HomeMy WebLinkAboutMinutesM M
s1oN c~-N~N~~ ~Pa~~r
P~~su~~s
~' Se tember 23, 1993
p
i
TCJ: Earl Havel, Garrett Engineering
4444 Carter Creek Pkwy Ste 148, Bryan, TX 77842
Tom ~"ilson Wilson Plumbing
14~ VValt~~, C~ll~ge Statia , T~ 77844
FRAM: Project ~.evie~v Comitt ~.
Jane kee, City Plan ,er
David Pullen, City Engl ~ r
K, le Hawthorne, P & ~ presentative
Y .
others Attending
Natalie Thomas, Planning.. Technician
George Spain, Fire In~pe~tar
Ton iVlichalsl ,Electrical Qperatian Coordinator
Y ~'
Samantha Smith, Engineering Assistant
Sabine .uenzel, Staff Planner
Laverne Akin,.: GTE Representative
l Mike Lavender, TCA Cable Representative
Claude Cunningham, CSISI~ Representative
'~ T ~~-e~imrna .Plat - W~Isa~ ~Subd~v~~~'~r~; a 1.44 acre tract zoned C-1 General
SU~JEC _ ~'
Commercial located ala~g the south side of Barron Road, ..approximately
34Q' west. of the intersection a~' Baryon Road .:and: State Highway b. (93-
3U9)
Presubmission Conference Was held wednesda , ~e tem~ber 22, 1993 to discuss the
A Y p
above .mentioned relim.inary flat. The following.. comments were made by the various
p
reviewing agents:
'~VATER/wASTE 'CATER: .
" e vicinlt ma to shag the actual. distance from. the intersection of the
_ Revise th y p
State Highway ~ frontage road and Barran Raad.
Staff will obtain a co of the im pct stud from the Engineering Department far
py _ p Y
further review.
PLANNING:.
i
Shand access will be re wired for the 1.44 acre subject property and the C-1
9
commercial stripe to the wesf. An access easement. will be required at the. time of
final plat. Caar~inate details with City Planner Jane I~ee at {449j 764-3574.