HomeMy WebLinkAboutMinutesPROJECT REVIEW C~NJCMITZ'EE REPORT
December 28, 1992
TQ Don Garrett, Garrett :Engineering
4444 Carter Creek Pkwy, .:Bryan, TX 77802:
Lynn Elliott
3 Graham Road .South, College Station, TX 77845
FRaNI :Project: Revlew, Committee:
Jane Kee, Senior Planner
Veronica Morgan, Assistant to the City Engineer
.::Julius Gribou, P & Z Representative
Others.:.:. Attending:
Samantha Smith, Engineering Assistant
Shirley Volk, Development. Coo ' ator
Sabine Kuenzel, Staff Planner
Tony Michalsky, Electrical Operations Coord
SUBJECT: FINAL PLAT - Elliott 5'ubd~vislon one commercial .lot, totallin 2.0
g
acres located .along Graham Road near Wellborn Raad. (93-2~0)
A Presubmssion Conference was held Wednesday, December 23, 1992 -to discuss.: the
above mentioned final plat. The Project Review Committee made the following
comments:
ELECTRICAL:
Provide an easement along .the rear property line to cover the existing utilities.
The easement must be a minimum of 15'; however,:... 20' is preferred. Coordinate
details with Electrical Operations Coordinator Tony Michalsky at (409) 7643660.
PLANNING:
_ Replace the old dedication and signature- blocks with current information and
signatures. Coordinate details with Senior Planner Jane Kee at 409 764-3570.
( )
SUBMIT 1 FILM POSITIVE AND 10 COPIES OF THE REVISED :FINAL PLAT BY
THURSDAY, DECEMBER 3D, 1992 TO BE .:INCLUDED IN THE PLANNING AND
ZONING COMMISSION PACKETS FOR THE JANUARY '7, 1992 MEETINGL
AGENDA ITEM N0.3: Consideration of the revised Master Pre ' Plat of the Nantucket
Subdivision and the fiuunal plat of .Nantucket Phase IIL located in the E.T~T. X93-3Q0 & 93-202)
City Engineer Pullen presented the_staff report and explained that the proposed final. plat matches the layout
of .the previously approved ,master ::preliminary plat.. with the exception of lot and block numbers. The
applicant .has: submitted a revised master preliminary plat that has reconciled -these differences. Staff
recommended approval of the .final plat.
Commissioner Hall questioned taff as to the sidewalk requirements in the E.T.J. and if the new sidewalk
ordinance pertains to areas in the city's E.T.J.
Senior Planner Kee stated that idewalks have not been required on E.T.J. plats in the past. as long as the
.streets were built to rural standards. The ordinance amendment did not change these requirements.
Commissioner Hall moved .to recommend approval offinal plat of Nantucket Phase III subdivision located in
the E.T.J.. Commissioner Herring seconded the motion. which passed unopposed (7 - 0).
..AGENDA ITEM N0.4: Consideration of a final,plat of the. Elliott Subdivision. (93-2U0)
City EngineerPullen presented the: staff report. and explained. that in 1990, this plat was considered and
approved by the City. At hat time, it was an E.T.J, plat and required consideration. and approval of the
County Commissioner's Court. Ths.:approval .never took place and the. plate was never filed for. record. The
property has since been annexed.. When the _applicant requested that the city file the plat, the legal
department indicated .that the prior ,:approval was void- because of the requirements for consideration of an
ET.J..p1at .were never met. Staff recommended approval with the addition of a utility easement along the
south side. .
Commissioner Marion moved to recommend approval of the` final :plat for the .Elliott .Subdivision with .staff
recommendations, Commissioner Hall seconded the motion which passed unopposed (7 - 0).
AGENDA ITEM N0.5: Consideration of a fiinal plat. of the Gateway. Park Subdivision. t93-201)
City Engineer. Pullen...presented.. the staff report and stated. that the preliminary plat of this subdivision was
previously approved by City:: Council.. The proposed final plat complies, with the Germs of that approval. Staff
recommended approval with the following conditions;
-- inclusion of a 50' public right-of-way along the .eastern boundary;
-- :dedication by separate.. instrument of a public access easement for emergency vehicle
'turnaround on he back part of the Cinemark parking lot;.: and
-- ..show floodplain location on the plat.
Cliff Taylor, representative of Cinemark,.... approached the Commission and. stated that all of the conditions are
.acceptable. The floodplain and the 50' public right-of-way are shown on the revised plat. The easement for
emergency vehicle turnaround will be submitted to city_staff next week for their review and approval.
Commissioner Gribou recommended: approval of -the final plat of ..the Gateway Park Subdivision with staff
recommendations. Commissioner Herring. seconded the motion which passed unopposed (7 - 0).
AGENDA ITEM NO. b: Other business..
Commissioner Lane questioned staff as to the annexation of E.T.J. areas of the city.
City Planner, Callaway .explained that in the. recent Foxfre annexation,. sewer facilities were the biggest
problems. MOSt of the subdivisions in the E.T.J. have decided to use the rural .street. section of the
:Subdivision Regulations and not supplied. sanitary sewer.
P ~ Z Gommrssro~ January 7,1993: Page 3