HomeMy WebLinkAboutMinutesi
i
I
'~
i
i
j
I
{
i
PRQJEC'T REVZEw C~MaVIITTEE REPQRT
{
993
February 15, 1
l
T4 Myrad Real Estate, Inc.
707 Canterbury Drive,. College. Station, TX 77845
Michael R Mc Clure, Mc Clure Engineering, Inc,
1722 Broadmoor Ste 210, Bryan, TX 77802
FRAM: Project Review Commute
Jane I~ee, .Senior Plan er ~s'~
Veronica Morgan, Asss n to the. City Engineer
Julius Gribou, P & Z C issioner
Others Attending:
Natalie Thomas, Planning Technician
Samantha Srnith, Engineering :Assistant
Tony Michalsky, Electrical Operations Coordinator
i Deborah Keating, Project Engineer ~ Drainage
~ George Spain, Fire Inspector
Coy Perry, Building Official
Dean Register,. Lone Star Gas Representative
Laverne Akin, GTE Representative
- Mike Lavender, TCA Cable Representative
- Claude Cunningham, CSISD Representative
SUBJECT: PRELIMINARY-.PLAT - Elm Crest Subdlv~sran; to be located. southwest
of Brandon Heights Phase TI bounded on the northeast by ~Uelsh Avenue,
on the southeast by Rock Prairie Elementary. drool tract, on .the
southwest by an undeveloped tract {Van Riet) and on the northwest by
Southwood Valley Section 24E. {93-303)
The Pra'ect Review Committee met on Wednesday, February 10, 1993 -to discuss the
~'; above ~nentloned preliminary plat. The following comments: were ...made by the various
reviewing agents:
WATER~W'ASTE WATER:
Address the sanitary: sewer :service to ats 12 and 13 during the final plat stage.
Coordinate :requirements with Engineering Assistant Sarantha Sm%th at (409)
7b4-36b0.
t
PLANfNING:
See the enclosed draft of a thoroughfare :.screening ordinance that. w11 soon be
adopted Eby City Council.
t
r
PRC Report
Elm Crest
Case #93-303
I Pa e 2
_~
ELECTRICAL:
Show ole locations aloe both ides of Welsh Avenue and locate road crossings.
P g -.
Coordinate details with Electrical Operations Coordinator Tony Mlchalsky at .
(409} 764-3660.
Submit a _letter re uestin under round electrical service and agreeing to :pay the
q g g
cost differential between overhead and underground electrical service.
Provide a 15' ublic utili easement alon the west.. side of welsh to allow for
p_ ~'
electrical and telephone erv~ce lines.
Street li htin`' fixtures should be cobra head-type fixtures with steel poles.
g g
FIfRE•
Show the exact location of the fire hydrant that is presently shown in the
.pavement section of Yaupon Bluff.
Provide a tem ora turnaround at the end of Mint Avenue for ..emergency
p ~' -
vehicle access to the ro osed .:fire hydrant located where the pavement section
p: p
ends. If located on adjacent property to the west, the city w111 need something In
writing showing .agreement from adaacent property owner. Coordinate details
with Fire :Inspector George Spain at (4Q9} 764-3781.
ENGINEERING:
Submit somethin in writin stating that the proposed off-site .drainage facility is
- g g ..
agreeable with the adjacent property owner. This facility must be able to
facilitate both developments, platted and .:built completely with the first
development and noted- as a public facility. coordinate details with Project
orah Keatln at 409 7643570.
Engineer Deb g ( }
tae
u d dra n
ve ro n
d bo
~I Coordinate a m~etin with staff to discuss the ro ose a
- , , . g p _p g g
facilities error to Monday, February 22, 1993.
~i;
Sidewalks are re aired alon both sides of Mint Avenue. No sidewalks will be
-- q g
re aired on the cal-de-sacs...
q
G.T.E..
..Coordinate tele hone service with G.T.P. Representative.: Laverne Akin at (409}
p
821-4723.
