Loading...
HomeMy WebLinkAboutMiscellaneous_ _ :_ _ __ INC. McC(~RD ENGINEERING 7607 East~a~k Drive, Su€#e 102,: P.~, Box 10047 r ~ - Coilege S#ation, 'texas l?842 (403) 764-8356 Fex X409) 764-9644 April 1, 1993 Mr. Ray Havens Electric Transmission & Distribution Superintendent City of College Station P.o: Box 9960 College Station, Texas 77842: RE: Edelweiss Subdivision (Phase Two & Three} Revised Electric. Service Dear Ray: In accordance with our request, we have prepared and are enclosing herewith for your Y review and use one -1 co of an Electrical La out for the proposed Phase .Two & Three of O Py Y the Edelweiss Subdivision Development on Arnold Road. A diskette was~~enclosed with the Phase One letter to illustrate the proposed electric and street lighting layouts in electronic form .for your City's use. Shown on the enclosed electric la out map for thin subdivision are proposed electric y distribution s stem. and service additions to provide electric service to the 66 ots included. in y this single-family residential development. An underground electric service layout has .been ro osed to suppl electric service to this., development, in accordance with the request of .the. pP y :developer. , In compliance with the standard policy of your City pertaining to the extension of underground electric service to residential single-family subdivisions,- a~ontribution-in-aid of construction of $4.00 per front foot of lot was computed, less your: City's standard allowance for the proposed installation of electrical conduit by the developer, should be collected... This contribution. will .offset the additional costs your City will incur in installing an underground electric. distribution .system in lieu of the normal more economical overhead service design. For this proposed development, we compute an estimate of the :applicable contribution-in-aid of construction to be as follows: Total Front Footage. Billing - 2, 643. ft. ~ $4.00/ft. _ $10, 572.00 Allowance for ..Primary Conduit ,.Runs Per Linear Foot of Conduit Installed) - 1,620 ft. ~ $1.60/ft. -_ ($2,592.00) ( Allowance for Spare Conduit Runs (Per Linear Foot of Conduit Installed) - 1,620 ft. ~ $0.35/ft. _ ($567.00) Allowance. for, Service Stubouts = bb stubouts ~ $28.00 = ~1848.00.~ Total Contribution-In-Aid of Construction = $5,565.00 AGENDA ITEM COVER SHEET