HomeMy WebLinkAboutStaff Report
STAFF REPORT
Case No.:
Request:
Applicant:
93..216
Final Plat (Resubdivision) -Shenendoah Phase One
A.P. Boegner & First American Bank
PHYSICAL FEATURES
Location: Located in ShenendoahPhase One, bounded by Southern Plantation Drive to
the south, State Highway No.6 to the east and.Block 1 to the west.
Area: 2.131 acres
No. Lots: 2 lots
ZONING AND LAND USE
Subject Tract:
North:
East:
South:
West:
Proposed Use:
C-3, Developed as Charles King H.orticulture and Undeveloped
C-1, Undeveloped
C-1, Desert Hills
C-N , Undeveloped, Vacant
PUD,:Developed as Low Density Residential
City of College Station .Fire Station #3
COMPREHENSIVE PLAN
LandUse/ThotoughfarePlan: Ate a is reflected as low density residential, with no
collectors or. arterialsthrou.gh the. property as shown on the Thoroughfare Plan.
Parkland Dedicatiol1:N/A
ENGINEERING
Water: Water is provided to the area through a 24" waterline along the State Highway 6
Frontage Road.
Sewer:Seweris provided to the area through. an 8" sewer line along the State Highway 6
Frontage. Roact.
Streets: This plat is bound on the east by the State Highway 6 Frontage Road, on the south
by Southern Plantation Drive, and on the west bya 20 foot alley.
Flood Plain: None
Oversize Request:. None
Easement Dedications: As shown on the plat.
Sidewalks: N/A
NOTIFICATION:
Legal Notice Publication(s):
Advertised. Commission Hearing Date(s): 6/17/93
Advertised Council Hearing Dates: 7/8/93
STAFF COMMENTS/RECOMMENDATIONS
Staff reviewed thisplatataPresubmission Conference on June 9, 1993. Shared access will be
researched anddiscussedatthetime of site plan review. Site.plaI1must COme before the Planning
and Zoning Commission for final approval. Staff recommends approval.