Loading...
HomeMy WebLinkAboutMinutesr~ PRaJEG~"T REVIEW COMIVIITTEE REPORT 3 December 28, 1992 fiO: Clifton Taylor, P.E., Lockwood, Andrews: & Newnam 2710 N Stcmmons Frwy, Ste 120, Dallas; TX 75207 Cinemark USA, Inc. 75Q2 Greenville Ave, :Ste 800, Dallas, TX 7523.1 ~~ FROM: Project Review Committee: ~, ~ Jane Kee, Senior Planner '{ Veronica Morgan, Assistant to: the City Engineer Julius Gribou, P & Z Representative Dthers Attending:.. Sarr~antha Smith, Engineering Assistant ~~ Shine 'Volk, Development Caor r for y Sabine Kuenzel, :Staff Planner ~~ Tony Michalsky, Electrical operations Coord ,, Smith Asst Director of-Public Services Mark ~ , Mike Lavender, TCA Cable Representative SUBIEC;T' FINAL PLAT - Gateway Park Subdlvlslon; one commercial lot .totally 9.929 acres located 1305' north of State Highway. 30 and the East. By Pass. (93-201) A Presubmission Conference was held Wednesday, December 23, :1992: to discuss the above mentioned final plat. The Project Review. Committee made the f®llowing comments: ~~ ELE~TRI~AL ~` The location of the transformer on the northeast corner of this lot is acceptable. ''~ Coordinate service details with Electrical Qperations Coordinator Tony Michalsky ,~ at (409) 764=3660. ,z PUBLIC SERVICES: ~~ ~~ .v t Provide some kind of guarantee of either :access on prl a e property or a temporary turn-around with a 40' radius at the end of the alley. Granting of a ~!~ public access easement araund he building by eparate instrument received prior to issuance of a building permit will be :acceptable. Coordinate details with. Assistant Director of Public .Services Mark Smith at (4a9) 764-3690. +: "' ;,. a PRC Report Gateway Parke Case #93-2~1 Page 2 ENGI~fEERING: The ri ht-of-wa for the public alley must be included on this plat.. g y ~' Show the location of the flood lain, p The ro osed rautin of the sewer service to the existing 21" sewer line as p p, - g .___ proposed in the impact study is acceptab e. Submit fans for ut it service connections be weep the existing service .for .the _ ,p Y Sam_ site and the service for this project. Submit construction documents for the proposed sanitary sewer line. ~~ he hi hwa de artment has a reed to a deceleration lane on the State Hi hwa T_ g y p _ _g_ g Y 6 fronta e road. An agreement has not yet been reached on the changes to State g Highway 3 ~, snot lnemark ha and C The. develo merit agreement between United Savings Bank ~~ been executed. The City well follow up and keep the applicant informed. I'II' ~ ~! Coordinate details with Assistant to the City Engineer Veronica Morgan at {409) 764-3570. ~, a TCA CABLE: Su ested that a licant install a s are conduit similar to the electrical and telephone plans o allow for cable service. Coordinate service requirements w1t TCA Cable Representative Mike Lavender at (409} 546-244. I SUBMIT 1 FILM POSITIVE ANI~ 10 COPIES OF THE REVISED FINAL PLAT BY THURSDAY, DECEMBER 3Q, 1992 TO BE INCLUDED IN THE PLANNING AND ZONING COMMISSION PACKETS FOR THE JANUARY. 7, 1993: MEETING. ~; :I 'I l '~