Loading...
HomeMy WebLinkAboutMinutes,. , - ~` PRCIJECT RE'VZEw - CC7NJ[MI'TTEE REPORT May 19, 1.993 TC~ Steve Arden, Brazosland Realty. 4103 South Texas Avenue, Ste 1..00, $ryan, TX 7782 Mike McClure, McClure:.. Engineering 1722 Broadmoor Ste 210, Bryan; TX 77$02. FROM: Project Review Committee: Sabine Kuenzel, Staff Planne David Pullen, City Engineer.. Others Attending: Natalie Thomas, Planning Technician Veronica Morgan, Assistant to the City Engineer Samantha- Smith, Engineering Assistant George Spain, Fire Inspector Shirley Volk, Development Coordinator Gali Dolev, Planning Intern Laverne Akin, GTE Representative Claude Cunningham, CSISD -Representative StJBJECT~ FINAL FLAT - Edeh~~lss Esta es .Phase II; approximately 9.856 acres divided rota 33 single family lots bounded by Edelweiss Estates Phase I to .the northwest, Schaffer Road to the :.southeast and he undeveloped Van Riet property to the northwest and southwest. (93-212) A Presubmisson :Conference was held Wednesday, May 19, 1993 to discuss the above mentioned final plat. The Project Review` Committee made the following. comments: 'V~'ATER,/wASTE wATER~ '~ Suggested the relocation of the proposed water and sanitary sewer lines to be along Schaffer Road instead of between lots 8 and 9 of block: 7 Coordinate details with Engineering: Assistant Samantha Smith -at (409) 764-3660. (NOTE: If the tming..of t1~e Gr~:ham Road sewer line is such that it is not built before this project, a participation ...between.. the: developer and the City may:. be needed o provide a temporary. holding tank, such as an oversized manhole to be pumped on a regular basis.)