HomeMy WebLinkAboutMinutesPROJECT REVIEW ~GNJ~VIITTEE REPORT
March 4,1993
T4: Begonia C~rparation
19x1 San Jacinto, Houston, TX 7702
Braza land Realty, Steve .Arden
41:03 Texas, Bryan, TX 77802
Michael R. Mc Chure, Mc Clure. Engineering,. Inc.
1722 Broadmoor Ste 21a, Bryan,: TX 77842
FROM: Project Review. Committee:
Jane Kee, .Senior Planner
David Pullen, City Engineer.
Others Attending:
Natalie Thomas, Planning Tec ' 1
Samantha Smith, Engineering As ' nt
George Spain, Fire Inspector
Pete Vanecek, Parks Senior Planner
Shirley Volk, Development Coordinator
Laverne Akin, GTE Representative
Mike Lavender, TCA Cable Representative
SUBJECT:, PRELIMINARY PLAT - EdelWelss Estates Phase II aid III;
a raximatel 24.06... acres :divided into b6 single. family:. lots generally
pp . Y
located adjacent to Edelweiss Phase I to the northwest, bounded by
Victoria Road to the southwes and Schaffer Road to the northeast. (93-
3Q2
The Pro'ect Review Committee met on Wednesday, March 3, .1993 -to discuss the above
J
mentioned preliminary plat.. The following comments were made by the various
reviewing agents:
ENGINEERING:
Submit information pertaining. to the proposed GTE facilities to be located
behind lot 27 of black 9 in phase 3 of the proposed drainage and public utility
right-of-way. Ensure than the proposed facilities will not interfere with the
operations of the drainage .::.right-of-way. Coordinate details with City E~Zgneer
David Pullen at (409) 764-3570.
At the time of final plat, submit a drainage and grading. plan for the .lots generally
located at the north end of the Brussels Drive cul-de-sac.
a
.
c
1'RC Report
EdelWelss II ~ L~.L
Case #93-3~2
Wage Z
PLANNING:
A variance is needed to the cul-de-sac length of Brussels Drive.
C1ari the sidewalk note with res ect to Aster and Brussels:. Drive cul-de-sacs and
~' p
include that sidewalks w111 be placed along both sides of Vlctorra Avenue.
Indicate the city limits line...
Reference phase II and phase III in the title block for. clarification.
ELECTRICAL:
i
I Submit a letter re uestn under round electrical service and :agreeing. to pay the
~.. 9 g g .
cost differential between overhead and underground electrical service...
Coordinate :street Ii htih re urements with Electrical Operations Coordinator,
_ g g .~
Tony Michalsky at (4:09) 764-3660.
G.T.E.:
G.T.E. will rovide the conduit for underground telephone;however, it will be at
p,
the developer s f owner s expense to place the -conduit. Coordinate details and
service layout with G.T.E. Representative Laverne Akin at :.(409) 821-4723.
e sure that the ra Osed drama e and ublc utili ri ht-af-wa is useable.
_ Mak p p g p tY g, Y
Mike Mc Clure to work with David Pullen to satisfy a question. of the .drainage.
and ro osed GTE switch site. _ Questions can be directed to Gary Banta, Right-
p
of-~Vay Engineer with GTE. at {409) 821-479L
_ Provide an electrical layout to Ms. Akin as soon as one is available so that the
two utility companies can coordinate placement of utilities in the same trench..
LANE STAR GAS:
Coordinate gas service .with Lone Star Gas Representative Dan. Fazzino _at (409}
,; 776-0627.
TCA .CABLE:.
Coordinate cable service with TCA Cable Representative Mike Lavender at :(409)
846-2044...
SUBMIT 1 REPRODUCIBLE AND 10 COPIES OF THE REVISED. PRELIMINARY
PLAT BY FRIDAY, MARCH 12, 1993 TO BE INCLUDED IN THE PLANNING
AND ZONING COMMISSION P~.CETS FOR:- THE:. MEETING OF THURSDAY,
MARCH 18, 1993.