Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Case No.: Request: Applicant: 93..216 Final Plat (Resubdivision) -Shenendoah Phase One A.P. Boegner & First American Bank PHYSICAL FEATURES Location: Located in ShenendoahPhase One, bounded by Southern Plantation Drive to the south, State Highway No.6 to the east and.Block 1 to the west. Area: 2.131 acres No. Lots: 2 lots ZONING AND LAND USE Subject Tract: North: East: South: West: Proposed Use: C-3, Developed as Charles King H.orticulture and Undeveloped C-1, Undeveloped C-1, Desert Hills C-N , Undeveloped, Vacant PUD,:Developed as Low Density Residential City of College Station .Fire Station #3 COMPREHENSIVE PLAN LandUse/ThotoughfarePlan: Ate a is reflected as low density residential, with no collectors or. arterialsthrou.gh the. property as shown on the Thoroughfare Plan. Parkland Dedicatiol1:N/A ENGINEERING Water: Water is provided to the area through a 24" waterline along the State Highway 6 Frontage Road. Sewer:Seweris provided to the area through. an 8" sewer line along the State Highway 6 Frontage. Roact. Streets: This plat is bound on the east by the State Highway 6 Frontage Road, on the south by Southern Plantation Drive, and on the west bya 20 foot alley. Flood Plain: None Oversize Request:. None Easement Dedications: As shown on the plat. Sidewalks: N/A NOTIFICATION: Legal Notice Publication(s): Advertised. Commission Hearing Date(s): 6/17/93 Advertised Council Hearing Dates: 7/8/93 STAFF COMMENTS/RECOMMENDATIONS Staff reviewed thisplatataPresubmission Conference on June 9, 1993. Shared access will be researched anddiscussedatthetime of site plan review. Site.plaI1must COme before the Planning and Zoning Commission for final approval. Staff recommends approval.