HomeMy WebLinkAboutMinutes
Draft
P&Z Minutes
June 17, 1993
Page 4
AGENDA ITEM NO.S:
Consideration of a . final plat for the .Oakbrook Valley Subdivision. (93-214)
Assistant to the City Engineer . Morgan presented the staff report and recommended approval of the final pIa t
as presented. The final plat conforms .to the approved preliminary plat. The area is reflected as medium
density residential on the land use plan, with. no collectors or arterials through the property as shown on the
Thoroughfare Plan. Due to the size of this development, the applicant will be required to pay fees in lieu of
parkland dedication. Fees are established at $225 per unit or a total of $8,325., These . fees have not yet been
paid. .Sioewalkswill be requiredalongboth:Heatherwood Lane and Deacon Drive., Staff reviewed this plat
at the Presubmission Conference on May 19, 1993. Staff has . issued an administrative decision regarding the
size of the drainage easement necessary for. the detention pond at the rear of. lots 10, 23 and 24. . In that
decision, the proposed 60' width is sufficient.
Commissioner Hall. moved to recommend approval of the final plat of the ...Oakbrook Valley.Subdivision with
staff recommendations. Commissioner. Herring. seconded the motion . which passed unopposed (5- 0).
V<GENDA ITEM NO. 6: Consideration. of a final plat for the Pebble Creek Phase 2AS~bcJ.ivision. (93-
215)
Assistant to the City Engineer Morgan presented the staff report and recommended approval of the final plat
with the Project Review.. Committee recommendations. The area is reflected. as low density:residential on the
land use plan. . with . . no collectors or . arterials through the property as shown on the ~h()rollgl,:1fare plan.
Sidewalks are being provided along Stonebriar Circle.
Commissioner .Gribou moved to recommend approval of the final plato! the Pebble .Creek Phase 2A
Subdivision with staff recommendations. Commissioner Herring seconded the. motion which ,passed unopposed
(5 .. 0).
AGENDA ITEM NO.7:
(93-215)
Consideration of a final plat for the Shenandoah Phase 1 Subdivision, Block A
Assistant to the City Engineer Morgan presented the staff report and recommended approval. Staff reviewed
this plat at a PresubmissionConferenceon June 9, 1993. Shared access will be researcheq:ancJ. discussed at
the time of site plan review. The site plan must come before the Planning and Zoning 'Com.mission for final
approval.
Commissioner Herring moved. to recommend approval of the final plat for the Shenandoah Phase I
Subdivision,. Block A with staff recommendations. Commissioner Gribou seconded the . motion which passed
unopposed (5 - 0).