HomeMy WebLinkAboutMiscellaneousRECEIV~O MAY' o
Q C~iVE~ '. 1 p
I... - ..
MUNICIPAL DEVELOPMENT GROUP o ~ o s e
~C~~~C~G~ 0[~ ~~QC~~~ ~~~~L~
P®. fox 9249
20:3 Holleman Drive East
WE ARE SENDING YOU Attached ^ Under .separate cover via the following. items:.
..,.,
Shop drawings ^ Prints ^ Plans ' ^ 'Samples ~ Specifications
~~
^ Copy of letter ` ^ Change order ^
COPIES DATE No. DESCRIPTI®N
THESE ARE TRANSMITTED as checked belowe
For approval ^ Approved as submitted ^ Resubmit copies for apprcwal
For your use ^ Approved as noted ^ Submit copies for distribution
~-~ ^ As requested ^ Returned for corrections ^ Return corrected prints
D For review and comment ^
i
D
FOR RIDS DUE
19~ ^ .PRINTS RETURNED AF~'ER LOAN TO US
REMARKS
-,.
,~
i ~~~
i
~ Y
,.
.
~
,, ,. i.
,, ._..__
t Iw
'
'1 ^.--,- ~ ~
`~
COPY TO ..r...~.~..__..
SIGNED;
~t eeac~~s~r~s ire ~®t ~s ~~t~dD ~e~ary ~®t~>sy ~,s at ~~ce.
i
i
i
~~
'i
June 9,1993
Pier nne Grou
p
~i ,,
Attn; Elrv~a Walker
~, Dear Ms. Walker
Mr. Andy Bernstein, with ~er~stein Investments, has asked me to write you in regard to the
' City's request. for a sidewalk along Harvey Road as a part of the redevelopment of Post Oak
Square. - As part of the Project Review conference held on this project, he City stated,
".Sidewalks are required along Harvey Road. Suggest that the applicant discuss with the Fier 1
property owner, the installation of'a sidewalk a ong the Pier 1 frontage in conjunction with this
developmentl" we requested the latter in order to provide a continuous sidewalk for patrons and
pedestrians in front of the'Post yak Square.development.
I If you have any questions, please do nit hesitate to call me. I can be reached between 8 a.m. and
5 p.m at X409) 764-3.570. -Thank you for your consideration.
i
i
Sincerely,
'~ Veronica J.~. Morgan
Asst. to the City Engineer
cc; Shirley Volk, Development Caordlnator
Andy Bernstein, Bernstein Investments
Toys R Us file
,~,
This is a re lat of the Post Oak. S uare Subdivision, which increases the number of
p _q
total lots. in the subdivision. from 2 to 4. It is being replatted o accomodate a large
develo ment on lot 3R. A PRC was held at the end of March wherein staff explained
p
that rovision of ublic utilities is a re uirement of the subdivision. regulations and if tl~e
P p q
a licant desired to maintain the rivate services to the individual lots, he would need to
pp p
seek a variance and enter into a develo merit and hold harmless agreements with the City.
~ p
~ for those .lots with rivate sewer service. These agreements are necessitated by concerns
p
with.the ` rovision of rivate sanitar sewer service to the new lots. Staff also is
p p Y
k concerned with the ossible relocation of existing internal utilities. that must remain in
p
service for~other tenants.
,~
slide #1-
k
,,
~;
' ideashowin the~area that will be demolished with the first base and the
Th1s 1s a sl g p
~ avement area that will be cut down to provide a better view of the back area of the
p
center from SH30. This avement cut will cause a fire line that currently servies the
p
N
property. to be relocated.
n
G
H~
r
G g g
In addition there was discussion re ardin traffic circulation from this site to the Post
,;
Oak Mall ro ert .Staff is recommending: that cross access between this .site and Post
P p y
Oak Mall be a condition of approval of this plat. The applicant is agreeable to this
condition, however, he foresees that the Mall tenants will not be quite as agreeable and
will deny cross access:
slide #2,_#3, #4
Staff recommends approval of the final plat with the following conditions:
~~
V ,
~ ~ 5ldewalks be constructed alon Lot 2R and 3R fronta e along Harvey
g g
P
P