LONE STAR GAS:
' s tative Don
w t one Star. Gas Re re en
o t ihL
u
ce an
I~~ - oo dlnate as serve d leev~ i~
C _r g s y p
Fazzno at (409) 776,-0627.
PR~JE~I' R~'VIEW ~ONJ~MITTEE REPCJRT
March 10,1993
T0: Myrad Real Estate., Inc.
707 Canterbury Drive,. College Station, TX 77845
Michael R Mc Clure, Mc Clure .Engineering, Inc.
-1722 ~roa~moor Ste 2.10,. Bryan, T~ 778Q2
FRAM: Project Review Committee:...
f~
Ed Hard, Transportation Planr'er,#f~,, '
Veronica Mor an, Assistant to th 'ty Engineer
g ,
Charles Smith, P &~ Z Commisslo
Others. Attending.:
Natalie Thomas, Planning .Technician
. Samantha Smith, Engineering Assistant
Deborah Keating,. Project Engineer -Drainage
Brad Clark, Fire Inspector
Coy Peery, Building Official
Laverne Akin, GTE Representative
SUBJECT: PRELIMINARY PLAT - Elm Crest Subdlvrslon; :(revised plat -resulting
from P & Z discussions on Marsh. 4, 1993::pertaining to Mint Avenue) to
be located southwest of Brandon Heights Phase II, bounded on .the
northeast b Welsh Avenue, on the .southeast by Rack Prairie Elementary
Y
school. tract, an the southwest by an undeveloped tract (Vah Rlet) and on
the northwest by Southwood Valley Section 24E. (93-303)
The Fro'ect Review Committee met on Wednesday, March 10, 1993 discuss the above
mentioned revised prel~mina~y plat. The following comments. were made by the various
reviewing agents:.
WATER,IV~'ASTE WATER:
Correct the -minor discre antes relative to the off-site public utility. easements
..._
located ~n Southwood Valley sections 24E and 24F. Coordinate requirements
with Engineering Assistant Samantha Smith:. at (40~) 764-3:660.
ENGINEERING:
.Drama e details will be addressed. at the time o f final plat... Coordinate details
_. g
with Project Engineer Deborah :Keating; at (409} 764-3570.
,~ r
PRC Report
Elm Crest
Case #93-303
Page Z
N
it
1~
FT ~ r~~ ~ ~ T
irf~\/ 1 Z1J.~L 1.i1.
i
ii Coordinate unlit la out with Electrical Q erations Coordinator Tony Michalsky
~, ~ Y Y p
~ at (409) 7~4~366~.
P & Z REPR~.SENTATIV'E:
Ex ressed cahcern of the namin of I Cove with.. respect to its .....alignment .with
p g vy
Westchester avenue. Ensure th~.t this: is acceptable especially with respect to the
911 emer enc s tem.
~ _y y
,,
1
~~ Cr.T.E.
_____r
~,
'~ At the time of finale lad additional easements will be needed along .Mint. Avenue,
_. p
dots 1 and 31 along Welsh Avenue between lots 27 and 29; along he rear of dots
! 10 11 12 15 1G and 17• and aloe Sunflower Trail, lots; 23 .Nand -24. Coordinate
~ ~ y ~ ~ ~ f
tele hone service with G.T.E. Representative Laverne Akin:. at (409) 821-4723.
p
sure that, the ~xistin unlit easements are not .obstructed and useable.
As g y
.-~
~~
If electrical and G.T.Q. are to share the shame trench for utility placement,
Tease rovde an electrical layout as soon as one is available.
p p
~; If ..conduit placement is necessary far G.T.E. facilities, Q.T.E. will provide the
conduits however it will be the owners. expense;,to. have the. conduit placed.
