HomeMy WebLinkAboutMinutes,. , -
~`
PRCIJECT RE'VZEw - CC7NJ[MI'TTEE REPORT
May 19, 1.993
TC~ Steve Arden, Brazosland Realty.
4103 South Texas Avenue, Ste 1..00, $ryan, TX 7782
Mike McClure, McClure:.. Engineering
1722 Broadmoor Ste 210, Bryan; TX 77$02.
FROM: Project Review Committee:
Sabine Kuenzel, Staff Planne
David Pullen, City Engineer..
Others Attending:
Natalie Thomas, Planning Technician
Veronica Morgan, Assistant to the City Engineer
Samantha- Smith, Engineering Assistant
George Spain, Fire Inspector
Shirley Volk, Development Coordinator
Gali Dolev, Planning Intern
Laverne Akin, GTE Representative
Claude Cunningham, CSISD -Representative
StJBJECT~ FINAL FLAT - Edeh~~lss Esta es .Phase II; approximately 9.856 acres divided
rota 33 single family lots bounded by Edelweiss Estates Phase I to .the
northwest, Schaffer Road to the :.southeast and he undeveloped Van Riet
property to the northwest and southwest. (93-212)
A Presubmisson :Conference was held Wednesday, May 19, 1993 to discuss the above
mentioned final plat. The Project Review` Committee made the following. comments:
'V~'ATER,/wASTE wATER~
'~ Suggested the relocation of the proposed water and sanitary sewer lines to be along
Schaffer Road instead of between lots 8 and 9 of block: 7 Coordinate details with
Engineering: Assistant Samantha Smith -at (409) 764-3660. (NOTE: If the tming..of t1~e
Gr~:ham Road sewer line is such that it is not built before this project, a participation
...between.. the: developer and the City may:. be needed o provide a temporary. holding
tank, such as an oversized manhole to be pumped on a regular basis.)