McC(~RD ENGINEERING
7607 East~a~k Drive, Su€#e 102,: P.~, Box 10047
r
~ - Coilege S#ation, 'texas l?842 (403) 764-8356
Fex X409) 764-9644
April 1, 1993
Mr. Ray Havens
Electric Transmission &
Distribution Superintendent
City of College Station
P.o: Box 9960
College Station, Texas 77842:
RE: Edelweiss Subdivision (Phase Two & Three} Revised Electric. Service
Dear Ray:
In accordance with our request, we have prepared and are enclosing herewith for your
Y
review and use one -1 co of an Electrical La out for the proposed Phase .Two & Three of
O Py Y
the Edelweiss Subdivision Development on Arnold Road. A diskette was~~enclosed with the
Phase One letter to illustrate the proposed electric and street lighting layouts in electronic form
.for your City's use.
Shown on the enclosed electric la out map for thin subdivision are proposed electric
y
distribution s stem. and service additions to provide electric service to the 66 ots included. in
y
this single-family residential development. An underground electric service layout has .been
ro osed to suppl electric service to this., development, in accordance with the request of .the.
pP y
:developer. ,
In compliance with the standard policy of your City pertaining to the extension of
underground electric service to residential single-family subdivisions,- a~ontribution-in-aid of
construction of $4.00 per front foot of lot was computed, less your: City's standard allowance
for the proposed installation of electrical conduit by the developer, should be collected... This
contribution. will .offset the additional costs your City will incur in installing an underground
electric. distribution .system in lieu of the normal more economical overhead service design.
For this proposed development, we compute an estimate of the :applicable contribution-in-aid
of construction to be as follows:
Total Front Footage. Billing - 2, 643. ft. ~ $4.00/ft. _ $10, 572.00
Allowance for ..Primary Conduit ,.Runs
Per Linear Foot of Conduit Installed) - 1,620 ft. ~ $1.60/ft. -_ ($2,592.00)
(
Allowance for Spare Conduit Runs
(Per Linear Foot of Conduit Installed) - 1,620 ft. ~ $0.35/ft. _ ($567.00)
Allowance. for, Service Stubouts = bb stubouts ~ $28.00 = ~1848.00.~
Total Contribution-In-Aid of Construction = $5,565.00
AGENDA ITEM COVER SHEET