~a
'' Q C PIES GF THE REVISED ~~ PRELIMINARY
SUBMIT 1 REPRODUCIBLE AND 1 (~
j PLAT BY FRIDAY, .:MARCH 12, 1993 TO BE INCLUDED IN THE PLAle1NING
~' AND ZONING CC~MMZSSI4N .PACKETS FQR THE MEETING 4F THURSDAY,
MARCH 18, 1993.:
,:
~:
.~
~~
i ,
,,
,:;
~~
~~
~j
~,~
A I~CEM N0.5: ` Consideration of a relimin lat for the Elm ..Crest Subdivision located .along
AGEND P ~ P
Welsh north of Rock Prairie Elementary. (93-303}
Senior Planner Kee :resented the staff re ort and recommended approval with. the presubmission
p p
comments, specifically:
address sanitary sewer service to lots 12 and 13;
- propose thoroughfare screening along 'Welsh;
-- provide additional easement along Welsh;
-- rovide a temporary turnaround at the end of Mint. - If the: turnaround is off-site,
p
indicate:- adj aeent property owner... agreement .and easement;
•- submit evidence that the off-site drainage .facility is agreed to by the property owner;
sidewalks are .required along both sides of Mint; .and,
coordinate with Rock Prairie Estates.
Senior. Planner Kee stated that :this. preliminary plat layout proposes a collector providing access from
Welsh Street west o the area .planned as Rock Prairie Estatesl. It .would eventually ..:connect to Rock
Prairie Road. This ayout does not: match the existing approved master p an for. Rock Prairie Estates to
the .west.. However, Steve Arden (representing the Rock Prairie Estates development) has indicated .that
thin. alignment.. will work for the development. The developer will submit revisions: to the master plan that
will address this new alignment.
Dan Bensimon of M rad Real Estate, Inc. informed the :Commission that the temporary turnaround
y
required. at the Proi ect Review Committee meeting rs not desired. If forced to provide the turnaround,
one lot with fronta e alon 1Vlint Avenue ~?vill have to be eliminated .thus not making it economically
g, . ~ .
feasible for the...rema~nmg three lots.:: The turnaround cannot be provided on the adjacent property due to
a lar e rou in of trees that the developer; does not want removed. Mr. Bensimon ..stated that Mint
g g p g
Avenue will be a 39' pavement section that .would allow trucks- to angle and back. up in order to turn
around. Vince driveways are installed for the. lots fronting. Mint Avenue,. the trucks cane use the driveways
to turnaround. Mr. Bensimon stated that it is their practice to provide thoroughfare screening; however,
the ro osed ordinance is not yet m effect and the developer should have the option on the :type of
p,p
screening.. The. proposed ordinance does not address long term maintenance and there will probably be
man changes before the ordinance is actually adapted. Mr. Bensimon stated that Mint Avenue could be
y
left off of `this plat; entirely_-until a later date. ~Jnce Rock Prairie Estates installs their portion of Mint
Avenue, the remainder could be installed.
Senior Planner Iiee read. from section. 8-G.5 of the Subdivision Regulations pertaining to dead end streets
which states, "Dead end- streets ::.shall be prohibited except short stubs to permit extension... Temporary
turnarounds may be rewired". At the time Rock Prairie Estates develops, Mint Avenue will be extended.
The. Project Review Committee statement pertaining to thoroughfare screening is no a requirement for
-the .developer to comply with the proposed, .ordinance. Staff presented the developer with a copy of the
proposed ordinance for their information and requested that they show. what .they. are actually :.proposing
as far as .screening.. Senior `Planner Kee stated that she could not support the proposal.. of leaving Mint
Avenue off of this plat. The city would be placing the burden of installing Mint Avenue to the four lots
than .remain..
Commissioner Crrbou moved to recommend approval of the preliminary plat of Elm Crest .with staff
recommendations.
After discussion Commissioner Gribou withdrew his original motion :and moved to ...table the preliminary.
lat to allow the applicant and staff time to investigate alternatives to the temporary turnaround.
p
Commissioner f,ane seconded thee: motion which passed unopposed {4 - 1 - 0 ; Commissioner Marlon
abstained dne to a conflict of interest.