld . not interfere
with. the proposed.utilitylines. CooEginaterevising the landscaping plan with
Mapping. Specialist N~nette Manhart at. (40.9)76.4-3570.
;$ ,1
PRC Report
Storage. Bldgs
Case .#93-401
Page 2
PLANNING:
Correct the driveway dimension along the west property line.
Correct the . caliper size on the proposed landscaping to reflect feet and not
inches. The landscaping pla,nas>submitted is. acceptable; however, the trees
proposed for the . rear and front should be switched to not interfere with the
proposed utility lines. along the rear . property line.
G.T.E.:
Provide two 2" conduits from the building toa public utility easement or right-of-
way. Coordinate telephone service requirements. with G.T.E. Representative
Laverne Akin at (409) 821-4.723.
SUBMIT 4 COPIES OF . COMPLETE CONSTRUCTION DOCUMENTS WITH THE
REVISED SITE PLAN ATTACHED AND. 3 ADDITIONAL COPIES OF THE
REVISED. SITE PLAN ONLY TO CONTINUE WITH PHASE II OF THE
BUILDING PERMIT PROCESS.