HomeMy WebLinkAboutMinutes PROJECf REVIEWCOMMITI'EE REPORT Febru.aryl, 1993 TO: Lonnie M.Breaux,Scott&White. 2401 South 3.1st Street, Temple, TX76508 David Knopp, Scott & White 2401 South 31st Street, Temple,TX 76508 Dennis E. Duff, Page Southerlal1cl Page POBox 2004, Austin, TX 78768 FROM: Project Review ,Cornmittee:/''''" Jan~ Kee, Senio,r Plan~&-A DavId Pullen, CIty EngIn~r) Mike Lane,...P.& Z Com~ioner Others Attending: Natalie Thomas, PlanningTechnician Salpantha Smith, Engineering Assistant Shirley Yolk, Development, Coordinator Tony Michalsky, 'Electrical Operations, Coordinator Bland Ellen, Fire Marshal Laverne Akin, GTE Representative George Spain, Fire Inspector Coy Perry, Building Official SUBJECI': PARKING LOT PLAN -Scott. & White Clinic; to -be located on the s, o,u~hwe~,t .c,o~n, er ...of, ., .D, ni,vexsi!Y-D~..ri,v and the East By Pass along the UnIverSIty DrIve CorrIdor~t(93-~Q~ . . ~-,-,~._. .. The . Project Review Committee met on Wedne.sday, January 21, 1993 to discuss. the above mentioned parking lot plan. The following comments' were made by the various reviewing agents: PLANNING: The. existing driveway entrance to the temporary office buildings must be closed within 60 days after the issuance of a certificate of occupancy for the proposed clini c. The proposed sign to be attached to the retaining wall must meet the sign requirenlents listed In the University. Drive Overlay Corridor in the Zoning Ordinance. BUILDING: Indicatewherehal1dicap parking signs will be located. Coordinate requirements with Building Official Coy Perry at (409) 764-3741. '~(i PR C Report Scott & White Case #93-400 Page 2 FIRE: All fire . lanes must be marked in accordance with the fire lane ordinance. Coordinate requirements with Fire Inspector George Spain at (409)764-3781. There, must ,be at least a 20' all weather, surface drive at the entrance and throughout the complex during construction. Coordinate the requirements for an all weather surface with Assistant to the City Engineer Veronica Morgan at (409) 764-3570. Fire hydrants.mustbe. installed and operable prior to combustibles being stored on, site. Remove the fire hydrant that appears to be located inside the building. The curbing to be located along the .. entrance of the. grasscrete fire department drive should lay down so that fire department trucks >do.not have to jump a raised curb. Coordinate curb details. with Assistant to the City Engineer Veronica Morgan at (4090764-3570. Place a sign at the entrance of the grasscrete fire department drive that states, "Fire Department Use' Only". The turnaround.leg.of the grasscrete.fire. entrance to be located off of University Drive could be. reduced . by 10'. Coordinate · variance proceedings to the turnaround requirements with Building Technician Susan Cole at (409) 764-3570. Sprinkler plans should' be included with the building construction documents. WATER/WASTEWATER: Label the' private sanitary sewer lines and water vault. Submit water meter size and type. Submit minimum, ll1aximumand average daily water and sanitary sewer flows. Show all, public water ,and ' sanitary. sewer lines on the landscape plan. Correct the sizing on the private sanitary sewer line. (Sizing is either 6" or 8") Coordinate a ..l11eeting with Engin~ering .A&sistant Samantha Smith to discuss construction document details at (409) 764-3660. PUBLIC SERVICES: A sep~ratecontainer \\Till be required to be placed next to .the proposed dumpster for medical waste. only. Coordinate service details with Sanitation Superintendent Jim Smith at (409) 764..3690. 'i PRC Report Scott & White Case #93-400 Page 3 ENGINEERING: A drainage . development pe J:1l1it is required prior to any site . work.. Coordinate permit details with Project Engineer Deborah Keating at (409)764-3570. Easements will be. required to. coverall public utilities and appurtenances. Said easements can initially be dedicated through a blanket easement that expires UP()U the filing of an easement dedication plat. Coordinate. requirements with Assistant to the City Engineer Veronica Morgan' at (409).764-3570. The detention ponds near the East ByPass needs to be attractive and vegetation established within 60 days of construction. Submit construction plans for the detention ponds showing the cross-sections, materials, etc. Submit details on the area where the pond connects to the existing culvert. Submit details for outlet structures associated with the ponds. The proposed . pavement system. must. be equivalent to or exceed the traffic support' strength of a residential street pavement. ELECI'RICAL: Submit load data and a letter requestil1gunderground utilities agreeing to pay the cost differential between overhead, and 'underground utilities. Coordinate. service details. and the proposed back..up loop .system with Electrical Operations Coordinator Tony Michalsky at (409) 764-3660. Metering for this site will be on the transformer. G.T.E.: Coordinate telephone service and submit a set a construction documents to G.T.E. .Representative Laverne Akin at (409)821-472.3. Provide two 4"conduits from the' public. utility easement. to. the termination room. TCACABLE: Provide a 2Hconduit from the public utility easement to the termination room. Coordinate service. details with TCACable Repres.entative Mike Lavender at (409)846.. 2044. SUBMIT 4 COPIES' O~.., COMPLETE CONSTRUCTION DOCUMENTS WITH THE REVISED SITE . PLAN ATTACHED AND 3 ADDITIONAL COPIES OF THE REVISED SITE, PLAN,' ONLY TO', CONTINUE WITH PHASE II OF THE BUILDING PERMIT PROCESS.