HomeMy WebLinkAboutMinutesr~
PRaJEG~"T REVIEW COMIVIITTEE REPORT
3
December 28, 1992
fiO: Clifton Taylor, P.E., Lockwood, Andrews: & Newnam
2710 N Stcmmons Frwy, Ste 120, Dallas; TX 75207
Cinemark USA, Inc.
75Q2 Greenville Ave, :Ste 800, Dallas, TX 7523.1
~~ FROM: Project Review Committee:
~, ~
Jane Kee, Senior Planner
'{ Veronica Morgan, Assistant to: the City Engineer
Julius Gribou, P & Z Representative
Dthers Attending:..
Sarr~antha Smith, Engineering Assistant
~~ Shine 'Volk, Development Caor r for
y
Sabine Kuenzel, :Staff Planner
~~ Tony Michalsky, Electrical operations Coord
,,
Smith Asst Director of-Public Services
Mark ~ ,
Mike Lavender, TCA Cable Representative
SUBIEC;T' FINAL PLAT - Gateway Park Subdlvlslon; one commercial lot .totally
9.929 acres located 1305' north of State Highway. 30 and the East. By
Pass. (93-201)
A Presubmission Conference was held Wednesday, December 23, :1992: to discuss the
above mentioned final plat. The Project Review. Committee made the f®llowing
comments:
~~ ELE~TRI~AL
~` The location of the transformer on the northeast corner of this lot is acceptable.
''~ Coordinate service details with Electrical Qperations Coordinator Tony Michalsky
,~ at (409) 764=3660.
,z
PUBLIC SERVICES:
~~
~~ .v t
Provide some kind of guarantee of either :access on prl a e property or a
temporary turn-around with a 40' radius at the end of the alley. Granting of a
~!~ public access easement araund he building by eparate instrument received prior
to issuance of a building permit will be :acceptable. Coordinate details with.
Assistant Director of Public .Services Mark Smith at (4a9) 764-3690.
+: "'
;,.
a
PRC Report
Gateway Parke
Case #93-2~1
Page 2
ENGI~fEERING:
The ri ht-of-wa for the public alley must be included on this plat..
g y
~' Show the location of the flood lain,
p
The ro osed rautin of the sewer service to the existing 21" sewer line as
p p, - g
.___
proposed in the impact study is acceptab e.
Submit fans for ut it service connections be weep the existing service .for .the
_ ,p Y
Sam_ site and the service for this project.
Submit construction documents for the proposed sanitary sewer line.
~~ he hi hwa de artment has a reed to a deceleration lane on the State Hi hwa
T_ g y p _ _g_ g Y
6 fronta e road. An agreement has not yet been reached on the changes to State
g
Highway 3 ~,
snot
lnemark ha
and C
The. develo merit agreement between United Savings Bank
~~
been executed. The City well follow up and keep the applicant informed.
I'II' ~
~! Coordinate details with Assistant to the City Engineer Veronica Morgan at {409)
764-3570.
~,
a
TCA CABLE:
Su ested that a licant install a s are conduit similar to the electrical and
telephone plans o allow for cable service. Coordinate service requirements w1t
TCA Cable Representative Mike Lavender at (409} 546-244.
I
SUBMIT 1 FILM POSITIVE ANI~ 10 COPIES OF THE REVISED FINAL PLAT BY
THURSDAY, DECEMBER 3Q, 1992 TO BE INCLUDED IN THE PLANNING AND
ZONING COMMISSION PACKETS FOR THE JANUARY. 7, 1993: MEETING.
~;
:I
'I
l
'~