Loading...
HomeMy WebLinkAboutStaff ReportSTAFF REPORT Case Na. ~3-3ao Request: Master Plan and Master Preliminary Plat cif Pebble Creek Business Centre. App.~icant; City cif College Station PHYSICAL FEATU~.ES Location; Approximately 2540' scauth of the intersection ~f Greens Prairie and SH G °, Area: _1~9.~ acres ZONING AND LAND CJSE Subject Tract: M-1 P1~.nned Industrial Na~•th; C-1, A-P A-~ across Spearman East: R-1 Single Family, developing Pebble Creek South: Outside City '!hest: Boutld ~y SH 6 Pro~-osed Use: Business Park ~; COMPREHENS.IVE'PZAN .:.Land Use Plan, Ret7ectec~ as Industrial Thorau~hfa~+e Plan; Two miner arterials ire reflected to eventually connect ~ SH 6 to ~ocl~ Prairie and Greens ~~Praire res ective ~ e ~I ~ p ly Sp arman acts as cane arterial and wzll hound the Business Park on the north to MZrsh and will-.then be offset to eventual) tie to the Pe>ahle Creek Subdivision. The other arterial will ~' ~ ;. ~e tc~ thee-south of the Busyness Park as w~:s discussed during the Master Plan of Pek~~le Creek Subdivision, Development Pa~icies No conflict. Staff is working with e~nsultants and adjacent developer to provide sidewalks and bikeways: connecting open spaces in the Business Park with the adjacent residential area. E ENGINEERING Water: water is .provided:: to the s% e through an 1~" waterline along Marsh Boulevard. Sewer: Sewer is provided tca the site through a l~" pipe.. at .the southeast corner. The 0.5 MAD Lick Creek wastewater Treatment Plant will serve this area. D~•ana~~; larain~ge %n the area is contained in the interior of the site within the ~~ chain lakes that will be developed. ~' Flaod Plain::Flc~odplain is located along the interior of the site inthe-common r arels. Proposed Public Improvement;[ Improvements incline the street system, water and sanitary sewer systems to serve all lots and drain~:ge improvements Tong the cc~tnmon area... Easement Dedications; As shown on the plat. Sidewalks: Sidewalks will be lca~ated Tong all streets within a pedestrian and landscape easement and interior along thelakes. . ~. 4 i IMPAC'~ STUDIES Water & SeweY• The impact study on the water system recommended the following: The 18" main along Marsh Boulevard shou~ d be extended through the site Replace the existing water line ak~.n~ SH6 with an 8" line acrass the frontage of the Business Centre With these ir~prc~~em~nts, the Business Centre does riot adversely a f fect the water distrlbutian syste~ in the area, The impact study,..for the sewer shows that the Business Centre will flaw into the existing 12" line ~t the southeast corner of the property. This line has thee.. capacity to service the buildout of the Business Centre however the Lick Creek Wastewater Treatment Plant will have to be expanded, as Phase ~ develops. Traffic; The TIA indicates that the street system proposed in the Business Centre can accommodate the projected traffic. The study did, however, express concern for the l~.rgely undefined arterial street system tc~ :accommodate future development of the southern. part of Brazes County and Cc~lle~e Station. It noted that the SH6/GreensPrairie Rd. interchange could became congested if the pebble Creek Suhdivisic~n and Business Park fully develop and further development of the external roadway system is nc~t in place. The study also noted a potential problem if the frontage roads are converted to one-wa . ~ ~ oper~.tlon before a grade separation is provided at the new east-west arterial. This would make Marsh/Spearman the: main entrance to the park Ind the planned. major entrance on the front7ge road the primary .exit from the park. Drainage; The Business Centre.-site area will drain into the 7 retention/detention ponds located in the internal cc:~mmc~n area. These ponds will function to control the 100 year storm event sca that there is nc7 increased runoffleavng this site area. NOT~FI~AT~QN: ~, Legal Notice Publicaton~s~; Advertised Cammi sion Hearir~~ Dates): 2-1.8-93 Advertised: Council Hearing Dates. 3-1893 Number of Notices Mailed tc~ Property;Qwners within 200 Kane STAFF COMMENTS / ~EC:OMNIENDATI~NS .. The staff reviewed this mister plan and prelim.nary. plat on 2-~-93 and recommends approval with presubmission report comments and recommendations from the im act p stud es. --